EMPORIA 2019 BOND ISSUE POST BOND Board of Education Nov. 13, 2019
6

POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

Aug 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

EMPORIA 2019BOND ISSUE

POST BOND

Board of Education

Nov. 13, 2019

Page 2: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

11/13/2019 2

Page 3: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

11/13/2019

NEXT STEPS• Bond Sales schedule – Piper Jaffray

• Reviewing scope with Engineers

• Individual projects

• Project schedule scenarios & sequence

• Project kickoffs

3

Page 4: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

11/13/2019

PROJECT DEVELOPMENT• Programming with District personnel

• Design Phases• Schematic Design• Design Development• Construction Documents• Bidding• Construction

• Incremental design reviews

• Budget checks

• Communication with Community4

Page 5: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

11/13/2019

SCHEDULE DEVELOPMENT TO DATEBest Practices• District project priorities• Postpone projects with least determined scope• Combine like projects• Avoid winter start dates between October – March• Be sensitive to project overload

• District personnel• Design team (HTK & Consultants)• Construction team (MGC)• Subcontractor market

• Project durations• One summer projects• Two summer projects• No summer projects

5

Page 6: POST BOND · 2019. 11. 14. · • Design team (HTK & Consultants) • Construction team (MGC) • Subcontractor market •Project durations • One summer projects • Two summer

11/13/2019

SCHEDULE DEVELOPMENT• Outline Schedule Options• Develop Comprehensive Bond Schedule• Communicate to Facilities and Community

6