Mar 31, 2016
" Architects don't invent Anything, they trAnsform reAlity "
AlvAro SizA
01Into the mountain
03Into the town
04Other works and CV
02Into the lake
01
04
3nd Year StudioType: Commercial hotel & restaurantLocation: Piancavallo, ItalyJuly 2013
Our project is on the ski resort - Piancavallo, Italy. As commisioned by the local gonvernors, our main goal is to make Piancavallo a more fascinating place to come. In achieving such a goal, we redesign the restaurant and propose to design a hotel next to the ski lift on the middle of the mountain, which will attract visitors to spend more time on the mountain enjoying the natutral scence closely. We conceive a ski trackdirectly connect to the hotel and a track extended from the hotel, which give the visitors an unique experience on their vacation. Benifited from the lower southern slope, people can enjoy a spectacular panarama view from the southern part.
INTO THE MOUNTAIN - Village Hotel for skiing
05
Characteristics of the site
Typical mountain house in that area
Mountain
View
Snow skiing
Where we are
Our sitePiancavallo town
Considering about the mountain, we face the problem of transportion of the constraction materials and the extreme weather condition. And then we want to give a feeling of growing out of the mountaion to our design
Because in winter, there is a lot of snow in our site, we need to maximize the adventages of the snow,and minimize the positive effect of the too heavy snow.
The very massive heavy wall consist of the stones which are quarried near the building site
For the roof, it is made of stone slates, which are also quarried from the local area.And it has a quite steep slope in order to make sure the heavy snow will slide down.
Considering about the skiing people, we are trying to minimize the inconvenience of the equipments, like their special shoses and ski, when they have just finished skiing and are going to the hotel.
In our site, fortunately, we have a wonderful view, which is looking towards Venice and the Adriatic Sea.So in our design we shouldn't block the view, however, we should maximize its value.
06
Accessibility analysis of the hotel
Path connects the site and the ski track Ski lift connects the site and the town
View Analysis
The site naturally has a wonder panorama view on the south.
We put our design b e l o w t h e p l at fo r m to m ax i m i ze t h i s p o s i t i ve aspect.
The site is at an important area where many ski tracks intersect and connect with each other. The primary method to reach the site is using the ski lift on the east. Besides, the site also can be reached from the higher ski track. What is more, in summer time, mountaineers can acess the site by foot.
07
08
Unit generation process
a.The Unit design begins with a simple box
b. Then pull down a point to let snow fall
c. In order to enlarge the slope angle while retaining the same height of the unit, the form line recesses
d. pull up the back accordinglly to fill the landform
Flow analysis of Unit A
Flow analysis of Unit B
We concive two types of units- Unit A for two persons and Unit B for 4 persons.
Each unit is generated according to the landform and fits well into the mountain.
The unit is designed to be as compact as possible in order to face the extreme weather in winter.
Kitchen, storage
Dining areaToilet
Ski lift control room
Generation Process of Restaurant
Function of the restaurant
1. Considering the spread charateristic of the original design, we begin the redesign process with a cube. All the functions are included in this cube
2. Considering the long span of the construction, we conceive 2 snow collect spots by cuting out 2 pieces from the cube
4. In order to strengthen the relationship between the restaurant and the platform and make the entrance protected from snow, we cut the remaining part.
3. Then, in order to aquire a steep roof (slope angle larger than 30 degree), we pull up and pull down the edges of the cube accordingly
In our project, the restaurant is one of the most crucial part of our design. Because it is connection point to the hotel as well as the platform.Base on the former design, we make the building more integrated.
Staff living area
09
Cut into sereval pieces
The platform connects the hotel and the restaurant
General idea of the project
A.
B.
C.
D.
E.
F.
Begin with a cuboid
Add common areas between pieces
Bend it to follow the shape of mountain
Form the general figure of the hotel
10
Staff Flow
Ordinary Guess Flow
Skiing Guess Flow
Storage
Kitchen
Platform
Hotel
Staff living area
Ski lift control room
Toilets
Restaurant
Reception
Corridor and common space
Function Analysis
We seperate the flow of the skiers and the flow of the ordinary guess by adding a ski track between the platform and the hotel. The staff flow is completely seperated with the guess flow, which gives the staff more privacy.
