MAGDA FELOARCHITECT

PORTFOLIO FROM 2003 TO 2015

PORTFOLIO 2015

Page 2: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_ 3 YEARS_ www.dyldam.com.au BUILDER AUSTRALIAN COMPANY WITH A DESIGN DEPARTMENT AND ARCHITECTS IN-HOUSE

FUL TIME SENIOR ARCHITECT

● SKETCHES AND FIRST IDEAS DRAWINGS PRODUCTION, DA AND S96 DOCUMENTATION ACCORDING TO COUNCIL'S REQUIREMENTS (LEP & DCP, SEPP65 & A.S.).

● CC & TENDER DOCUMENTATION ACCORDING TO BCA.● COORDINATION WITH CONSULTANTS.● PERSON OF REFERENCE FOR REVIT AUTODESK ASSISTANCE DURING INITIAL SETTING UP OF THE TOOL AS THE

COMPANY'S PREFERRED.● ORGANIZATION REVIT FILES (BIM).● PHOTOMONTAGES (REVIT/PHOTOSHOP/GIMP/SKETCHUP).

FUL TIME SENIOR ARCHITECT

● SKETCHES AND FIRST IDEAS DRAWINGS PRODUCTION, DA AND S96 DOCUMENTATION ACCORDING TO COUNCIL'S REQUIREMENTS (LEP & DCP, SEPP65 & A.S.).

● CC & TENDER DOCUMENTATION ACCORDING TO BCA.● COORDINATION WITH CONSULTANTS.● PERSON OF REFERENCE FOR REVIT AUTODESK ASSISTANCE DURING INITIAL SETTING UP OF THE TOOL AS THE

COMPANY'S PREFERRED.● ORGANIZATION REVIT FILES (BIM).● PHOTOMONTAGES (REVIT/PHOTOSHOP/GIMP/SKETCHUP).

RAILWAY TERRACE97 APARTMENTCHILDCARE (40)165 CARSPACES IN ONE BASEMENT

● SKETCHES AND FIRST IDEAS UNDER THE ARCHITECT CHIEF OF THE DEPARTMENT SUPERVISION

● Documentation for Approval PRODUCTION ● Construction Certificate ASSISTANCE

Page 3: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACE97 APARTMENTCHILDCARE (40)165 CARSPACES IN ONE BASEMENT

VIEW FROM RAILWAY TCE. VIEW FROM MOMBRI ST.

Page 4: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACE97 APARTMENTCHILDCARE (40)165 CARSPACES IN ONE BASEMENT

Page 5: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACE CROSS SECTION

Page 6: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACEBASEMENT FLOOR PLAN

Page 7: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACEGENERAL GROUND FLOOR PLAN

Page 8: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACETYPICAL FLOOR PLAN

