Jan 21, 2015
resumeASSOCIATE Terra Design Group 2009-PresentCoordinate master plans with research, graphic production, and writingDesign interpretive signage and layoutCreate and update construction details and plans in AutoCAD Lead marketing outreach and submit statements of qualifications Support bidding process, addenda, and submittal review
RESIDENTIAL STUDIO INTERN MESA Design Group 2008Rendered site plan for studio award submission Drafted AutoCAD files for design development, construction details, and planting plansCreated Stability Restoration Initiative for vacant lots of Habitat for Humanity with intern team
NATIONAL WILDLIFE REFUGE SYSTEM INTERN The Wilderness Society 2007Formulated initial policy for The Wilderness Society to help NWRS with climate changeResearched background information on House/Senate bill concerning Alaskan wildernessLed subcommittee conference calls and worked on congressional award ceremony
PARK DEVELOPMENT INTERN City of Round Rock, Texas 2006Developed and illustrated Baylor Park Memorial site plan for city’s historical committeeCreated AutoCAD files for parks and created cost estimates and materials lists
TEXAS A&M UNIVERSITY, COLLEGE STATION, TXBachelor of Landscape Architecture Graduation: May 2009 Minor in Spanish GPR: 3.96 COMPLETED ALL LARE SECTIONS ON FIRST ATTEMPT. Landscape architect licensure anticipated next month. LEED AP BD+C, 2008
Nature in Play: Measuring the Relationship of Nature and Unstructured Play through Case StudiesLambert Academic Publishing, 2010.
Semester Study Abroad in Bonn, Germany through Texas A&M Faculty-Led Program 2008-09 Undergraduate Research Scholars Program: Connection to Nature through Play in Germany Russian Mission Trip with Children’s Hope Chest 2006 Hosted weeklong summer camp at orphanage in Ivanovo, Russia with mission team
Work
Education
Certification
Publications
International Experience
Public Service + Pro Bono Projects, American InHouse Design Awards, 2009 BC Workshop Stability Restoration Initiative, MESA Intern Team.Thomas S. Gathright Academic Excellence Award from Association of Former Students 2008Southerland Aggie Leader Scholarship 2008Dean’s List 2008-09Robert F. & Florence H. White Endowed Scholarship in Landscape Architecture 2008Antonio F. Sarabando Jr. “Spirit of Place Award” Department Scholarship 2007
AutoCAD 2008, PhotoShop CS3, InDesign CS3, Illustrator CS3, SketchUP, QuarkXPress 8, Microsoft Word, Excel, PowerPoint
SELECTED Honors AND
AWARDS
Skills
PROJECT LIST
LISA HORNE, LEED AP BD+C
1440 WEST BITTERS RD APT. 1722
SAN ANTONIO, TEXAS 78248
MOBILE 979.575.2464
Wyndham North River Hotel San Antonio, Texas (IP)Elmendorf Lake Conceptual Plan San Antonio, TexasBulldog Championship Park Socorro, TexasHeath Public Library Interpretive Signage Boerne, TexasLeon Creek Trail Central Segment San Antonio, TexasBoerne Trails and River Road Park Boerne, TexasMcAllen Main Library McAllen, TexasSchreiner University Master Plan Kerrville, TexasLumberton Community Park Lumberton, TexasFischer Park Master Plan New Braunfels, Texas
UTPA Trail Master Plan Edinburg, TexasMaster Plan and Zoning Ordinance Balcones Heights, TexasHausman Road Drainage Improvements San Antonio, TexasOlympia Park Improvements San Antonio, TexasDistrict 2 Park Improvements San Antonio, TexasDel Rio Streetscape Del Rio, TexasWestover Lot 6 San Antonio, TexasWarm Springs Rehabilitation Hospital San Antonio, TexasDistrict 2 Park Improvements San Antonio, TexasFree Speech Plaza Kerrville, Texas
Year: 2011 Client: Schreiner UniversitySite: 170 acres of private universityProject: To master plan outdoor space, establish a vision, and provide a charrette.
