Top Banner
ARCADIS “Sustainable Water Structures” ARCADIS Netherlands Jos van Kerckhoven Msc Head, Hydraulic Engineering Department John Staphorsius Senior Project Leader, Hydraulic Engineering Department April 20, 2012 Linked-In
13
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Portfolio

ARCADIS“Sustainable Water Structures”

ARCADIS NetherlandsJos van Kerckhoven MscHead, Hydraulic Engineering Department John StaphorsiusSenior Project Leader, Hydraulic Engineering Department

April 20, 2012 Linked-In

Page 2: Portfolio

ARCADIS Netherlands BV

Hoofddorp

Amersfoort

Hoorn

Hoofddorp

Rotterdam

Apeldoorn

Den Bosch

Red bullets on map are offices of the department Hydraulic Engineering

Goes

Assen

Arnhem

Maastricht

ARCADISNetherlands

Water Transport

Environment

Buildings

Page 3: Portfolio

Strength in hydraulic engineering

• Flood control• Dike reinforcement• Storm Surge Barriers• Navigation locks and weirs

• Rivers and inland waterways• Harbours and transport• Coast• Offshore

River management• Integrated water resources management• Decision making • Hydrologic, hydraulic and morphologic modeling

• Drinking water process & planning• Waste water process & planning

Page 4: Portfolio

ECT Terminal phase 2(Port of Rotterdam / Hutchison Wampoa) ImagineA new container terminal for Euromax Terminal due to increase of container volume.

The resultMore capacity for ECT containergiant by building aultramodern terminal

ARCADISMasterplanning, design and supervision.

Page 5: Portfolio

Architecture

ImagineLandmarks,structures that fits in the landscape

ARCADISOwn architects and landscape designers

Page 6: Portfolio

Dike improvementsImagineAll mayor dike improvements are prepared by ARACDIS

Assessment of primary flood defences in the Netherlands3500 km.

Some project examples are:Enkhuizen-Hoorn (20 km)Hondsbosche en Pettermerzee wering (6 km)Amerongen-Schoonhoven(50 km)Schoonhoven-Lekkerkerk (10 km)

The resultDesignContract managementSupervision

Page 7: Portfolio

Maeslant storm surge barrier (Rotterdam, The Netherlands)ImagineFinancial control of the maintenance of this barrier.

The resultWe do the control of the financial contracts on behalf of the Dutch Department of Public Works.

ARCADISFinancial control.

Page 8: Portfolio

Flood Control(New Orleans, USA)ImagineProgram ManagementDesignContract managementTechnical advise

More than 100 employees

Ongoing

Page 9: Portfolio

Reduce cost of maintenance or Architectural design

Hartel Canal storm surge barrier1997

Page 10: Portfolio

State of the art

Respect toenviroment and ecology

Sealevel rise taken into account

Easter Scheldt storm surge barrier 1986

Page 11: Portfolio

Reliability is a key issue;

• Use proven concepts• Operating mechanism above water• Fail save design• Simple movement (horizontal or vertical only)• Easy accessible for maintenance• Operations is vital

How to keep a structure reliable

• Maintenance driven design• Risk based management• Learning and cooperating with other

sufficient budget

Reliability

Page 12: Portfolio
Page 13: Portfolio

Imagine the result

For more information pleasecontact:

[email protected]+31 627062455

[email protected]

+31 627060850