Page 9: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACEAPARTMENT LAYOUT

Page 10: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACEFACADES

Page 11: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

RAILWAY TERRACEFACADE STUDY_MATERIALS_

Page 12: Portfolio

MERRYLANDS119 APARTMENTCOMMERCIAL AREA IN GROUND FLOOR140 CARSPACES IN TWO BASEMENT

● SKETCHES AND FIRST IDEAS UNDER THE ARCHITECT CHIEF OF THE DEPARTMENT SUPERVISION

● Documentation for Approval PRODUCTION

● CHANGES: S96 COUNCIL DISCUSSION

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

Page 13: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

MERRYLANDFACADES

Page 14: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

KOY/GEORGE ST.TWO TOWERS APARTMENTS

● (240 APARTMENT)COMMERCIAL AREA IN GROUND FLOOR290 CARSPACES IN 3 BASEMENT

● EXISTING PROJECT (AT A DA STAGE): BUILDING THE REVIT FILE TO SHARE IN A TEAM OF 3 PERSONS

● PARTICIPATION IN THE CONSTRUCTION DOCUMENTATION

● MEZZANINE CONSTRUCTION DETAIL DOCUMENTATION ELABORATION

CONSTRUCTION DOCUMENTATION

Page 15: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

KOY GEORGE ST.ENTRY CANOPY STUDY

Page 16: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

KOY GEORGE ST.ENTRY CANOPY STUDY

Page 17: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

NORTHGATE● 3 BLOCK APARTMENT

(312 APARTMENT)EXTERIOR GREEN AREA360 CARSPACES IN 3 BASEMENT

● EXISTING PROJECT (AT A DA STAGE): BUILDING THE REVIT FILE TO SHARE IN A TEAM OF 4 PERSONS

● REORGANISATION OF THE LAYOUT-THE WHOLE BASEMENT MAJOR CHANGES FOR A S96 TO SUBMIT IN THE COUNCIL

● CONSTRUCTION CERTIFICATE● CONSTRUCTION DOCUMENTATION FOR TENDERS● COORDINATION WITH CONSULTANTS

SITE PLAN

Page 18: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

NORTHGATEGENERAL VIEW

Page 19: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

PARTICIPATION IN MANY PROJECTS● PLAN DRAWING● PHOTOMONTAGES● ELABORATION OF PROJECT PROPOSALS FOR THE COUNCIL

HERBERT STR. PHOTOMONTAGES

FACADE VARIATION STUDY

Page 20: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

SHOWROOM CAR PROPOSED STUDY

PHOTOMONTAGE PROJECT: TASMAN PARADE VIEW/RENDER PROJECT: TASMAN PARADE

Page 21: Portfolio

DYLDAM DEVELOPMENT _PARRAMATTA, SYDNEY, AUSTRALIA_

320CHURCH STREET PARRAMATTAPRELIMINARY STUDY PROPOSAL TO COUNCIL

Page 22: Portfolio

DMJ DESIGN STUDIO_SYDNEY_ WORKING PART-TIME AS A FREE-LANCE FOR 6 MONTH_SMALL ARCHITECTURALL FIRM. LUXURY SINGLE HOSES DESIGN IN SYDNEY'S METROPOLITAN AREA

PART TIME ARCHITECTMAIN TASKS:

● PRODUCING DA DOCUMENTATION● BASIX (AUSTRALIAN ENERGIE CERTIFICATE)● CONSTRUCTION CERTIFICATE AND TENDER DOCUMENTATION● SITE VISIT WITH THE ARCHITECT

PART TIME ARCHITECTMAIN TASKS:

● PRODUCING DA DOCUMENTATION● BASIX (AUSTRALIAN ENERGIE CERTIFICATE)● CONSTRUCTION CERTIFICATE AND TENDER DOCUMENTATION● SITE VISIT WITH THE ARCHITECT

KANGAROO POINT HOUSE (250 m2-1.3$AU)

TWIN CREEKS HOUSE(440 m2)

Page 23: Portfolio

PSTE. COLOM – PROJECT MANAGEMENT56 APARTMENT (public housing for young people with low income) - 3.500m2CHILDCARE IN Ground Floor – 800m2214 PUBLIC PARKING (3 Level basement) – 6.300m2EXTERIOR PUBLIC SPACE – 800 m2Expected Cost: 10 MEuros

L'H2010_L'HOSPITALET DE LLOBR. Barcelona's Metropolitan Area – 2 YEARSDESIGN AND DEVELOPMENT COUNCIL DEPARTMENT:PUBLIC HOUSING, PUBLIC SCHOOLS & CHILDCARE, SOCIAL CENTERS, PUBLIC SPACES AND HERITAGE

FUL TIME SENIOR ARCHITECT & PROJECT MANAGERMAIN TASKS:

● VIABILITY STUDIES AND FIRST SKETCHES – PROJECT DEVELOPMENT● BRIEF AND PROGRAM DEVELOPMENT● SITE VISIT MANAGEMENT● COSTS, TIMING & PLANNING MONITORING

FUL TIME SENIOR ARCHITECT & PROJECT MANAGERMAIN TASKS:

● VIABILITY STUDIES AND FIRST SKETCHES – PROJECT DEVELOPMENT● BRIEF AND PROGRAM DEVELOPMENT● SITE VISIT MANAGEMENT● COSTS, TIMING & PLANNING MONITORING

Page 24: Portfolio

L'H2010_L'HOSPITALET DE LLOBREGAT COUNCIL_ Barcelona's Metropolitan Area _

PSTE. COLOM – PROJECT MANAGEMENT

Page 25: Portfolio

PROPOSAL

L'H2010_L'HOSPITALET DE LLOBREGAT COUNCIL_ Barcelona's Metropolitan Area _

MANAGEMENT JOBS: ● MIXED USE DEVELOPMENT: AS-BUILT PLAN – DOC. TENDERS/COMPETITION/CONTRACT CONSTRUCTION

47 APARTMENT (public housing for people with low income) - 3.196m2SOCIAL EQUIPMENT Ground Floor – 447m2260 PUBLIC PARKING (3 Level basement) – 7.540m2EXTERIOR PUBLIC PARK WITH CHILDREN PLAYGROUND

● REHABILITATION HERITAGE: Final construction – delivery processCommunity center for Children with social problem.Old house refurbished, addition of two levels and conversion into a childcare center (400m2 + 300m2 exterior) Final cost: 2 Meuros.

● MARKET: PROVISIONAL MARKET – Construction Process (visit site monitoring – cost – planning)

DESIGN JOBS: ● TORRE BARINA REHABILITATION HERITAGE: Conversion of an old mansion into a community center with classrooms for

adult courses. Facade design and material research

● TRIANGLE 2 FOUR STOREYS BLOCK: 14 apartment for people with social risk exclusion. 1365M2 – Expected Cost: 1.6 Meuro.Viability study (cost-planning...) + design from Sketch – Layout.

