Top Banner
portfolio s a m e e r i s h t a y
58

portfolio

Feb 13, 2016

Download

Documents

sameer ishtay

2010-2011 portfolio including resume and all information about sameer ishtay.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • p o r t f o l i os a m e e r i s h t a y

  • Amman, JordanP.O Box 183745 Amman,11118 JordanMobile: +962-79-6763672 E-mail: [email protected]: Venezuelan/Jordanian

    To whom it may concern,

    I am seeking for a position that allows me to use my knowledge and skills to add an value to your organization. I Graduated in June 2010 with a Bachelors of Architectural engineering from the University of Jordan, after completing five academic years of Architectural program. I would be pleased to have this opportunity to work at your precious organization.

    My qualifications closely meet the requirements for a position in your company and therefore my study includes; Architectural Design, Interior Design, Landscape Design, Urban Planning & Design, and Construction Drawings.

    Attached is my Resume & Portfolio.

    I would greatly appreciate the opportunity to discuss how I may utilize my education and experience to become a part to your company, after knowing about your projects around the Middle East & around the world.Please do not hesitate to contact me for any further information.Thank you very much for your consideration.Precious

    Best Regards,Sameer Ishtay

  • Sameer Ishtay Architect / Designer | C. V.Amman - Jordan | Mobile: +962-79-6763672 | E-mail: [email protected]

    Personal Information | Gender: Male | Nationality: Jordanian,Venezuelan | Date of Birth: October 7th 1987 Place of Birth: Venezuela, Margarita island | Marital Status: Single.

    Education | The University of Jordan | Amman, Jordan September 2005 June 2010 BSc. Major | Architecture Engineering Relevant Subjects: Landscape Architecture | Urban Planning & Design | Interior Design | Working Drawings. Research Project| Conducted a study with a team on the program analysis, and site analysis of a juvenile rehabilitation center a rural area. The aim is collecting and analyzing data on site, realizing the opportunities and constrains, to fulfill the requirements of the site,community, and the project. Design Project | Phase l | Conceptual design of the project, schematic planning, form, and morphology. Phase ll & lll | Completion of the detailed design, with final presentation. Al Omareyah school | September 1998- May 2005. Islamic scientific college | September 1993- May 1998.

    Work Experience | Ishtay Al-Tamimi Housing Company, current employee, June -December 2010 Main responsibilities| Design Architect | Design a Residential Buildings a certain places in Amman. I worked with a multidisciplinary team of engineers to accommodate not only the requirements of the different ranks of people using the building, but also the prerequisites for the subsequent discipline designs. Coordinating with our site engineers, and following the specifications and design brief. Villa ishtay (private villa) | Assistant Supervisor I gained technical and managerial experience where I was responsible for ensuring that employees completed their tasks in accordance with predefined standards and procedures and kept a record of materials when they arrived to the site and how they were used. I submitted daily reports reflecting the site Status to the supervisor. responsibilities included interior design, consisting of solutions for the new program of the renovated project, quantity survey, landscape layout.

    Training in Tubieleh Team Work (TTW) | 8 Weeks Training Summer 2009. Assisted on the Following project| Villa Hisham Al-Najjar | My responsibilities included interior design, consisting of solutions for the new program of the renovated project, quantity survey, landscape layout. Samihas appartment | interior design,I shadowed the project manager during the finishing phase of the project.

    Computer Skills | Auto Cad 2D & 3D. 3D Max Maya Sketch Up. Adobe | Photoshop, and I illustrator. Microsoft Office.

    Languages | Arabic | (Mother-tongue) (spoken and written). English | (Very Good) (spoken and writing). Spanish. Courses | Spanish| Cervantes Amman. Auto Cad | University of Jordan. Adobe | Photoshop, Illustrator and InDesign. 3D Max | private course (Amman, Jordan). Maya | private course (Amman, Jordan).

    Activities & interest | I can describe myself as a helpful member within my working group, optimistic person who can work under pressure, a social person, and cope with people quickly. My hobbies : traveling, swimming, soccer, music and movies

    Others | I gave Auto CAD courses during 2007-2008. I worked with Doctor Ali Abu Ghanimeh in a competition to design a police station in Jordan 2006.

