CONSTRUCTIONPROJECTSFrom 2000 to 2013

Project Construction Manager / Frédéric Garrel-Luya

Page 2: Portfolio FGL 2000-2013

2000 2005 2010 2015

Antony Park Bords de Seine Campus SFR

Les Allées Royales Cités Jardins Carré des Arts

Clinique des Platanes

Clinique Ronsard

Résidence Sainte Geneviève

Commercial Facilities

Residential Facilities

Medical Facilities

Timeline of projects

Page 3: Portfolio FGL 2000-2013

Content

Commercial FacilitiesAntony Park

Bords de SeineCampus SFR

Residential FacilitiesLes allées royales

Cités JardinsCarré des Arts

Medical FacilitiesClinique des Platanes

Résidence Sainte GenevièveClinique Ronsard

Page 4: Portfolio FGL 2000-2013

Commercial Facilities

Page 5: Portfolio FGL 2000-2013

ANTONY PARK

• Client : Tertial (ICADE group)• Architect : Henri LAFONTA• Location : Antony (94) south of Paris• Construction cost : 25 M€• Period : 2000-2002• Position : General Contractor, Assistant Site Manager• Responsability : Coordination of structural work• Project description : 17,000m2 office building

Page 6: Portfolio FGL 2000-2013

Six basements built with top and down method

Page 7: Portfolio FGL 2000-2013

Top and down contruction progress

* Down structure progress as below :

* Top structure progress upward

--> Top and down structures progress at the same time

Page 8: Portfolio FGL 2000-2013

BORDS DE SEINE

• Client : COGEDIM• Architect : ARTE & CHARPENTIER• Location : Saint Cloud (92) west of Paris• Construction cost : 5 M€• Period : 2005-2006• Position : General Contractor, Construction Manager• Responsability : Construction supervision and design

review of structure, MEP and finishes• Project description : 5,000m2 office building

Page 9: Portfolio FGL 2000-2013

Airplane’s wing shape’s zinc roofPrefabricated wall panels

Page 10: Portfolio FGL 2000-2013

Prefabricated wall panels

Prefabricated wall panels delivery Prefabricated wall panels in position

Page 11: Portfolio FGL 2000-2013

CAMPUS SFR

• Client : VINCI IMMOBILIER• Architect : JP VIGUIER• Location : Saint Denis (93) north of Paris• Construction cost : 150 M€• Period : 2012-2013• Position : Construction Project Manager for VINCI

ENERGIE• Responsability : Supervision and design review of

MEP (40M€)• Project description : 240,000m2 office building

Page 12: Portfolio FGL 2000-2013

HVAC equipment Mixed steel and concrete framework

Page 13: Portfolio FGL 2000-2013

Residential Facilities

Page 14: Portfolio FGL 2000-2013

LES ALLEES ROYALES

• Client : NEXITY• Architect : Christian GIRAT• Location : Versailles (78) west of Paris• Construction cost : 15 M€• Period : 2003-2005• Position : General Contractor, Construction Manager• Responsability : Coordination and design review of

structure, MEP and finishes• Project description : 118 high standing housing

Page 15: Portfolio FGL 2000-2013

Traditionnal carpentry with slate roofHeavy rehabilitation of historical building

Page 16: Portfolio FGL 2000-2013

CITES JARDINS

• Client : OPHLM 92• Architect : Architecture 3A• Location : Plessis Robinson (94) south of Paris• Construction cost : 10 M€• Period : 2006-2007• Position : General Contractor, Construction Manager• Responsability : Coordination and design review of

structure, MEP and finishes• Project description : 95 social housing

Page 17: Portfolio FGL 2000-2013

Traditionnal dome carpentry White concrete modenature

Page 18: Portfolio FGL 2000-2013

CARRE DES ARTS

• Client : KAUFMAN & BROAD• Architect : ERAM & SCHAFIE• Location : Saint Maur (94) south of Paris• Construction cost : 13 M€• Period : 2007-2008• Position : General Contractor, Construction Manager• Responsability : Coordination and design review of

structure, MEP and finishes• Project description : 129 housing condo

Page 19: Portfolio FGL 2000-2013

Mixed materials facades (stones, tiles, lime plaster)Double floor concrete break roof

Page 20: Portfolio FGL 2000-2013

Medical Facilities

Page 21: Portfolio FGL 2000-2013

CLINIQUE DES PLATANES

• Client : GENERALE DE SANTE• Architect : Olivier LEQUERTIER• Location : Epinay sur Seine (93) north of Paris• Construction cost : 6 M€• Period : 2009-2010• Position : Construction Project Manager• Responsability : Supervision and design review of

structure, MEP and finishes• Project description : 80 beds drug rehabilitation

Page 22: Portfolio FGL 2000-2013

Vegetalized facadeVegetalized main lobby

Page 23: Portfolio FGL 2000-2013

RESIDENCE SAINTE GENEVIEVE

• Client : Association Monsieur Vincent• Architect : François GACHET• Location : Nanterre (92) west of Paris• Construction cost : 16 M€• Period : 2010-2012• Position : Construction Project Manager• Responsability : Supervision and design review of

structure, MEP and finishes• Project description : 120 beds elderly community

Page 24: Portfolio FGL 2000-2013

Prefabricated Plumbing shaftHeated or cooling floor (water pipes) using geothermal well drilling

Page 25: Portfolio FGL 2000-2013

CLINIQUE RONSARD

• Client : GENERALE DE SANTE / ISMS• Architect : Claude BLANCHET• Location : Joue les Tours (37) 200km south of Paris• Construction cost : 14 M€• Period : 2011-2012• Position : Construction Project Manager• Responsability : Supervision and design review of

structure, MEP and finishes• Project description : 100 beds psychiatric clinic

Page 26: Portfolio FGL 2000-2013

Matrice concrete facade Standard double bedroom