MANAGEMENT JOBS: ● MIXED USE DEVELOPMENT: AS-BUILT PLAN – DOC. TENDERS/COMPETITION/CONTRACT CONSTRUCTION

47 APARTMENT (public housing for people with low income) - 3.196m2SOCIAL EQUIPMENT Ground Floor – 447m2260 PUBLIC PARKING (3 Level basement) – 7.540m2EXTERIOR PUBLIC PARK WITH CHILDREN PLAYGROUND

● REHABILITATION HERITAGE: Final construction – delivery processCommunity center for Children with social problem.Old house refurbished, addition of two levels and conversion into a childcare center (400m2 + 300m2 exterior) Final cost: 2 Meuros.

● MARKET: PROVISIONAL MARKET – Construction Process (visit site monitoring – cost – planning)

DESIGN JOBS: ● TORRE BARINA REHABILITATION HERITAGE: Conversion of an old mansion into a community center with classrooms for

adult courses. Facade design and material research

● TRIANGLE 2 FOUR STOREYS BLOCK: 14 apartment for people with social risk exclusion. 1365M2 – Expected Cost: 1.6 Meuro.Viability study (cost-planning...) + design from Sketch – Layout.

SITE PLAN

LEVELS 1 TO 4 LAYOUTTRIANGLE 2 FIRST SKETCHES LAYOUT

Page 26: Portfolio

L'H2010_L'HOSPITALET DE LLOBREGAT COUNCIL_ Barcelona's Metropolitan Area _

TRIANGLE 2 FEASABILITY STUDIES

Page 27: Portfolio

L'H2010_L'HOSPITALET DE LLOBREGAT COUNCIL_ Barcelona's Metropolitan Area _

FACADE 2 ADDED CORE (LIFT-STAIRS-TOILET)

FACADE 1

OLD FACADEPROPOSAL

TORRE BARINA REHABILITATION HERITAGE

OLD FACADEPROPOSAL

Page 28: Portfolio

MACE GROUP_PROJECT MANAGEMENT SERVICES_UK_SPANISH BRANCH – 2 YEARS

● WORK AS AN ASSISTANT PROJECT & CONSTRUCTION MANAGER● SITE WORK DRAWINGS ELABORATION + MONITORING DOCUMENTATION● LOCATION: IN THE SITE (Sabadell/Barcelona-Spain)● BUILDING'S DESCRIPTION:

62 APARTMENTSCOMMERCIAL IN THE GROUND FLOORONE LEVEL BASEMENT WITH 70 CARSPACES AND STORAGE ROOMS

● WORK AS AN ASSISTANT PROJECT & CONSTRUCTION MANAGER● SITE WORK DRAWINGS ELABORATION + MONITORING DOCUMENTATION● LOCATION: IN THE SITE (Sabadell/Barcelona-Spain)● BUILDING'S DESCRIPTION:

62 APARTMENTSCOMMERCIAL IN THE GROUND FLOORONE LEVEL BASEMENT WITH 70 CARSPACES AND STORAGE ROOMS

Page 29: Portfolio

BETLAND CONSTRUCCION_DEVELOPMENT & BUILDER COMPANY – 3 YEARS

● 2 YEARS AS AN ASSISTANT CONSTRUCTION MANAGER● SITE DRAWINGS DEVELOPMENT + MONITORING DOCUMENTATION (IN THE SITE: Cerdagne- France)● 1 YEAR IN THE DEVELOPMENT DEPARTMENT: MONITORING THE EXISTING WORKS AND PRODUCING

ARCHITECTURAL PLANS ON NEW AND EXISTING PROJECTS.● MAIN SITE DESCRIPTION: BOURG MADAME

42 ATTACHED HOUSES6 BLOCK APARTMENT (TOTAL 36 APARTMENTS)URBANIZATION-GREEN AREAS

● 2 YEARS AS AN ASSISTANT CONSTRUCTION MANAGER● SITE DRAWINGS DEVELOPMENT + MONITORING DOCUMENTATION (IN THE SITE: Cerdagne- France)● 1 YEAR IN THE DEVELOPMENT DEPARTMENT: MONITORING THE EXISTING WORKS AND PRODUCING

ARCHITECTURAL PLANS ON NEW AND EXISTING PROJECTS.● MAIN SITE DESCRIPTION: BOURG MADAME

42 ATTACHED HOUSES6 BLOCK APARTMENT (TOTAL 36 APARTMENTS)URBANIZATION-GREEN AREAS

BOURG-MADAME SITE

ESTAVAR SITE