Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 2.43 to 2.44 - Pill Memorial Club Bus Stops, Car Park Plan and Construction Compound The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o) Planning Act 2008 Author: CH2M Date: November 2019
4

Portishead Branch Line (MetroWest Phase 1) · 1/2/2020  · length and protects the crossing area from parked cars wrapping round the existing kerb line from Station RoadExisting

Aug 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Portishead Branch Line (MetroWest Phase 1) · 1/2/2020  · length and protects the crossing area from parked cars wrapping round the existing kerb line from Station RoadExisting

Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 2.43 to 2.44 - Pill Memorial Club Bus Stops, Car Park Plan and Construction Compound The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o) Planning Act 2008 Author: CH2M Date: November 2019

Page 2: Portishead Branch Line (MetroWest Phase 1) · 1/2/2020  · length and protects the crossing area from parked cars wrapping round the existing kerb line from Station RoadExisting

2.43 Pill Memorial Club Bus Stops and Car Park Plan The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o)

467470.BQ.04.20-290 Rev H

2.44 Pill Memorial Club Bus Stops and Car Park: Construction Compound The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o)

467470.BQ.04.20-291 Rev H

Document Index

Page 3: Portishead Branch Line (MetroWest Phase 1) · 1/2/2020  · length and protects the crossing area from parked cars wrapping round the existing kerb line from Station RoadExisting

Visibility splay based on Fig 7.18 MfS,

using assumed 25mph 85th percentile

speed which equates to y=33m of

visibility & x=2.0m

33.0

1.5

1.5

2.0

Visibility splay based Fig 7.18 MfS, using

assumed 25mph 85th percentile speed

which equates to 33m of visibility

NOTE: Forward visibility does not

follow MFS recommendation of 85th

percentile design speed for 25mph

which is 33m SSD.

Actual forward visibility SSD is approx.

27m, which equates to 85th percentile

speed of 23mph.

6.4

8

.7

6

Exis

ting r

esid

ential

access

Initial location of new

retaining wall

Existing retaining wall

Existing wall to be removed

2

Proposed build out which reduces the carriageway crossing

length and protects the crossing area from parked cars

wrapping round the existing kerb line from Station Road

Existing Electrical sub-station to remain

Existing (assumed) two telecom cabinets

to be retained

Existing trees

to remain

Exis

ting e

ntrance to

Pill

Mem

orial C

lub

Proposed uncontrolled

pedestrian crossing

Existing retaining wall to be

removed and rebuilt with

replacement hedge which

aligns with the car park

junction visibility splay

Existing car park

layout to be removed

Proposed revised

car park layout

Existing car park

layout to be retained

2

.4

4

.8

Width to be confirmed

at detailed design

7

.3

Proposed relocation of bus

stop

Location of proposed bus

shelter to reduce impact

on junction visibility

Proposed bus stop to be located

as close to the crossing point as

possible, due to the steep hill

beyond

Unable to provide bus shelter on

north-side bus stop due to

narrow footway

3

2

Minimum pedestrian/ disabled

access width of 2m to be retained

during the construction works

Existing No Waiting At Any Time

(double yellow lines) to be

re-aligned with the new kerb line

2

2

.

4

Cross Section

For Section A refer to drawing

467470.BQ.04.20-292

A

A

Order limits

5

6.2

Existing kerb between car park and

third party boundary wall

Drawing Scale:

Drawing No.

Checked by:

Approved by:

Drawn by:

Drawing

Revision

Date:

Date:

Date:

Apprvd

Project

ByRev Chkd Date Description

:D

raw

ing file path &

nam

eU

:\P

rojects\467470 N

SC

F

ram

ew

ork 2013\B

Q.04.20 M

W P

hase 1 H

ighw

ay E

ngineering\90 A

utoC

AD

\91 A

utoC

AD

P

relim

\91.2 P

ill\ 467470.B

Q.04.20-290 &

291 R

ev H

.dw

g

CH2M HILL

www.ch2m.com

1 The Square Temple Quay Bristol BS1 6DG

Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581

PORTISHEAD BRANCH LINE

(METROWEST PHASE 1)

PILL MEMORIAL CLUB

BUS STOPS AND CAR PARK

ADS 09/02/2018

ADL 13/02/2018

ADL 13/02/2018

467470.BQ.04.20-290 H

1 :100 @ A1 or 1:200 @ A3

0 5 10

SCALE 1:100 (A1)

SCALE 1:200 (A3)

METRES

Notes:

1. All dimensions are in metres.

2. Do not scale from the drawing.

3. Layout based upon Ordnance Survey base mapping and therefore any

design should be used as information only until designed on

topographical data.

4. The new retaining wall position is indicative only.

5. Bus stop locations and kerb line positions are indicative only and are

subject to detail design.

Pill Memorial Club Notes:

1. Existing 38 car parking spaces to be removed

temporarily during construction (sizes and turning

areas to be confirmed).

2. 34 car parking spaces to be reinstated permanently.

