Post Occupation Evaluation: A Means to an End?

May 25, 2015

Download

Real Estate

Whitbags

A copy of the presentation from Integral UK's Mark Whitaker at the BIM Academny Event at Liverpool University on Post Occupancy Evaluation, BIM & Facilities Management
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Post Occupation Evaluation: A Means to an End?

Post Occupancy Evaluation: Post Occupancy Evaluation: A means to an end?A means to an end?

Wednesday 26Wednesday 26thth February 2014February 2014

Page 2: Post Occupation Evaluation: A Means to an End?

OutlineOutline

1. An Introduction

2. CSF – Common Sources of Frustration

Th S l ti P t O E l ti3. The Solution – Post Occupancy Evaluations

4. Government Soft Landings Approach to P.O.E.

5. The Role of the Facilities Management Industry

Page 3: Post Occupation Evaluation: A Means to an End?

2. Common Sources of Frustration2. Common Sources of Frustration

“I can never book a meeting room”

“The office is too noisy”

“The glare off my screen gives me a migraine”

“We are maintenance contractors, not (re)designers”

“I have to wait 1½ mins for the lift everyday at lunch”

“It is too hot in summer and too cold in winter”It is too hot in summer and too cold in winter

Page 4: Post Occupation Evaluation: A Means to an End?

3. Post Occupation: the Challenge?3. Post Occupation: the Challenge?

or

Page 5: Post Occupation Evaluation: A Means to an End?

POE POE –– Aims?Aims?

F db k B ildi P f i UFeedback on Building Performance in Use:

Has the Project Brief been met?j

H f l i th k l d li d i ti How successful is the workplace delivered in supporting:

The needs of the occupying organisation

The end user requirements

Page 6: Post Occupation Evaluation: A Means to an End?

POE POE –– How?How?

Interactive:

Questionnaires

Interviews

Workshops

Page 7: Post Occupation Evaluation: A Means to an End?

POE POE –– How?How?

Analytical:

Environmental Measurements

Space Management

Cost Analysis

Page 8: Post Occupation Evaluation: A Means to an End?

The Solution?The Solution?

Listen

ReflectFeedback

Learn

Page 9: Post Occupation Evaluation: A Means to an End?

7 Key P.O.E. Steps7 Key P.O.E. Steps

d f d1. Strategy – Identify Need

2. Decide Issues to Address

3. Define the Why & How

4. Select Feedback Approach

5. Collect Feedback5. Collect Feedback

6. Analyse & Report

7. Action & Learn key recommendations

Page 10: Post Occupation Evaluation: A Means to an End?

4. Government Soft Landings4. Government Soft Landings - Policy

1. Assets = reduce cost & improve performance

2. GSL Lead & Golden Thread

3 Manage Aftercare3. Manage Aftercare

4. Post Operational Evaluation

5. BIM= Data Management Tool

Page 11: Post Occupation Evaluation: A Means to an End?

Government Soft LandingsGovernment Soft Landings - Objective

BIM + GSL = Better Outcomes

To champion better outcomes for our built assets during the design &construction stages through Government Soft Landings (GSL) powered by aBuilding Information Model (BIM) to ensure value is achieved in the

ti l lif l f toperational lifecycle of an asset.

Page 12: Post Occupation Evaluation: A Means to an End?

Government Soft LandingsGovernment Soft Landings

P.O.E. = The Principle:

“Post Occupancy Evaluation to design/construction team and capture lessons learnt to inform future projects will become part of standard practice.

POE information will be stored on the asset information model”

Page 13: Post Occupation Evaluation: A Means to an End?

Government Soft LandingsGovernment Soft Landings

P.O.E. = S.E.E. Measures:

Functionality & Effectiveness (Social)

Environment ( Environment)

Cost (Economic) Cost (Economic)

Page 14: Post Occupation Evaluation: A Means to an End?

Government Soft LandingsGovernment Soft Landings

P.O.E. = The Future:

Standardisation for Methods of Measurement Standardisation for Methods of Measurement

Page 15: Post Occupation Evaluation: A Means to an End?

5. FM Industry 5. FM Industry –– Driving ChangeDriving Change

Page 16: Post Occupation Evaluation: A Means to an End?

Key BIM DriversKey BIM Drivers

All t b ti & l ti i i i f db k? Allow us to be more proactive & less reactive in gaining feedback?

Facilities Management is a “People” not simply buildings business. Regular feedback critical.

Compares required vs. actual outcomesp q

Creates a Standard Framework for measurement

Learning becomes a requirement

Page 17: Post Occupation Evaluation: A Means to an End?

ConclusionConclusion

“Tell me and I forget, teach me and I mayTell me and I forget, teach me and I may remember, involve me and I learn.”

j i kliBenjamin Franklin

Page 18: Post Occupation Evaluation: A Means to an End?

My detailsMy details

E: [email protected]

M: 07764 840 694

T: @Whitbags

B: www.whitbagsinfm.wordpress.com