DG7 WG1 DG1 WG2 WG3 DG 9 DG3 DG4 DG6 DG5 DG11 DG2 WG4 WG5 DG 10 DG8 TV K TV K B W F 400 2,600 1,585 552 1,922 440 1,022 552 676 450 1,218 1,498 1,436 1,265 1,400 1,795 300 1,000 2,100 900 1,227 1,135 1,227 1,135 1,565 1,135 4,315 8,432 2,915 568 667 2,710 2,240 9,767 339 327 440 max 2m 460 450 min. 300mm 1,022 337 5,052 2,015 2,700 3,362 low level radiator Soundblock fire wall to underside of stair. Service zone to full length of party wall. CO positioned to manufacturer's instructions Isolator for future shower Shaver point 50mm service zone behind boiler for pipework Boxing out of pipework Door chimes at door head height For fence position see dwg no. P/06 Service zone to party wall RWP Bedroom 2 Bedroom 1 FDS30 FDS30 75mm acoustic quilt to all bathroom walls. FDS30 Brick dimensions Storage. 2 2 2 2 Brick dimensions SD Brick dimensions P1 P2 2 2 P2 P4 2 Refer to detail 19 GM EM P5 GP GP P1 EM GM BT BT RWP Refer to detail 19 DW or TD DB RWP SVP SD 1.2x1.2 platt 1.8x1.2 platt RWP Brick dimensions DF5 DF9 DF6 DF7 DF1 DF8 DF3 DF2 WF1 WF4 WF3 WF5 WF6 DF10 WF2 DF4 W TV F 3,362 2,715 3,013 440 1,922 553 676 1,585 2,690 562 2,700 4,050 553 910 552 900 1,135 50 1,895 1,135 1,227 1,135 1,227 1,008 1,135 1,565 2,600 600 2,100 1,000 min. 300mm Service zone to full length of party wall. Second bedroom window to south elevation only Box in pipework Service zone to full length of party wall. CO positioned to manufacturer's instructions Isolator for future shower 50mm service zone behind boiler for pipework Bedroom 1 Bedroom 2 RWP SVP Attic hatch RWP PSV PSV FDS30 FDS30 FDS30 75mm acoustic quilt to all bathroom walls. FDS30 P1 DB P4 DW or TD Door bell chimes at high level GP GP SD DALLMAN JOHNSTONE ARCHITECTURE PROJECT MANAGEMENT REGENERATION Cottage flats plan - Ground Floor Cottage flats plan - Upper Floor FORT STREET MOTHERWELL CAIRN HOUSING ASSOCIATION
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
- Through careful planning circulation reduced to 12.5% (32% allowed) this allowed more space for working at records A and also a spacious meeting room B within the overall area allowed by the Health Board.
What the doctors need:- Healthy building- Low maintenance- Flexible for future change- Sustainable- Energy efficient- A functional building- Good working environment- Safe for staff & patients
What the patients need:- Easy orientation- Provision of privacy & dignity- Comfortable environment- Natural light- Calm building- Healthy materials
1 2
3
4 5
1
2
3
4
5
AllanderSurgery
ARCHITECT:Dallman Johnstone Architects
STRUCTURAL ENGINEER:Roy Easton & Company
QUANTITY SURVEYOR:Doig & Smith
CONTRACTOR:David H Allan
What does the Health Board Need:- A building that promotes good health not dis-ease- Good value for money- Low maintenance- Flexible enough to allow for change- Sustainable- Energy efficient which allows for cost savings year after year
futu
re e
xpan
sion
We can walk you through the spacewith a 3600 3D image.
doctors public staff
B
A
min
. 150
mm
Protan sealantProtan termination bar
Fastener withweatherproof washer
Protan membrane
40mm weld
Protan membraneProtan cord
Protan restraint bar & fastenerProtan cover strip
Protan vapour control layer
10mm plywood
50mm Kingspan TR21LPC/FM or Quinntherm QF
40mm weld
Protan membrane
40mm weld
Protan restraint bar & fastener
Protan cover strip40mm weld
Protan fleece
200mm rafters
150mm Kingspan K7 or Quinntherm QW
12.5mm plasterboard
timber joists, heights vary to form water fall
150mm rafter ties
10mm plywood
Gutters temporary removed for access
Tyvek sarking membrane
325mm strip of BS8747 Type 5U or equivalentUV durable underlay dressed into gutter
Marley ludlow major eaves clip
Marley Eternit 25mm over fascia strip ventilator
Marley Eternit felt support tray
Marley Eternit continuous rafer roll
Tilting fillet
18mm sarking board
F
W
Fz
DW
RE
TV
TV
TV
RE
F/Fz
SD
SD
RE15
0
150
900
±0.000
-0.300 -0.540
-0.300
-0.440-0.300A
A
AA
BB
door removed openingwidened, new glazed doors
wall infilled
window infilled & new door
wall removed
new rooflights
new rooflight
Door re-hung
new gas fire & vent throughfloor-min.10cm2 air vent size
tap repositioned
existing drainage pipescut below floor & sealed
assumed line ofexisting drainage
existing fire place opened
existing lathe & plaster removednew insulation & plasterboardfitted, see spec. point 4.2.
gas meter
new fanlight
existing stone retainedbelow worktop height
underfloor ventilation duct
under wall units lights
window removed wall infilled withstone & lime mortar to match existing
Kingspan Nilvent Breathable sarking membrane.Horizontal lap between runs of breathablesarking membrane with 75mm wide doublesided acrylic adhesive tape.
Galvanized steel beam exposed
2x25mm Kingspan K7insulation inside steel beam1x25mm Kingspan K18 insulatedplasterboard to inside face of steel flanges
1x25mm Kingspan K18 insulatedplasterboard to inside face of steel columns
Before
After - visualization
F DWW
V
SD
SD
TV
V
350 350
350
350
350
150 300min.840
min
.840
150
1,00
0
6,150
3,10
0
350
new boiler
door removedwall infilled
electric meter &fusebox repositioned
door re-hung
walls removed
new beam
U-value 1.8 W/m2K
Phone socket removed& power points removed
Renew aerial
Power point removed
Stair ballustrade replaced
Existing stove & hearth repositioned. Hearth - min.125mm thick concrete slab.Non combustible solid decorative finish arround stove.New double wall flue - distance of min.25mm is required between flue inner walland any combustible material where flue penetrates roof & ceiling - see D01.Spillage test required to living/kitchen/dining after works completed by contractorto determine the internal/external pressure difference which caused spillage atvarious thermal outputs.The test to be carried out in accordance with BRE paper IP 7/94.
Envirograf Intumescentnon - fibrous fire-stop60 mins blocks SIB1
60 min FR ceilingRefer to detail D08
2x100mm TW55 Kingspaninsulation on existing ties
See specificationparagraph 3.5.
30 min FR partition
Non combustiblesteel stair to bothflights.
Reopen vent to gable
Riser 167mmGoing 250mmPitch 33.8 deg.
All service perforations greater than 40mm through60min protected zone (floor or ceiling) to have 60mmfire protection with Promat Promoseal or equal andapproved.
Existing steelwork
2 layers of 12.5mm FireLine.60 mins fire resistant ceilingBritish Gypsum ref.: C106053Refer to detail D08