    References | Arch.Nabil Ishtay Al Tamimi +962-79-5520608 Tubieleh Team Work (TTW) +962-65666948 Arch.Thaer Quba +962-79-5591014 Dr.Ali Abu Ghanimeh +96277-7484010

    Objective | My objective is to have work in a successful architecture establishment both to nourish my personal knowledge and experience, also to offer my skills in the field that I am most passionate about; architecture. I am a qualified student with some experience and effective interpersonal skills. Being an energetic and confident individual. I possess highly developed organizational skills.

  • Personal Information | Gender: Male | Nationality: Jordanian,Venezuelan | Date of Birth: October 7th 1987 Place of Birth: Venezuela, Margarita island | Marital Status: Single.

    Education | The University of Jordan | Amman, Jordan September 2005 June 2010 BSc. Major | Architecture Engineering Relevant Subjects: Landscape Architecture | Urban Planning & Design | Interior Design | Working Drawings. Research Project| Conducted a study with a team on the program analysis, and site analysis of a juvenile rehabilitation center a rural area. The aim is collecting and analyzing data on site, realizing the opportunities and constrains, to fulfill the requirements of the site,community, and the project. Design Project | Phase l | Conceptual design of the project, schematic planning, form, and morphology. Phase ll & lll | Completion of the detailed design, with final presentation. Al Omareyah school | September 1998- May 2005. Islamic scientific college | September 1993- May 1998.

    Work Experience | Ishtay Al-Tamimi Housing Company, current employee, June -December 2010 Main responsibilities| Design Architect | Design a Residential Buildings a certain places in Amman. I worked with a multidisciplinary team of engineers to accommodate not only the requirements of the different ranks of people using the building, but also the prerequisites for the subsequent discipline designs. Coordinating with our site engineers, and following the specifications and design brief. Villa ishtay (private villa) | Assistant Supervisor I gained technical and managerial experience where I was responsible for ensuring that employees completed their tasks in accordance with predefined standards and procedures and kept a record of materials when they arrived to the site and how they were used. I submitted daily reports reflecting the site Status to the supervisor. responsibilities included interior design, consisting of solutions for the new program of the renovated project, quantity survey, landscape layout.

    Training in Tubieleh Team Work (TTW) | 8 Weeks Training Summer 2009. Assisted on the Following project| Villa Hisham Al-Najjar | My responsibilities included interior design, consisting of solutions for the new program of the renovated project, quantity survey, landscape layout. Samihas appartment | interior design,I shadowed the project manager during the finishing phase of the project.

    Computer Skills | Auto Cad 2D & 3D. 3D Max Maya Sketch Up. Adobe | Photoshop, and I illustrator. Microsoft Office.

    Languages | Arabic | (Mother-tongue) (spoken and written). English | (Very Good) (spoken and writing). Spanish. Courses | Spanish| Cervantes Amman. Auto Cad | University of Jordan. Adobe | Photoshop, Illustrator and InDesign. 3D Max | private course (Amman, Jordan). Maya | private course (Amman, Jordan).

    Activities & interest | I can describe myself as a helpful member within my working group, optimistic person who can work under pressure, a social person, and cope with people quickly. My hobbies : traveling, swimming, soccer, music and movies

    Others | I gave Auto CAD courses during 2007-2008. I worked with Doctor Ali Abu Ghanimeh in a competition to design a police station in Jordan 2006.

    References | Arch.Nabil Ishtay Al Tamimi +962-79-5520608 Tubieleh Team Work (TTW) +962-65666948 Arch.Thaer Quba +962-79-5591014 Dr.Ali Abu Ghanimeh +96277-7484010

    Objective | My objective is to have work in a successful architecture establishment both to nourish my personal knowledge and experience, also to offer my skills in the field that I am most passionate about; architecture. I am a qualified student with some experience and effective interpersonal skills. Being an energetic and confident individual. I possess highly developed organizational skills.

