Port Adelaide Distribution Centre, Gillman, SA
Port AdelaideDistribution Centre, Gillman, SA
Building overviewPort Adelaide Distribution CentreStockland’s Port Adelaide Distribution Centre offers an opportunity for a tenant to secure brand new premises designed to provide for B-Double drive around access, in Port Adelaide’s premier distribution centre.
A brand new facility offering B-Double access, secure yards and high clearance warehousing.
A new facility of 7,640 square metre facility boasting:
• Drive around access for B-Doubles
• ESFR sprinklers
• 10 metre clearance
• Secure yard
• 10 roller shutter doors
• Cross-dock capabilities
• Staging area
• 9 metre awning totalling 746 square metres
• Secure parking
• Industry zoning permitting a wide variety of uses
• Ample car parking
Specifications
Seeking pre-commitments now.• Can be tailored to fit your requirements.
Port Adelaide Distribution Centre, Bedford Street, Port Adelaide SA 5015
Port Adelaide Distribution Centre
EASTERN PARADE
BEDF ORD STREETST VINCENTS STREET
PORT RIVER EXPRESSWAY
GILLMAN
GRAND JUNCTION ROAD
OLD PORT ROAD
PORT ROAD
Port of Adelaide
Port Adelaide Distribution Centre
ADELAIDE AIRPORT, 14km southwest
ADELAIDE CBD, 12km south
Port Adelaide Distribution Centre, Bedford Street, Port Adelaide SA 5015
EASTERN PARADE
BEDF ORD STREETST VINCENTS STREET
PORT RIVER EXPRESSWAY
GILLMAN
GRAND JUNCTION ROAD
OLD PORT ROAD
PORT ROAD
A central locationLocated just 12kms north-west of the Adelaide CBD and minutes from the Port, Port Adelaide Distribution Centre presents a new business opportunity in the heart of the Adelaide’s logistics and distribution precinct that will suit the most discerning user’s business needs.
Adelaide Airport, 14km
Convenient access
Port River Expressway 1km
Port Adelaide Railway 1km
Adelaide CBD, 12km
Port Adelaide Retail and Business District, 1km
NORTH EA
ST RO
AD
N
AdelaideAirport
ADELAIDECBD
AdelaideHarbour
ST KILDA
M1
PORT
WA
KEF
IELD
RO
AD
PORT RIVER EXPRESS WAY
SALI
SBURY
H
IGH
WAY
M5
NORTHERN EX
PRES
SWAY
M20
PORTADELAIDE
MAI
N N
ORT
H R
OAD
PORT ROAD
Major Industrial Parks
SOUTH EASTERN FREEWAY
20 kms
10 kms
30 kms
40 kms
Port Adelaide Distribution Centre
Major Industrial Precinct
Port Adelaide Distribution Centre, Bedford Street, Port Adelaide SA 5015
Site plan
(e) BITU
MENACCESS
ROAD
(e) BITUMEN
ACC
ESSRO
AD
(e)WAREHOUSE
RAILWAY RESERVE
PROPOSEDOFFICE / WAREHOUSE
7640sqm
HEAVY VEHICLEENTRY
HEAVY VEHICLEEXIT
9m DEEP CANTILEVEREDAWNING OVERLOADING ZONE
15m TURNING CIRCLERADIUS SHOWN DASHED
ADDITIONAL STAFFCARPARK
3.00m DEEPCANTILEVERED
AWNING
DOUBLE
GATES
DOUBLE
GATES
DOUBLE
GATES
PROPOSED
OFFICE
Site Area .................................. 1.4haBuilding Area ....................7,640sqm*
*Area subject to final survey
*Plans subject to change
Tenancy plan
SHAREDZONE
TURNAROUND
ZONE
PADOOR
PADOOR
PADOOR
PADOOR
PADOOR
PADOOR
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.COL
.CO
L.C
OL
.CO
L.C
OL
.CO
L.C
OL
.CO
L.C
OL
.CO
L.C
OL
.CO
L.C
OL
.CO
L.C
OL
.CO
L
.BOL
