POST- CLEARANCE ENVIRONMENTAL REPORT OF
ELEMENT ONE
(Commercial Project)
Village Fatehpur, Sector 47 & 49 GURGAON, HARYANA
Prepared by
SHIMI RESEARCH CENTER PVT. LTD.
Submitted to
MINISTRY OF ENVIRONMENT & FORESTS (New Delhi & Panchkula)
SIXTH REPORT, JUNE 2015
Element One, Commercial Project, Sector 47 & 49, Gurgaon
2
SALIENT FEATURES OF THE PROPOSED PROJECT
Name of Project : Element One
Name of Company : M/s Clarion Properties Ltd.
Location: Village Fatehpur, Sector 47 & 49,
Gurgaon, Haryana
Land Title : Licence No. 86 of 2011 dated 20/9/11,
Town & Country Planning Department
Haryana
Plot size : 2.7625 Acres (11,179.35 SQ.M) for both A-
Block (Sector 47) and B- block (Sector 49)
HUDA Norm :
Permissible FAR: 1.75 (19563.87 SQ.M)
Proposed FAR: 1.749 (19555.36 SQ.M)
Permissible G. Coverage: 40% (4471.74
SQ.M)
Proposed G. Coverage: 35.099% (3994.65
SQ.M)
Project Concept : Commercial colony in two blocks, i) Block –
A in Sector 47 and Block – B in Sector 49
Element One, Commercial Project, Sector 47 & 49, Gurgaon
3
Project Structure :
Project consist of two blocks A & B
Block – A located in Sector 47, Gurgaon
Block – B located in Sector 49, Gurgaon
Both blocks are separated by 30 m wide
sector road
Block – A consists of Basement + Ground+
First floor
Block – B consists of 3 Basements +
Ground + 8 floors
Project Areas :
Total Plot Area = 11,179.35 SQ.M (2.7625
acres)
Total Built up Area 34,331.583 SQ.M
Permissible G. Coverage: 40% i.e. 4,471.74
SQ.M
Proposed G. Coverage: 35.10% i.e.
3,994.65 SQ.M
Permissible F.A.R. Area (175%) :19,563.87
SQ.M
Proposed F.A.R. Area (174.9%) :
19,562.464 SQ.M (174.999%)
Basement Area : 12,050.304 SQ.M
Service Area : 2,718.815 SQ.M
Element One, Commercial Project, Sector 47 & 49, Gurgaon
4
STATUARY APPROVALS
Land Registry : 4th December 2010
Electric Connection : Applied for 2822 KVA load and received a
Copy of letter from HVPNL to DHBVNL
vide Memo
No. Ch.70/NCR/GRG-192/Vol.-II
dated 114/03/2012
Zoning Planning : Approved vide Memo No. ZP-755/JD(BS)/
Approval 2011/15985 dated 31/10/2011
Drawing Approval : Approved vide drawing No. DG,TCP-2815
dated 21/10/2011
Pollution NOC : Consent received having ref. No.
HSPCB/Consent: 2821213GUNOCTE
124912 dated 25 Sep 2013
Environmental : Clearance Received having Ref
Clearance No. SEIAA/HR/2012/241 dated 03/08/2012
Aravalli Notification : Aravali Notification received vide Memo
DC Gurgaon No /03/MB dated 21 Mar 2013
Element One, Commercial Project, Sector 47 & 49, Gurgaon
5
PROJECT STATUS
The project status of Element One, Block - B is as follows:
1. 95% of all structural work is complete.
2. Construction of all ramps are complete.
3. Masonry work of basement, GF to 6th floors are complete.
4. Masonry work of 7th & 8th floors are under progress.
5. Laying of firefighting lines is under progress.
6. Electrical work is under progress.
7. HVAC work is under progress.
8. Trimix flooring of the 1st & 2nd basement is complete.
9. Trimix flooring of the 3rd basement(90% complete)
10. A temporary site office has been set up at Block - B.
11. There are 4 DG sets with acoustic enclosures at the site.
12. A batching plant is used at the site.
13. Primary water treatment plant is installed at site to utilize the STP
treated water during the construction.