MASTER PLANSCHREINER UNIVERSITY
Role on Project: 30%
Co-author of master plan, client contact
one stakeholder requested that the designers
and the master plan reflects a comprehensive and long term approach.
“make no little plans”
Year: 2009 (master plan); design is ongoingClient : City of New BraunfelsSite: 58 acres of agricultural landProject: To master plan land as a park and provide community involvementRole: Production of graphics and master plan document layout (final product of 216 pages)
Sketch from project manager
Final master plan
Role on Project: 30%
Graphics and master plan production
MASTER PLANFISCHER PARK
Role on Project: 30%
Graphics and master plan production
MASTER PLANFISCHER PARK
Year: 2010 (master plan)Client: City of LumbertonSite: 89 acres of managed pine forestProject: To master plan park for local fair and recreational use and provide community
Site location Site analysis
Site inventory Festival at current siteRole on Project: 60%
Co-author of master plan, project coordinator
MASTER PLANLUMBERTON COMMUNITY PARK
Year: 2011 Client: City of McAllenProject: To create ten interpretive signs along Dewey Decimal Trail of the system
GRAPHICS DEWEY DECIMAL TRAIL SIGNAGE
Role on Project: 100% Research, design, production
Year: 2009-10 Client: City of BoerneProject: To create sixteen interpretive signs as well as wayfinding signage along 2.5 miles of trail
“The signage ... is seen as a way to engage pedestrians in
the city’s history.”
- San Antonio Express News
Role on Project: 100%
Research, design, production
GRAPHICSBOERNE TRAIL SIGNS
Year: 2010 Client: City of SocorroProject: To create five interpretive signs throughout Bulldog Championship Park
GRAPHICS BULLDOG CHAMPIONSHIP PARK SIGNAGE
Role on Project: 100% Research, design, production
Year: 2011 Client: City of SocorroProject: To create five interpretive signs throughout Bulldog Championship Park
GRAPHICS BULLDOG CHAMPIONSHIP PARK SIGNAGE
Role on Project: 100% Research, design, production
Year: 2011 Client: City of BoerneProject: To create nine interpretive signs on the watershed and sustainable practices as well as three panels with local history and wayfinding
GRAPHICS heath patrick library watershed interpretation
Role on Project: 100% Coordination, design, production
Year: 2011 Client: CP&Y Engineers (prime consultant) to Bexar CountyProject: To provide natural planting plan and innovative tree preservation with the new city tree ordinance
Client communication and production
TECHNICAL HAUSMAN ROAD DRAINAGE IMPROVEMENTS
Role on Project: 70%
Year: 2011 Client: CP&Y Engineers (prime consultant) to Bexar CountyProject: To provide natural planting plan and innovative tree preservation with the new city tree ordinance
Year: 2011Client: City of San AntonioProject: To create 5.5 miles of trail along dry creek
Signage and construction document production with team
TECHNICAL LEON CREEK GREENWAY
Role on Project: 20%
TECHNICAL SKILLSProduction in AutoCAD: Site layout, grading, tree preservation, planting plan, detailsBidding coordination: Coordination of advertisement, plan release, addenda release, bid tallies, contractsConstruction: Support in permitting process and review of contractor submittals
public speaking and publications
Year: 2008 Position: Intern with MESAProject: Creation of Stability Restoration Initiative for Habitat for HumanityRole: Directed, edited, and produced text (77 pages)
Year: 2010 Publication:Thesis of “Nature in Play” through Lambert Publications (62 pages)Public Speaking:Presented research at Texas ASLA Conference in 2011
Year: 2010 Project: Boerne Pedestrian TrailsPublic Speaking: Co-presenter with firm’s principal to Boerne City Council
travel
t
travel and photography Prague, Czech Republic.
t
Studying abroad in Bonn, Germany allowed me to experience significant landscape architectural sites firsthand.
Stourhead, United Kingdom.