Compared to the original restaurant we make the following differences: 1.Enlarge the staff living area 2. Add more toilets and make it more convenient for the skiiers to go to toilet 3.Enlarge the restaurant space 4.Intergate the control room with the whole building complex 5.Remain the existing basement
Flow Analysis
N
Maximize the south window opening and minimize the window open on the north to optimize the solar gain and avoid the thermal lost.
Negative windows
Positive windows
Positive windows
N
Some openings are open at the north side of the corridor in order to avoidthe tunnel effect caused by the wind.
Wind AnalysisSun Analysis
RoofSlate 10mmBatten 25mmCount batter 45mmWaterproof EPDM rubber 2mmThermal insulation rigid (EPS) 200mmVapor barrier 5mmRoof wooden sheathing 18mmWood purlin 80mmconcrete rafter 240mm
Floorwood floor board 20mmmortar 10mmconcrete mud slab 30mmPET L-shaped strip Sound insulation wood fiber 10mmVapor barrier 5mmThermal insulation rigid (EPS) 50MMPrecast concrete floor slab 150mm Thermal insulation rigid (EPS) 50MMVapor barrier 5mmMortar 10mmWood ceiling board 20mm
WallLime stone adhered by cement Waterproof EPDM rubber 2mmThermal insulation rigid (EPS) 150mmVapor barrier 5mmPlaster finishing 3mm
Foundationwood floor board 20mmmortar 10mmconcrete mud slab 30mmPET L-shaped strip Vapor barrier 5mmThermal insulation rigid (EPS) 150mmCast in place reinforced concrete 150mmWaterproof bitumen 5mmMad slab of unreinforced concrete 25mm
Roof
Wall
Floor
Foundation
11
02
12
4th Year StudioType: Urban designLocation: Carmagnola, ItalyJanuary 2014
INTO THE TOWN - PUBLIC FACILITY CENTRE
The project situates in a small traditional city in Italy. After analysing the urban environment, we make a general urban plan for a particular district of the city and go further into a block for urban design. In this project we go back to design some more simple and traditional figures of the buildings in order to be harmonious to the environment, but more focus on the urban arrangement and public space.
pote
ntial
vac
ant s
pace
publ
ic fa
cilit
y
com
mer
cial
axi
s
wea
k co
nnec
tion
usel
ess r
oad
inte
nse
traffi
c b
arrie
r
lack
of c
yclin
g pa
ths
Design AreaDouble-way road which has potential to be transformed into highway
Residential Area
FarmlandActivity Area
Unproper sidewalk
Residential
Commercial Area
Commercial Area
Intensely
Way to city center
Via Torino
Sidewalk under bad condition
tra�cable
Via Torino_commercial axis_emphasizing the connection between different public space_green belt along it _reduce traffic (one direction road)_improve safetiness: safe street crossing (elevated platform) speed limit (zona 30)
Via Novara_new use: is transformed into the highway it is taking important traffic load away from Via Torino
Places for People_square and community centre_add more public service _more activity place and green area for people interaction
Make connections_add cycling paths considering the needs of accessing key services
Enrich the Existing_agricultural center and green house
SWOT Analysis Actions
_educational center
Strenghts
Strenghts
strong agricultural identity
hosts many local events through out the year
high residential density
existing green areas
Weaknesses
Weaknesses
few gathering places
intense traffic road as a barrier
lack of cycling paths
lack of public services
bad pedestrian sidewalk condition
uselessness of Via Novara and some other road
Opportunities
Opportunities
presence of open spaces
new commercial activities
Threats
Threats
weak connection between different public spaces
high multiethnic and immigration population
gree
n ar
ea
high
resid
entia
l den
sity
stro
ng c
ultu
ral i
denti
ty
13
Agric
ultu
ral C
entr
e
Post Offi
ce and Notary O
ffice
Education Center
Medical O
ffice and Police O
ffice
Spor
ttive
Cen
ter
Library
Comm
unity Center
Public Activities
Public Services
Commercial
Parking Areas
Highway
Green Belt
City Road