  • s a m e e r i s h t a y p o r t f o l i o

    Juvenile rehabilitation center | Amman, Wadi Al-Shita.

    maternity hospital | Amman, Jordan university bank-headquarters | Amman, Al-Shmesani sport hall | Madaba

    book cafe | Amman, Al-webdeh mixed-use | Amman, Al Abdali urban planing | Amman, Al Jezea

    construction drawings | Art Galery, Amman inteship | Villa Hisham Al-Najjar | Amman, Abdoun

    Graduation Project

    Third Year

    Other

    Forth Year

  • people are born with a blank page and through how they are nurtured and socialized they attain good or bad page. juvenile attained the bad page according to their environment that they have been exposed to and their experiences in life. according to theories this project deals with delinquent juveniles that their environment drove them down towards practicing wrong behavioral patterns and taking the wrong path, this project brings these juvenile back to the natural state without being affected by their negative environments triggers, they must go through a process that modify their behavior from negative to positive through neutralizing it and then improve it to make of him a good citizens.

    Traditional juvenile centers acts like preservation facility (prison), and social barrier

    Juveniles are treated equally without taking into consideration their mental and psychological needs and status

    Nobody can go back and start a new begining, but anyone can start today make a new ending

    Maria Robinson

    Juveniles in traditional facilities are isolated from outer world

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I concept

    p o r t f o l i o

  • people are born with a blank page and through how they are nurtured and socialized they attain good or bad page. juvenile attained the bad page according to their environment that they have been exposed to and their experiences in life. according to theories this project deals with delinquent juveniles that their environment drove them down towards practicing wrong behavioral patterns and taking the wrong path, this project brings these juvenile back to the natural state without being affected by their negative environments triggers, they must go through a process that modify their behavior from negative to positive through neutralizing it and then improve it to make of him a good citizens.

    Traditional juvenile centers acts like preservation facility (prison), and social barrier

    Juveniles are treated equally without taking into consideration their mental and psychological needs and status

    Nobody can go back and start a new begining, but anyone can start today make a new ending

    Maria Robinson

    Juveniles in traditional facilities are isolated from outer world

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I concept

    p o r t f o l i o

    this idea is translated into categorizing the functions in to three main categories: 1-therapy (social & psychological) neutralizing the delin-quent juveniles. 2-rehabeletation (social, educational and vocational)transitional state which neutralized delinquents by modifying his behavioral pattern from neutral to positive state. 3-self express makes juvenile express himself and show his positive side as a member in the society and see how this program benefited him. social learning theory juvenile delinquency is the result of imitation of aggressive actions. placing an individual in favorable environment where he/she would be less tempted to imitate violent behavior. general strain theory the major causes of juvenile delinquency are aversive atmosphere at home an school. a society instills in its citizenry aspirations for upward mobility and a desire for selected goals. however, when legitimate avenues to goal attainment are blocked, anomie or strain sets in. behavioral theory: reinforcement or punishment or extinction should be treated for their special requirements in groups estab-lished according to their needs.

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I concept

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I plans

    p o r t f o l i o

    +451 Floor Level

    Site Plan

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I plans

    p o r t f o l i o

    +451 Floor Level

    Site Plan

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I plans

    p o r t f o l i o

    +447 Floor Level

    +443 Floor Level

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I sections

    p o r t f o l i o

    Section A-A

    Section B-B

    Section C-C

    Section D-D

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I sections

    p o r t f o l i o

    Section A-A

    Section B-B

    Section C-C

    Section D-D

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I sections

    p o r t f o l i o

    Section E-E

    Section F-F

    Section G-G

    Section I-I

  • Graduation Project Third Year OthersForth Year

    juvenile center I sections

    Front Elevation

    Section H-H

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    juvenile center I sectionsFront Elevation

    Section H-H

    s a m e e r i s h t a y p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    juvenile center I perspective

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    juvenile center I perspective

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    Site Plan

    s a m e e r i s h t a y

    maternity hospital I concept

    p o r t f o l i o

    After considering the forces affecting the site starting with the main street. Which forced the project to be shifted to the back avoiding the noise and provide space for circulation and parking. The main part of the building was the hospital and its placed parallel to the street were the other tow parts (emergency & out patients) were placed perpendicular on the edge of the hospital to be visible. The facades of the hospital reflect the order and functionality of the project. The elevations are simple, direct and linear.

    N

  • Graduation Project Third Year OthersForth Year

    Site Plan

    s a m e e r i s h t a y

    maternity hospital I concept

    p o r t f o l i o

    After considering the forces affecting the site starting with the main street. Which forced the project to be shifted to the back avoiding the noise and provide space for circulation and parking. The main part of the building was the hospital and its placed parallel to the street were the other tow parts (emergency & out patients) were placed perpendicular on the edge of the hospital to be visible. The facades of the hospital reflect the order and functionality of the project. The elevations are simple, direct and linear.