14. Cement bags are stored in closed area.
15. Workers are using safety helmets in the premises.
Element One, Commercial Project, Sector 47 & 49, Gurgaon
6
16. No hazardous material and bituminous material has been
generated from site. Every precaution has been taken to prevent
groundwater from contamination.
17. No stagnant water formation is found in the premises.
18. Regular water spray is being used to suppress the dust generated
from haul road inside the construction site.
The project status of Element One, Block - A is as follows: 1. Basement slab is complete.
2. Slab shuttering of the 1st floor is under progress.
3. All ramps are complete.
4. The labor camp area is located in the Block A of the project site.
5. Temporary labor camp with adequate sanitation has been provided
for the labors
Green Belt Development The site is under the initial phase of construction and so far no green belt development has been done at site. S. No. Year Area
Covered No. of Plants Planted
Species of Plants Planted
Expenditure Incurred
1 June 2015
Nil Nil N/A Nil
Element One, Commercial Project, Sector 47 & 49, Gurgaon
7
SAFETY MEASURES The other safety measures to be followed during the construction period
by Project Manager/Deputy Project Manager
That no staff should go to the project site without wearing helmets
and safety shoes
Wearing helmets need to be mandatory for visitors
Safety net should be used at risky areas
That access to and from site should clear
That proper signboards should be available about safety and safe
exit points
All water tanks at site should be properly covered for further use.
TESTING Ambient Air Quality The ambient air quality monitoring was conducted in May 2015.
Monitoring was carried out at two stations for 7 days. The guidelines for
selections of ambient air monitoring stations as given in IS – 5182 part
14, were followed. These guidelines state that, “when the objective of air
sampling is to identify the contribution from specific sources of pollution,
the sampling locations should be located in upwind and the downwind of
Element One, Commercial Project, Sector 47 & 49, Gurgaon
8
such sources”. The location of air quality monitoring stations should
satisfy the following conditions:
1. The site should be representative of the area selected;
2. The station should be set up and operated so as to yield data that
can be compared with those from stations within the network
Sampling Stations:
Station A-1: Center of Block – B
Station A-2: Near batching plant, Block – B
Duration of Sampling
Duration : 7 days during May 2015
Period : Sampling was done 24 hourly continuous of
SPM/RSPM and 8 hourly for gaseous parameters.
Sampling Procedure
Time averaged in – site sampling was adopted by passing a known
volume of air through a trap, and a collecting medium (filter paper and
bubbler). Repairable Dust Sampler was used for the purpose.
This procedure was adopted because there are no short-term variations
and low concentration of gaseous pollutants was expected.
Element One, Commercial Project, Sector 47 & 49, Gurgaon
9
Analytical methods followed for ambient air quality monitoring
(i) Suspended Particular Matter (SPM):
The samples for SPM were collected on GF/A Filter paper by Respirable
Dust Sampler (RDS), operated at maximum rate of 1.5 cu.m./min. and
concentration were determined gravimetrically on 24 hrs basis.
(ii) Sulphur dioxide (SO2):
Sulphur dioxide collection was done by aspirating a measured volume of
air through a dilute acidified solution of hydrogen peroxide. For analysis,
TCM method was followed (Ref. Chapter 700, Standard Method of Air
Sampling and Analysis, 2nd edition, APHA, 1977).
(iii) Nitrogen Oxides (IS: 5182; Part – VI – 1975 ):
Nitrogen oxides were estimated by bubbling air through 0.1 N Sodium
hydroxide solution and measured as nitrate through spectrophotometer
at 540 nm.
Results
Air quality is a complex and dynamic characteristic of any area. Most of
the areas in Gurgaon and adjoining locations reel under air pollution and
construction activity is the major contributor of pollutants. The climatic
conditions and high rise buildings aid and abet their dispersion in the
adjoining areas. The ambient air quality results are summarized in
following tables:
Element One, Commercial Project, Sector 47 & 49, Gurgaon
10
SPM µg/m3
DATE A-1 A-2 Max Min Mean Max Min Mean 01.05.15 402 130 331 384 175 252 02.05.15 328 182 220 368 241 314 03.05.15 375 215 271 390 230 315 04.05.15 372 160 318 418 183 298 05.05.15 357 213 302 354 212 292 06.05.15 393 195 286 389 198 297 07.05.15 379 215 263 390 198 313