This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
39 yrs experience in the field of power sector, refineries and petrochemicals. Has served as the Vice President in UB group. Reputed & renowned professional in the power sector.
2. Mr. Anjani
Kumar Director B.E (Mech.)
35 years of rich experience in project Management, Operation, Maintenance, Erection Commissioning, Trouble shooting, Efficiency improvement and Energy Auditing, Retrofitting and Capacity Enhancement of Boilers and Power plant equipment’s.
3. Mr. M.S Kaswan
Director B.Com, BBM 26 Yrs experience in the field of finance
& accounting.
4. Mr. Harsimran
Singh Director B.Tech (Mech.)
8 yrs experience in the field of the power sector.
5. Mr. Aman Deep
Singh Director B.Tech (Mech.)
6 Yrs experience in the field of refinery and fabrication shops
Our Vision is using our passion expertise power and process industries as well as related
infrastructures to create lifetime customers by
being laser focused on providing the best
concrete value and pleasurable service to every
single client.
Our Mission is to improve continually our products and services to meet our customer's needs through.
Our focus on total system integration and optimization. This is accomplished by first understanding our customer's unique needs.
Continuously improving the cycle time reduction and modernization of construction methods applicable for the power, process and infrastructure industries.
We SIMAR INFRASTRUCTURES LIMITED are fully committed to have sole contribution from all of our employees, Business partners and Client as well, to ensure safe work practice with enhancement in their Behavioral Based Safety, through this policy:
We strive for excellence in all safety aspect for followings:
Ensure prescribed and periodical medical checkup for employees and workers.
Aim to reduce the risks to the health, all workers, contractors and visitors.
Periodical and as necessary training to employees for optimum implementation of HSE Policy.
Daily identification of unsafe conditions / unsafe acts at site and closure of the same.
Compliance of safety policies as per factory act and state government laws.
Establishing and maintaining the HSE system within the company at all of its sites.
Establishing and maintaining a culture for usage of “Right tools for Right Jobs”.
Training and educate all workmen, for importance of “Workplace Hygiene and Safety”.
Safety Motivational Programs by rewarding Outstanding Safety Performer on monthly basis.
38 years’ experience in the field of power sector, refineries, petrochemicals, Has served as the Vice President in UB group. Reputed & renowned professional in the power sector.
2. Mr. Anjani Kumar Director B.E.
(Mech.)
35 years of rich experience in project Management, Operation, Maintenance, Erection Commissioning, Trouble shooting, Efficiency improvement and Energy Auditing, Retrofitting and Capacity Enhancement of Boilers and Power plant equipment’s.
3. Mr. MS Kaswan Director – Finance
B.Comm
26 Years’ experience in the field of finances, taxes & duties.
4. Mr. Harsimran
Singh Director –
Operations B.Tech
(Mech.)
08 Years’ experience in the field of power Plants.
5. Mr. Aman Deep
Singh
Director – Business
Development
B.Tech (Mech.)
06 Years’ experience in the field of the power.
6. Mr.Inderjeet Gera Executive
Director
Chartered
Accountant
20 years’ experience in the field of finances,
expertise in balance sheet, taxes & duties.
7. Mr. Brij Pal Singh Chauhan
Executive Director
B.Tech
(Mech.)
38 Years’ experience in the field of Fabrication, Power Sector, Fertilizer, Refineries and Hydro projects.
8 Mr. Arvinda Kumar Vice
President
B.Tech
(Mech)
Over-all 38 years of experience in the Construction field in India & Overseas; Abroad (Europe, Middle
East, Far East, CIS countries, African Countries). Mechanical piping, equipment installation. Exposure to the various functional areas in construction industry.
9 Mr. J.S. Chahal Sr.GM Diploma (Mech.)
35 Years’ experience in the field of Power Sector, Fertilizer, Refineries and Hydro projects.
10 Mr. Awadh Jha Chief
General Manager
B.E (Mech.) 39 years’ Experience in the field of the power sector. Again very renowned and respected professional in the power sector.
Operation & Maintenance, Mechanical, Electrical and C & I, Field operations of Power Plants Consisting of Switchyards, Switchgears, Boilers, Turbines, BOP, AHP, CHP, Water Management System of Thermal Power plants.
Sr. No
Description of Works Plant / Client Name
Duration Status
1 Complete Mechanical maintenance and Operation of Boiler & its Auxiliaries, Ash Handling of 3x660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab
TSPL/Vedanta Group
36 Months
Continue…
2 Field Operations for all three units of 3x660 MW Super Critical Power Plant at Talwandi Sabo, Mansa Punjab
TSPL/Vedanta
Group 36
Months Continue…
3 Providing Water System Operational Manpower for One Unit Operation for Talwandi Sabo Power Ltd. Mansa, Punjab.
TSPL/Vedanta
Group 24
Months Continue…
4
Providing Manpower for Security Purposes at Talwandi Sabo Power Ltd.,Punjab.
TSPL/Vedanta
Group 12
Months Continue…
5 Job Contract for assistance in day to day function at GHVP for technical Supervisor ,Clerical Assistance ,Pantry Service ,Security and Office Housekeeping Service for One Year.