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    maternity hospital I sections

    p o r t f o l i o

    Section B-B

    Basement Floor

    Section A-A

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    maternity hospital I plans

    p o r t f o l i o

    Ground Floor

    First FloorN

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    maternity hospital I plans

    p o r t f o l i o

    Ground Floor

    First FloorN

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    maternity hospital I perspective

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I concept

    p o r t f o l i o

    showing the continuity of process (the flow of money) by constructing a continuous element that flows through the whole project, connecting and defining every part of it.

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I concept

    p o r t f o l i o

    showing the continuity of process (the flow of money) by constructing a continuous element that flows through the whole project, connecting and defining every part of it.

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I plans

    p o r t f o l i o

    Ground Floor

    First Floor

    B

    B

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I plans

    p o r t f o l i o

    Second Floor

    Third Floor

    B

    B

    B

    B

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I plans

    p o r t f o l i o

    Second Floor

    Third Floor

    B

    B

    B

    B

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I sections

    p o r t f o l i o

    Section A-A

    Section B-B

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I perspective

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I perspective

    p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    bank-headquarters I perspective

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I concept

    p o r t f o l i o

    a sport is about two teams aiming one goal, since sports hall needs only artificial light and/or indirect light, the design took this orienta-tion which perpendicular to the north. overcoming this challenge the structure of the building was separated in the middle and shifted to emphasize it, the southern part was raised higher than the northern avoiding direct sun rays. this shifting in the structure created two entrances to serve the function. the structure was covered by light material called ETFE foil panels, this material was chosen because its is durable, self clean and it is easily maintained.

    Section A-A

    Site Plan

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I concept

    p o r t f o l i o

    a sport is about two teams aiming one goal, since sports hall needs only artificial light and/or indirect light, the design took this orienta-tion which perpendicular to the north. overcoming this challenge the structure of the building was separated in the middle and shifted to emphasize it, the southern part was raised higher than the northern avoiding direct sun rays. this shifting in the structure created two entrances to serve the function. the structure was covered by light material called ETFE foil panels, this material was chosen because its is durable, self clean and it is easily maintained.

    Section A-A

    Site Plan

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I plans

    p o r t f o l i o

    First Floor

    Ground Floor

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I perspective

    p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I perspective

    p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y

    sport hall I perspective

    p o r t f o l i o

  • s a m e e r i s h t a y p o r t f o l i o

    Figure 3

    Figure 1 Figure 2

    Figure 4

    Physical Concept:1.Girded plan:1)Safer 2)Easier addressing 3)Time saving 4)Zones will be easy to approach 2.Services zones were divided into five main zones. Each is locate in the center of a residential zone making it approachable for everyone. 3.Commercial zones (high, medium and low density) are mainly grouped around the main spine profiling the identity of the city. Residential zones, on the other hand, are pushed away from the commercial zones with the use of the urban parks and green areas. 4.Green areas are added to service zones .5.Hotels are located in the beginning of the city since they are basically for tourists. see figure (1,2).Rotation of the spine:Site orientation to those passing beside from/to the airport.Decrease the speed on the high way making passengers enjoy our site.Create visual connection between the upper and lower (boulevard) level of the bridge. see figure (3).Transformation of spine into the bridge:1.Emphasize on the importance of the train track which is intended to be reconstructed. 2.Decrease noise and pollution through the site.see figure (4).

    urban planing I concept

    Graduation Project Third Year OthersForth Year

    c o n c e p t o f a x i s

    l i f t i n g u p t h e a x i s t o f o r m a b r i d g e

    m o r e i n t e r a c t i o n o n t h e g r o u n d

    c o n n e c t i n g t h e p l a c e s b yu s i n g t h e h i j a z t r a i n

    s e r v i c e z o n e s

    s e c o n d a r y s t r e e t s

    s e c o n d a r y s t r e e t s

    l o c a l s t r e e t s

    s e r v e 4 f u n c t i o n s :h o t e l s / r e s i d e n t i a l /c o m m e r c i a l / s e r v i c e s