.BOL
.BOL
.BOL
.BOL
.BOL
.BOLPA
DOOR .BOL
2.1M
CH
AIN
WIR
E FE
NC
E
DOUBLE GATES
LOCATION OFRAINWATER TANKS
LIN
E O
F A
WN
ING
OV
ER
9m DEEP CANTILEVEREDAWNING OVERLOADING ZONE
I
.3 00m DEEPCANTILEVEREDAWN NG OVER
Canopy B
STAFF / VISITORCARPARK
6mx
6mR
OLL
ERD
OO
R6m
x6m
RO
LLER
DO
OR
6mx
6mR
OLL
ERD
OO
R6m
x6m
RO
LLER
DO
OR
6m x 6mROLLER DOOR
6m x 6mROLLER DOOR
6m x 6mROLLER DOOR
6m x 6mROLLER DOOR
6m x 6mROLLER DOOR
6m x 6mROLLER DOOR
CONCRETE HARDSTANDDOUBLE GATES
DOUBLE GATES
ADDITIONALSTAFF CARPARK
PROVISION FORRAINWATER TANKS
LINE OF AWNING OVER
Canopy A
Canopy A
SHAREDZONE
TURNAROUND
ZONE
LANDSCAPEDGARDEN
LANDSCAPEDGARDEN
LANDSCAPEDGARDEN
PROVIDE KERB RAMPAS PER AS1428.1
ES
STAFF / VISITORCARPARK
BT.01
12 CARPARKS1 ACC S
DASHED LINE DENOTES600 OHANG FOR O/HANGOF CARPARKING
BOU
ND
AR
Y
.COL
.COL
.COL
.COL
.COL
.COL
DOUBLE GATES
2.1M
CH
AIN
WIR
E FE
NC
E
OU
TLIN
E O
F A
WN
ING
OV
ER
.COL
.COL
.COL
.COL
.COL
.COL
LOW LEVEL AWNING BELOW HIGH LEVEL AWNING CONTINUING BELOW
WAREHOUSE 2Ground FloorWarehouse ................................... 7,260sqmOffice & Amenities ...........................190sqmFirst FloorOffice & Amenities ...........................190sqm
Total Area .................................. 7,640sqm
Canopy A ........................................ 746sqm Canopy B ........................................108sqm
FIRST FLOOR
*Plans subject to change
PROPOSED WAREHOUSE 7260sqm
MINIMUM HEIGHT 10M
WAREHOUSE
WAREHOUSE
PROPOSED OFFICE UPPER
190sqm
PROPOSED OFFICE 190sqm
PROPOSED OFFICE 190sqm
NOTE: ALL PA DOORS TO BE CONFIRMED BY FIRE SAFETY
SERVICES CONSULTANT/ENGINEER
Design specificationThe design and construction of the facility shall meet all Australian Standards, be in accordance with the regulations set out in the Building Code of Australia and meet all Authority requirements.
WarehouseConcrete and Floor Slab
• Internal Warehouse floors shall be finished with a double helicopter trowel for a burnished finish.
• The warehouse floor shall be designed for a minimum of 6.0 tonne point load and 35kPa UDL.
• Unlimited hard wheel forklift repetitions of 2500kg-lift capacity.
Structural Steel
• Single row of columns with a 40 metre span.• Springing heights to a minimum of 10 metres.
External Walls
• Precast concrete dado panels to 2400mm high above floor level (3000mm high where required to provide fire ratings for hydrants and services rooms in accordance with the BCA), painted externally with selected flat paint finish,
• Colorbond finish wall cladding above precast panels. • Internally precast concrete panels are to be finished to a smooth steel
trowelled finish.
Roof
• Zincalume sheeting (unless required otherwise by local Authorities) with translucent sheets equal to minimum 10% of warehouse roof area.
Awnings and Canopies
• Awnings to project a minimum of 9m from the face of the building over on-grade roller shutters.
• Awnings to be bird proof protected in an approved manner. Minimum 6m clearance under awnings to all structure and services.
