MAPUTO PORT DEVELOPMENT COMPANY

PORT OF MAPUTO

Infrastructure and Operations update

MCLI Stakeholder Meeting - Nelspruit 22nd July 2015

Page 2: Port of Maputo Infrastructure and Operations update

Concession Information

• MPDC has the concession rights to operate the Port of Maputo andthe approved concession period ends in 2033 with an option toextend for a further 10 years

• Concession agreement was approved by Decree 20/2000 25th Julyand extend for additional 15 years by Decree 21/2010 30th June.

• An approved Port Master Plan is in place to ensures thatgrowth initiatives are implemented in a planned and structuredmanner. The master plan foresees a growth of the port up to 50million tons.

• A Rail Master Plan have been developed to enable the growthinitiatives contained in the Port Master Plan

Page 3: Port of Maputo Infrastructure and Operations update

Estrutura Accionista

MOZAMBIQUE GESTORES

Portos e Caminhos de Ferro de MoçambiqueMozambique Ports and Railways

49%

PORTUSINDICO

51%

Shareholder Structure

Page 4: Port of Maputo Infrastructure and Operations update

As principais responsabilidades da MPDC

MPDC – Port operator

MPDC – maritime Services

Ve

hic

le T

erm

ina

l

(Gri

nd

rod

)C

on

tain

er

Term

ina

l (D

P W

orl

d)

Bu

lk S

ug

ar

Term

ina

l (S

TAM

)

Ba

gg

ed

Su

ga

r Te

rmin

al

(ED

FM

an

)M

ola

sse

s Te

rmin

al

(ED

FM

an

)

Ve

gg

eta

ble

Te

rmin

al

(MS

LC)

Bu

lk T

erm

ina

l (M

PD

C)

Ma

tola

Co

al

Term

ina

l

(Gri

nd

rod

)

Ro

ya

ltie

s

Infr

ast

ruct

ure

Ma

inte

na

nce

& C

ha

nn

el

Na

vig

ati

on

1

2

3 MPDC – Port Authority

MPDC Main Responsibilities

Page 5: Port of Maputo Infrastructure and Operations update

Total concession area in 2003 = 140.6 ha

Total concession area in 2015 = 267.7

• Maputo Terminal – 129.5 ha

• Matola Terminal – 123.4 ha

• Catembe Terminal = 14.8

Total jurisdiction area = 5 594 ha

Port jurisdiction area for future developments

Page 6: Port of Maputo Infrastructure and Operations update

Volumes manuseados

14,7

5

1012

1517

19,3

0

5

10

15

20

25

1971 2003 2010 2011 2012 2013 2014

Carga em milhões de toneladas

Anos

2003-2014 386% Increase

12% *

* CAGR – 2003-2014

Historical Volume Handled

Page 7: Port of Maputo Infrastructure and Operations update

• Guarantee port capability to accommodate bigger

vessels ( 80 000 DWT Vs 60 000 DWT).

• Allowing for a direct link between Maputo and the Far

East.

• Improving navigational conditions.

Channel

Dredging

• Cargo segregation through the development of

specialised terminals.

• Compliance to regulations and sound environmental

practices.

Terminalisation

and

Environment

• Increase berth capacity.

• Reduce vessel turnaround time.

• Increase storage capacity and cargo handling

efficiency.

Infra-struture

Main Pillars of the Port of Maputo Master Plan

Page 8: Port of Maputo Infrastructure and Operations update

MPDC Warehouse rehabilitation

Projects in progress

New Access RoadMPDC Slab expansion for Chrome

Container Terminal expansion

CCTV and Access control

Main projects:

New Bulk Terminal and

berth 6,7 & 8 rehabilitation

Total port

Page 9: Port of Maputo Infrastructure and Operations update

EXPANSION OF CHROME SLAB - FASE V

• Area: 28,800 m2

• Capacity: 1,1 m tons per annum

• Contractual value: USD 5,5 m

• Completion Date: July 2015

Page 10: Port of Maputo Infrastructure and Operations update

OVERVIEW OF PORT EXPANSION PLAN

Page 11: Port of Maputo Infrastructure and Operations update

CONSTRUCTION OF NEW ACCESS ROAD – PHASE 1

• ROAD EXTENSION: 2,7 kM

• VALUE OF CONTRACT: 6 million USD

• DATE OF CONCLUSION: October 2015

Page 12: Port of Maputo Infrastructure and Operations update

CONSTRUCTION OF NEW ACCESS ROAD – PHASE 1

Page 13: Port of Maputo Infrastructure and Operations update

DREDGING PROJECT – CURRENT STATUS

Page 14: Port of Maputo Infrastructure and Operations update

DREDGING OF THE CHANNEL TO A DRAFT OF -14.2 m

Vessel type - Panamax bulk carrier:

• Beam: 32.3 m

• Draft: 14.2 m

• LOA: 225 m

• DWT: 60.000-80.000 tons

MAPUTO

MATOLA

INDIAN OCEAN

MAPUTO BAY

INHACA

ISLAND

International tender launched 1st

quarter 2015

Activities concluded:

• Verification of channel

dimensions

• Hydrographical study in

conjunction with INAHINA.

• Geological study.

• Vessel simulation study.

• Environmental licensing

MICOA.

• Approval of dumping sites.

Page 15: Port of Maputo Infrastructure and Operations update

Navigational Aid

In final stage of discussion with INAHINA

- Installation of virtual

- Installation of fixed buoys

- Installation Guiding Lights

Estimated value of system: USD 8m

DREDGING OF THE CHANNEL TO A DRAFT OF -14.2 m

Page 16: Port of Maputo Infrastructure and Operations update

• Channel dredging to -14m tomantain the competitivity whencompared to the regional ports

• Alignment of port and railcapacity.

• Naviagational Aids of the accesschannel.

• Space availability at Matola areato move dirty cargos.

• Human capital development

Critical Success Factors