    m a i n s p i n e a r o u n d w h i c h e v e r y t h i n g o c c u r s

    f r o m p u b l i c t o p r i v a t e

    s p i n e

    s e m i p u b l i c

    p u b l i c

    s e m i p u b l i cp r i v a t e

    p r i v a t e

    c o m m e r c i a l z o n e v i e w o n t h e h i g h a c t i v i t y b r i d g e

    w i n d

    r e s i d e n t i a l

    r e s i d e n t i a l v i e w s f r o m t h e s i t e t o s u r r o u n d i n g

    b u f f e r z o n e s

    v i e w s f r o m t h e b r i d g e t o t h e w h o l e c i t y

    v i e w s t o g r e e n v e g e t a t i o n i n t h i s z o n e

  • s a m e e r i s h t a y p o r t f o l i o

    Figure 3

    Figure 1 Figure 2

    Figure 4

    Physical Concept:1.Girded plan:1)Safer 2)Easier addressing 3)Time saving 4)Zones will be easy to approach 2.Services zones were divided into five main zones. Each is locate in the center of a residential zone making it approachable for everyone. 3.Commercial zones (high, medium and low density) are mainly grouped around the main spine profiling the identity of the city. Residential zones, on the other hand, are pushed away from the commercial zones with the use of the urban parks and green areas. 4.Green areas are added to service zones .5.Hotels are located in the beginning of the city since they are basically for tourists. see figure (1,2).Rotation of the spine:Site orientation to those passing beside from/to the airport.Decrease the speed on the high way making passengers enjoy our site.Create visual connection between the upper and lower (boulevard) level of the bridge. see figure (3).Transformation of spine into the bridge:1.Emphasize on the importance of the train track which is intended to be reconstructed. 2.Decrease noise and pollution through the site.see figure (4).

    urban planing I concept

    Graduation Project Third Year OthersForth Year

    c o n c e p t o f a x i s

    l i f t i n g u p t h e a x i s t o f o r m a b r i d g e

    m o r e i n t e r a c t i o n o n t h e g r o u n d

    c o n n e c t i n g t h e p l a c e s b yu s i n g t h e h i j a z t r a i n

    s e r v i c e z o n e s

    s e c o n d a r y s t r e e t s

    s e c o n d a r y s t r e e t s

    l o c a l s t r e e t s

    s e r v e 4 f u n c t i o n s :h o t e l s / r e s i d e n t i a l /c o m m e r c i a l / s e r v i c e s

    m a i n s p i n e a r o u n d w h i c h e v e r y t h i n g o c c u r s

    f r o m p u b l i c t o p r i v a t e

    s p i n e

    s e m i p u b l i c

    p u b l i c

    s e m i p u b l i cp r i v a t e

    p r i v a t e

    c o m m e r c i a l z o n e v i e w o n t h e h i g h a c t i v i t y b r i d g e

    w i n d

    r e s i d e n t i a l

    r e s i d e n t i a l v i e w s f r o m t h e s i t e t o s u r r o u n d i n g

    b u f f e r z o n e s

    v i e w s f r o m t h e b r i d g e t o t h e w h o l e c i t y

    v i e w s t o g r e e n v e g e t a t i o n i n t h i s z o n e

    Figure6

    Figure 5

    Environmental Concept:1.Solar plates are placed in the site to provide all the electrical needs of the city. 2.Recycle zone reprocesses water to be exploited in green lands. 3.Wind turbines are placed on the highest level of the site for energy production 4.Main tank to harvest rainwater and serve the city. see figure (5).Environmental strategies: Bearing in mind that this is a metropolitan city green roofs, white buildings, and widely distributed green areas were integrated within city strategies to reduce amount of heat stored. Infra-structure layout was taken in consideration and given priority in location. Districts that supply the site (solar plates, water tanks, and wind-mills) was located at the highest point of the site. Recycling and waste areas where located on the lower point; where sewage is recycled and reused for green houses that surrounds that separates waste area from residential area. seef igure (6).