Dock and Access Doors
• Docks at grade with 6.0m wide x 6.0m high motorised roller shutter door. • Roller shutter doors and guide covers to be painted with selected high
performance paint or powdercoat finish.• Roller shutter doors to be individual slats of thickness suitable for door width and
wind loads nominated by the Structural Engineer.• All docks to be provided with an appropriate level of lighting to be functional 24 hours.
Warehouse Lighting
• Lighting level to be 200 lux (at 1.2m above floor level).• Each third row of lighting to be switched separately to allow reduced
‘night light’ for security / safety out of operating hours.
OfficeThe office areas will comprise glazed curtain walling / shop front glazing, painted CFC, masonry, concrete, and precast concrete or metal cladding to suit the architectural design.
Floor – Office Floor Slab
• Floor slabs to be designed generally for a live load capacity of at least 3 kPa + 1 kPa for partitions.
• Compactus areas of approximately 5% of each office floor level are to be designated and have a load capacity of 10 kPa.
ServicesPower Capacity
• Premises design to accommodate a total supply load based on 25 VA/m² of warehouse, 120 VA/m² of office.
Mechanical
• Separate air conditioning systems will be provided to agreed zones within each office level.
• Each system will be zoned to maintain and provide comfort conditions with office perimeters to be zoned separately to central office areas.
• No ducts or equipment apart from diffusers, thermostats and controls will be visible from the office space.
Port Adelaide Distribution Centre, Bedford Street, Port Adelaide SA 5015
Fire Services
• ESFR Fire Sprinklers to be provided relative to storage fire load and internal building height of the warehouse area.
• Hydrants, fire hose reels, smoke detection and extinguishers will be provided in accordance with the BCA, Australian Standards or other relevant authorities requirements.
• Fire hose reels and hydrants within office areas are to be enclosed within a cupboard.
General Site WorksSignage
• Directional signage as required for efficient operation of the carpark area and estate.
• Tenant signage areas will be provided.
Truck Parking and Turning Aprons
• Aprons and truck areas designed to accommodate Semi-trailers and B-Double vehicles to Australian Standard turning circle requirements.
Landscaping
• Plants will be a selected range of Australian native ground cover.
Estate / Facility Operating Hours
• The design of this project is to take into account that the built facility may operate on a 24 hour, seven day week basis.
• Final operating hours and conditions are subject to local Authority approvals.
Environmental Sustainability
• The building design is to include energy and water saving initiatives such as solar water heating, energy efficient lighting, native landscaping and rainwater collection for irrigation and toilet flushing, subject to local authority approvals.
Port Adelaide Distribution Centre, Bedford Street, Port Adelaide SA 5015
Partnering with StocklandAn overviewStockland is one of Australia’s leading diversified property groups with total assets of over $14.8 billion in Australia. We own, manage and develop a wide range of residential and commercial properties.
Stockland Commercial Property provides active asset management in a portfolio of 100 retail, office, logistics and business park properties across Australia valued at $8.5 billion.
Logistics and Business Parks Currently with 21 properties and growing, Stockland’s logistics and business parks portfolio is valued at $1.6 billion. Our properties are strategically positioned for logistics, infrastructure and employment.
Disclaimer: While every endeavour has been made to ensure the accuracy of the information contained in this document, Stockland Corporation Limited and its related entities (Stockland) give no warranty, guarantee or representation that the information provided is complete, accurate, up to date or suitable for your particular use or transaction. Stockland will not be liable for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a result of your use of, or reliance on, or interpretation of the information provided in this document. You should seek legal or other professional advice in relation to the information contained in this document. June 2014.
Contact our team
Robert MacKay National Development Manager0412 338 [email protected]
Visit our website:
Steve SmithM 0410 532 022 P 08 8212 8880 Level 2, Aston House, 15 Leigh Street, Adelaide SA 5000 [email protected]
Andrew ZammitM 0417 814 398 P 08 8212 8880 Level 2, Aston House, 15 Leigh Street, Adelaide SA 5000 [email protected]
www.portadelaidedc.com.au