A

Layout amended to improve junction visibility & bus shelter addedOHP ADS ADL 28/03/2018

B

Note amendmentsOHP ADL ADL 09/04/2018

100023397

North Somerset Council

C

Retaining wall to the west of Memorial Club car park realigned to visibility splay

TROs added to drawing & minor amendments

ADS ADL ADL 05/11/2016

D

Car Park layout altered to gain 3 spaces

Cross section line added

OHP ADS ADL 07/02/2019

E

Note amendmentsOHP ADL ADL 25/03/2019

F

Minor amendments & red line boundary addedOHP ADL ADL 31/07/2019

G

Car park layout revisedOHP ADL ADL 04/09/2019

H

Minor amendmentsOHP ADL ADL 31/10/2019

AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
DO NOT SCALE. This drawing is to be read in conjunction with all relevant Architects, Engineers and Specialist Manufacturer's drawings and specifications. If in doubt please consult the Engineer.
AutoCAD SHX Text
Licence Number:
AutoCAD SHX Text
with the permission of the Controller of Her Majesty's Stationery Office, Crown copyright.
AutoCAD SHX Text
Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
AutoCAD SHX Text
This map is reproduced from Ordnance Survey material by Halcrow on behalf of
AutoCAD SHX Text
R
AutoCAD SHX Text
C
Page 4: Portishead Branch Line (MetroWest Phase 1) · 1/2/2020  · length and protects the crossing area from parked cars wrapping round the existing kerb line from Station RoadExisting

Concrete Mixer

6.4

8

.7

Proposed 5 space

temporary car park during

construction

Proposed site compound, working

area and material storage

Proposed turning

requirements for

construction vehicles

Existing footway to be closed with diversion

via Springfield Rd/ Newsome Avenue which

links to Newsome Avenue bus stop

Existing bus stop to

be suspended

during the works

Existing bus stop to

be suspended

during the works

Compound entrance

Minimum pedestrian/ disabled

access width of 2m to be retained

during the construction works

Order limits

Existing kerb between

car park and third party

boundary wall

6.4

8

.7

Proposed 5 space

temporary car park during

construction

Proposed site compound, working

area and material storage

Proposed turning

requirements for

construction vehicles

Existing footway to be closed with diversion

via Springfield Rd/ Newsome Avenue which

links to Newsome Avenue bus stop

Existing bus stop to

be suspended

during the works

Existing bus stop to

be suspended

during the works

Compound entrance

Minimum pedestrian/ disabled

access width of 2m to be retained

during the construction works

Order limits

Existing kerb between

car park and third party

boundary wall

Concrete M

ixer

Drawing Scale:

Drawing No.

Checked by:

Approved by:

Drawn by:

Drawing

Revision

Date:

Date:

Date:

Apprvd

Project

ByRev Chkd Date Description

:D

raw

ing file path &

nam

eU

:\P

rojects\467470 N

SC

F

ram

ew

ork 2013\B

Q.04.20 M

W P

hase 1 H

ighw

ay E

ngineering\90 A

utoC

AD

\91 A

utoC

AD

P

relim

\91.2 P

ill\ 467470.B

Q.04.20-290 &

291 R

ev H

.dw

g

CH2M HILL

www.ch2m.com

1 The Square Temple Quay Bristol BS1 6DG

Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581

PORTISHEAD BRANCH LINE

(METROWEST PHASE 1)

PILL MEMORIAL CLUB

BUS STOPS AND CAR PARK

CONSTRUCTION COMPOUND

ADS 09/02/2018

ADL 13/02/2018

ADL 13/02/2018

467470.BQ.04.20-291 H

1:200 @ A1 or 1:400 @ A3

Notes:

1. All dimensions are in meters.

2. Do not scale from the drawing.

3. Layout based upon Ordnance Survey base mapping and

therefore any design should be used as information only

until designed on topographical data.

4. The new retaining wall position is indicative.

5. Bus stop locations and kerb line positions are indicative

only and are subject to detail design.

A

Layout amended to improve junction visibility & bus shelter addedOHP ADS ADL 28/03/2018

B

Note amendmentsOHP ADL ADL 09/04/2018

100023397

North Somerset Council

50 10 20

SCALE 1:200 (A1)

SCALE 1:400 (A3)

METRES

C

Retaining wall to the west of Memorial Club car park realigned to visibility splay

TROs added to drawing & minor amendments

ADS ADL ADL 05/11/2016

D

Car Park layout altered to gain 3 spaces

Cross section line added

OHP ADS ADL 07/02/2019

Pill Memorial Club Notes:

1. Existing 38 car parking spaces to be removed

temporarily during construction (sizes and turning

areas to be confirmed).

2. 34 car parking spaces to be reinstated permanently.

E

Note amendmentsOHP ADL ADL 25/03/2019

F

Minor amendments & red line boundary addedOHP ADL ADL 31/07/2019

G

Car park layout revisedOHP ADL ADL 04/09/2019

H

Minor amendmentsOHP ADL ADL 31/10/2019

AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
DO NOT SCALE. This drawing is to be read in conjunction with all relevant Architects, Engineers and Specialist Manufacturer's drawings and specifications. If in doubt please consult the Engineer.
AutoCAD SHX Text
Licence Number:
AutoCAD SHX Text
with the permission of the Controller of Her Majesty's Stationery Office, Crown copyright.
AutoCAD SHX Text
Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.