    s a m e e r i s h t a y p o r t f o l i o

    urban planing I section

    Graduation Project Third Year OthersForth Year

    c o m m e r c i a l a r e a n e a rt h e m a i n a x i s ( b r i d g e )

    i t p r e s e n t s t h e b r i d go f t h e c i t y e n c o u r a g e t o u r i e s t s o f i n - o u t u s e

    w o r k /o f f i c e s

    b r i d g e a n d c o m m e r c i a l l a n e

    r e s i d e n t i a l

    r e s i d e n t i a lr e s i d e n t i a l s e r v i c e s

    o p e n s p a c e s /g r e e n a r e a

    o p e n s p a c e sp u b l i c b u i l d i n g s

    p u b l i c a r e a s /c o m m e r c i a l

    w o r k p l a c e s /o f f i c e sp u s h e d i n t o t h e c o r n e r s : l e s s a t r a c t i o n t o c e n t e r l e s s t r a f f i c l e s p o l u t i o n l e s s t r a n s p o r t a t i o n t i m e

    e a s y p e d e s t r i a n a c c e s s i b i l i t y t o o p e n s p a c e s a n d m i n i m u m i n t e r f a c e w i t h r o a d s .

    r o a d s i d e p a l n t i n g , t o i m p r o v e t h e q u a l i t y o f t h e s t r e e t e n v i r o m e n t .

    m a x i m a i s a t i o n o f l a n d s c a p e d o p e n s p a c e s t o s e r v e t h e s p a c e u s e r s a s w e l l a s t h e v i e w e r s o f t h e g r e e n e n v i r o m e n t

    c r e a t i n g l a n d m a r k s a t t h e c i v i c /c o m m e r c i a l c e n t r e s .

  • The Sitethe site is located 4 kms away from Queen Alia Airport. Within few years laters it will become a transite station which would give the surrounding a strong privilege to make a city in airports' context, that gives tourists new experience and future amman vision in ich would give the surrounding a strong privilege to make a city in airports' context, that gives tourists new experience and future amman vision.

    s a m e e r i s h t a y p o r t f o l i o

    urban planing I master plan

    Graduation Project Third Year OthersForth Year

  • The Sitethe site is located 4 kms away from Queen Alia Airport. Within few years laters it will become a transite station which would give the surrounding a strong privilege to make a city in airports' context, that gives tourists new experience and future amman vision in ich would give the surrounding a strong privilege to make a city in airports' context, that gives tourists new experience and future amman vision.

    s a m e e r i s h t a y p o r t f o l i o

    urban planing I master plan

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    urban planing I plans

    Graduation Project Third Year OthersForth Year

    t y p e B b u i l d i n g

    t y p e A b u i l d i n g

    s o l i d

    v o i d

    v e r y h i g h d e n s i t y

    h i g h d e n s i t ym e d i u m d e n s i t yl o w d e n s i t y

  • s a m e e r i s h t a y p o r t f o l i o

    Section A-A

    Site Plan

    Section B-B

    the form was generated from sites triangular shape, which was divided it into three main zones; library, lobby, and cafe. variety of levels was applied to emphasize the fragmentation. the lobby is the lowest zone in which one feels closest to nature creating an inside out experience, however, the library and the cafe, which are the main functions of the project, are on higher levels to give them more impor-tance.

    book cafe I concept+sections

    N

    Graduation Project Third Year OthersForth Year

  • s a m e e r i s h t a y p o r t f o l i o

    Section A-A

    Site Plan

    Section B-B

    the form was generated from sites triangular shape, which was divided it into three main zones; library, lobby, and cafe. variety of levels was applied to emphasize the fragmentation. the lobby is the lowest zone in which one feels closest to nature creating an inside out experience, however, the library and the cafe, which are the main functions of the project, are on higher levels to give them more impor-tance.

    book cafe I concept+sections

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    Basement Floor

    Ground Floor

    book cafe I plans

    N

    Graduation Project Third Year OthersForth Year

  • s a m e e r i s h t a y p o r t f o l i o

    book cafe I perspective

    Graduation Project Third Year OthersForth Year

  • s a m e e r i s h t a y p o r t f o l i o

    book cafe I perspective

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    book cafe I perspective

    Graduation Project Third Year OthersForth Year

  • Graduation Project Third Year OthersForth Year

    Site Plan

    s a m e e r i s h t a y

    mixed-use I concept

    p o r t f o l i o

    through site analysis one of the main pedestrian circulation in the context was taken into consideration in high level, since it is adjacent to the site. other circulation axes found next to the context, which it is reflected by a crack that penetrates and intersects creating the threshold of the building. in order to break the rigidity of this crack, the elevation adapted lighter material that interacts with this crack which formed harmony between solid and void.