One Direct Road
Covered Sports Stadium
Gas Station
14
Action Area Map
7,21 m 2 m 6 m 1 m 2 m 7,25 m1 mone-way travel lanebuffer bufferbike lane bike lane widenened sidewalk with green beltwidenened sidewalk with outdoor bar
Proposed Via Torino Section
Via Torino, as the main main problem of the current situation, is the key point of our proposition for this district. First of all, we are going to move away the heavy traffic and turn it into a single direction road in dorder to give the priority to the pedestrian, because the Via Torino is the main connection for the public facilities in this district and also the commercial axis of our proposition, which is important to give the conven-ience and better environ-ment to pedestrian
Existing Via Torino Section
7,21 m 4 m12 m 3,25 mdouble-way travel lanesidewalk sidewalkparking
15
1. Gathering space which invites in the people with a main axis connecting the two sides
5. Passage links were created by substracting mass
6. Buildings were shaped according to the flow tendance and perception of the people. They are orientated to the open space and there is a visual communica-tion between them
3. Organising the different kind of open spaces of the site 7. Addition of roofs, shadings and nets
8. Green area and children playground were identified. A relatively private space was created and by pushing up and down a perception of continuity was attributed to the courtyards
4. Generation of the buildings blocks and of the space defined by them
Generation process of a specific area design
soccerfield
playground
squarecourtyard
green area
2. The connections were dividing the space into several perimetral blocks
16
31
24
5
67
8
SITE PLAN 1 Shop2 Sport Center
5 Community Hall6 Community Office
7 Bar8 Library
3 Restaurant4 Community Workshop
17
orthogonal, basic delimitation between indoor and outdoor perception
extended,it serves for shading
vertical shading emphasizing the space
extended more, percieved as subspace connected, it provides continuity for public space
Roof AnalyseShading System
Indoor
Shading System
Indoor IndoorIndoor Indoor Indoor
21 3 4 5 6
it define a space under it
Relationship between the square and buildings
common version
transformed version
the buildings on one side are facing the buildings on the other side, having an open space in between them
buildings are shaped and and orientated to the piazza so the perception of the space is completely different, a direct communication appears
relationship between the main public axis and intermediate spaces, spatial experience
Open public space
Indoor Intermediate space
Intermediate space
Indoor
18
Students
9:00 12:00 15:00 19:00
Human activities survey
Workersof community
Elders
Kids
Adults
Tourists
active more active
week days (morning)
Outdoor Spaces Indoor Spaces
weekend (morning)
weekend (afternoon)
week days (afternoon)
Soccer Field
Playground
Piazza
Courtyard
12
11
Function arrangement
Function frequency
1
2
Sport center
3
4
Shops
Restaurant
Workshop
Community Center
Community Office
Reading lounge bar
Library & Study room
5
6
7
8
9
10
Green Area
13
N
P
P
P PP
N
2
8
7
4 3
6
5
1
N
99
11
1213
10Entrance
Legend
Cars Direction
Car ParkingP
Sportive Activities
Commercial
Activities Center
Week days
Shopping
Visiting
Eating
Events
Relaxing
Learning
Reading
Working
Playing
Drinking
PlayingSport
Weekends
19
032th Year CompetitionType: Residential buildingLocation: ChinaSeptember 2012
INTO THE LAKE- VILLA
This project just situates beside a lake, in a very attractive landscape. The main goal is to merge the landscape and building, and to use the value of the wonderful surrounding scenery as much as possible. So we are trying to inspire from the traditional chinese garden which is a prominent example about how to combine the building and landscape.
20
Poetic scenery of the calm and peaceful lake
Chinese landscape painting also has the same beauty of bourn and sentiment of the lake.