    N

  • Graduation Project Third Year OthersForth Year

    Site Plan

    s a m e e r i s h t a y

    mixed-use I concept

    p o r t f o l i o

    through site analysis one of the main pedestrian circulation in the context was taken into consideration in high level, since it is adjacent to the site. other circulation axes found next to the context, which it is reflected by a crack that penetrates and intersects creating the threshold of the building. in order to break the rigidity of this crack, the elevation adapted lighter material that interacts with this crack which formed harmony between solid and void.

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    Basement Floor

    Ground Floor

    mixed-use I plans

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    Typical Floor

    Penthouse

    mixed-use I plans

    N

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    Typical Floor

    Penthouse

    mixed-use I plans

    N

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    Section B-B

    Section A-A

    mixed-use I sections

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    mixed-use I perspective

  • Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    mixed-use I perspective

    Graduation Project Third Year OthersForth Year

    s a m e e r i s h t a y p o r t f o l i o

    mixed-use I perspective

  • Graduation Project Third Year OthersForth Year

    Site Plan

    Ground Floor

    s a m e e r i s h t a y

    cons. drawings I plan

    p o r t f o l i o

    N

  • Graduation Project Third Year OthersForth Year

    Site Plan

    Ground Floor

    s a m e e r i s h t a y

    cons. drawings I plan

    p o r t f o l i o

    N

    s a m e e r i s h t a y p o r t f o l i o

    First Floor

    Graduation Project Third Year OthersForth Year

    cons. drawings I plan

    N

  • s a m e e r i s h t a y p o r t f o l i o

    Section B-B

    Section A-A

    Graduation Project Third Year OthersForth Year

    cons. drawings I sections

  • s a m e e r i s h t a y p o r t f o l i o

    Section B-B

    Section A-A

    Graduation Project Third Year OthersForth Year

    cons. drawings I sections

    Graduation Project Third Year OthersForth Year

    cons. drawings I elevations

    s a m e e r i s h t a y p o r t f o l i o

    Left Elevation

    Back Elevation

  • Graduation Project Third Year OthersForth Year

    cons. drawings I details

    Returning Wall Elevator Detail

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    cons. drawings I details

    Returning Wall Elevator Detail

    s a m e e r i s h t a y p o r t f o l i o

    Graduation Project Third Year OthersForth Year

    cons. drawings I details

    s a m e e r i s h t a y p o r t f o l i o

  • Graduation Project Third Year OthersForth Year

    Basement Floor

    s a m e e r i s h t a y

    internship I plan

    p o r t f o l i o

    N

    B

    B

    working within a group to design the house for hisham al najjar. In the intership I worked on the house. My resposiblities were the interior and developing 3D and designing for the living and the dinning room (I worked on two phases the conceptual and the construc-tion drawings). Furthermore, I worked on several projects some required working on construction drawings and I had a small experi-ence working on AQS and site supervisions

  • Graduation Project Third Year OthersForth Year

    Basement Floor

    s a m e e r i s h t a y

    internship I plan

    p o r t f o l i o

    N

    B

    B

    working within a group to design the house for hisham al najjar. In the intership I worked on the house. My resposiblities were the interior and developing 3D and designing for the living and the dinning room (I worked on two phases the conceptual and the construc-tion drawings). Furthermore, I worked on several projects some required working on construction drawings and I had a small experi-ence working on AQS and site supervisions

    s a m e e r i s h t a y p o r t f o l i o

    Ground Floor

    Graduation Project Third Year OthersForth Year

    internship I plan

    NB

    B

  • s a m e e r i s h t a y p o r t f o l i o

    Section B-B

    Right Elevation

    Graduation Project Third Year OthersForth Year

    internship I elevation & section

  • s a m e e r i s h t a y p o r t f o l i o

    Section B-B

    Right Elevation

    Graduation Project Third Year OthersForth Year

    internship I elevation & section

    Graduation Project Third Year OthersForth Year

    internship I perspective

    s a m e e r i s h t a y p o r t f o l i o

    Left Elevation

    Back Elevation