Classical Chinese garden , which imitates the landscape in the relative small area, pursues the similar artistic conception of Chinese landscape painting
Separating the elements of the traditional Chinese garden in a vertial direction
Different elements of the villa project
Buildings G
allery and BridgePavilion and W
ater
21
Concept analysis
22
Flow analysis Roof plan
Circulation 1The Circulation 1 connects the central part of the building and the upper part, whose functions is mainly for the basic daily life of the host, including, v e s t i b u l e , k i t c h e n , l i v i n g r o o m , bedroom and the open roof space.
Circle flow 3The circulation3 connects the central part of the building and the lower part, whose functions is mainly for the guest and leisure life, including, vestibule, exhibition room, water front garden, guest room and leisure room.
Circle flow 2The circulation 2 connects the central part of the building and the central courtyard, whose functions is mainly for the daytime working life of the host, including, vestibule, kitchen, exhibition room, working room, a small library room and the central courtyard .
N
23
Lowest level plan Medium level plan
Highest level plan
Interlayer plan
water front garden guest room leisure room storage room vestibule kitchen living room small library roomworking room exhibition room central courtyard
staircase & storage room bedroom open roof space
1
1 5
1
6 7 82 3 4
510
9 10 11
11
12
14
13
12 13 14
9
8 7
6
3 4
2
Section perspective 1
24
25
Section perspective 2
26
plan view
fixing slottrack
Closed space Windows- open slightly
Doors-open largely Open space
In traditional chinese building, usually some facades don't typically consist of wall, windows and doors, but is built with a chinese elements, which looks like a combina-tion of door and window and can be rotated independently. Several this kind of elements stand aline to form the wall.
General wall structure
Different wall conditions
Building
Landscape
Building and landscape surround each other
Brick wall study with Grasshopper and Rhino
Serralunga d'Alba, Italy
2013
Tourist Pavilion
Basel, Switzerland
2013
Blur the Boundary, Open public space design
Carmagnola, Italy
2014
Turin to green, Urban farm design
Turin, Italy
2012
Student house, Environmental and technological design
Turin, Italy
2014
Residential building design
Trofarello, Italy
2012
Architecture Faculty design
Beijing, China
2014
1
2
3
16
17
18
19
20
21
22
23
4 5 6 7 8 9 10
2431 25 26 27 28 29 30
33 34 35 36 37 38
32
27
Supplementary works
教育背景
2007-2010
广东实验中学
2010-2015
华南理工大学
建筑设计专业 本科
2011-2014
都灵理工大学
建筑设计专业(英语教学) 本科
姓名: 杜翀
性别: 男
出生年月: 1992.03
民族: 汉
电子邮箱: [email protected]
联系地址: 广东广州市寺右二横路19号
经历
个人简历
2010
华南理工大学建筑学院学生会组织部干事
2011
经学院选拔获得华南理工大学建筑学院与
都灵理工大学建筑学院的双学位资格,并前
往都灵理工大学学习
2013
经过都灵理工大学建筑学院选拔参加
Serralunga d'Alba 工作坊
2012-2014
在都灵理工大学学习期间两年意大利edisu
奖学金
2014
完成都灵理工大学学业,获得都灵理工大学
建筑学本科学位
语言
中文(普通话 粤语) 母语
英语(雅思7.5分) 熟练
意大利语 基本
顺景大厦508房
兴趣爱好
体育: 篮球 足球 网球
生活: 旅行
文化艺术: 电影 摄影 炭笔画
前沿科技
软件技能
中意两国不同的教学模式使我对建筑的学习
有了更全面的认识。在意大利,我经常需要
与来自不同文化背景的学生合作,一方面要
处理各种文化差异上带来的意见不统一,另
一方面也给了我向他人学习、接触各异的思
维方式的机会。同时多次作为设计小组的核
心成员,也提高了我如何统筹规划、安排时
间、分配工作的能力。
此外我充分利用假期时间,去了欧洲十几个
国家、数十座城市。不仅亲身体验了当地传
统或现代的优秀建筑,感受着不同的城市机
理,更了解了各地的风土文化、人们的生活
方式,并尝试去发现其相互之间的联系。这
大大地开拓了我的眼界,并影响着我的建筑
观念。
自我评价
28
Finish, but not the end Thank you