NPCIL 12 Months
Continue…
6 AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.
JSW 36
Months Continue...
7 AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.
JSW 36
Months Continue...
8 Annual Plant Maintenance of Six generating Units of 6x68.67 MW SJVN Limited at Rampur HPS Jhakhari,Shimla Himachal Pradesh.
SJVN (Hydel
Project)
12 Months
Continue…
9 AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.
LANCO-Amarkantak
36 Months
Continue...
10 Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited.
11 Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, Switch Yard, Switch Gears including HT / LT System etc of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.
GVK 36
Months Continue…
12 Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc of 2x600 MW of at LANCO Anpara Power Corporation Ltd, Uttar Pradesh.
LANCO 36
Months Continue…
13 Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system ,Ash Handling & BOP including Material Handling of Stores and Up keeping of Equipments of 2x600 MW -LANCO at Udupi Power Corporation Ltd, Udupi,Karnataka.
LANCO 36
Months Completed
14 Annual Contract for Mechanical Maintenance of Boiler & its auxiliaries, Turbine auxiliaries,CHP ( Beyond RCC Bunkers ) ,AHP,WTP and BOP at 50MW Unit No. 1
ACB-Spectrum Coal & Power
12 Months
Continue...
15 Maintenance work for Electrical and Control & Instrumentation of 1x300 MW Thermal Power Plant.
Maruthi Clean &Coal
12 Months
Continue..
16 Operation & Maintenance of Ash Handling Plant at TRN Energy Pvt.Ltd (2X300 MW), Raigarh, C.G. TRN Energy
12 Months
Continue..
17 Annual Maintenance Contract For Mechanical Maintenance (BTG+Water System),Raigarh(2x300)
TRNEPL 12
Months Continue..
18 Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600 MW Boilers at Jharsuguda
SEL IPP/ EESI 84
Months Completed
19 Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Jharsuguda.
SEL IPP/ EESI 36
Months Completed
20 Field Operations of BOP of 4 x 600 MW Boilers at Jharsuguda
SEL IPP/ EESI 72
Months Completed
21 Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh
DB POWER 24
Months Completed
22 Manpower Assistance services for Operation and Maintenance of 1x108 MW Gas Power Plant
TPDDL 24
Months Continue...
23 Complete Mechanical Maintenance of Boiler Section of CFBC boiler of 4x135 MW power plant at DCPP of JSPL at Dongamuha, Raigarh
JSPL 12
Months Continue…
24 Maintenance of Mechanical Systems of Unit #1, 2 of
coal based Thermal Power Plant at Talwandi Sabo Power
Ltd. (TSPL) Mansa, Punjab.
25 Operation and Maintenance of complete Coal Handling Plant – II of 2x210 MW boilers.
PTPS / TECPRO
07 Months
Completed
26 Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2x250 MW.
PTPS / TECPRO
07 Months
Completed
27 Maintenance of all Equipments of Conveyor System (Routine & Breakdown) & Heavy Equipments of Coal Handling Plant – II of 2 x 210 MW Boilers.
PTPS / HPGCL 07
Months Completed
28 Complete Mechanical Maintenance of Equipments of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers.
PTPS/ HPGCL 24
Months Completed
29 Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipments installed at CHP-II of 2 x210 MW Boilers
PTPS/ HPGCL 15
Months Completed
30 Renovation & Modernization of Conveyor Belts by replacing existing Troughing Idlers frame with Rollers, Flat Return Idlers, Troughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Troughing Angle with 35 Troughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW boilers.
PTPS/ RMEC 06
Months Completed
31 Complete Maintenance of Tube Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6
PTPS/ HPGCL 15
Months Completed
32 Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2.
PTPS / HPGCL 15
Months Completed
33 Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2
RGTPP/ HPGCL
15 Months
Completed
34 Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5
PTPS 15
Months Completed
35 Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5
PTPS/ HPGCL 15
Months Completed
36 Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2x300 MW at Unit – 1&2.
1 Annual Overhauling of Boiler & its auxiliaries at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra.
TATA POWER -CGPL
02 Months
Continue...
2 Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2x600 MW CLP Jhajjar- Haryana
CLP 2 Months Completed
3 Annual Overhauling of APH & Fans of unit #1 at 2x600 MW CLP Jhajjar- Haryana
CLP 01 Month Completed
4 Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary
JSW 02 Month Continue…
5 Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary
JSW 02 Months
Continue…
6 Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary
JSW 02 Months
Continue…
7 Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar.
JSPL 02 Months
Continue…
8 Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2x300 MW
JSW/Bellary 09 Days Completed
9 Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2x300 MW
JSW/Bellary 45 days Completed
10 Capital Overhauling of Pressure Parts, Burners, Pent & Dog House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month
Completed
11 Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
12 Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
13 Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
14 Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar.
HPGCL/REL 01 Month Completed
15 Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts.
PTPS 1.5 Months
Completed
16 Commissioning Support for Mechanical Maintenance Work of Power Plant Equipments, Piping, Valves etc at 2x700 MW NPL Rajpura, Punjab
NPL 06 Months
Completed
17 Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc For 135 MW Power Plant at Angul, Orissa.
18 Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.
JSPL 01 Month Completed
19 Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.
JSPL 01 Month Completed
20 Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat
PTPS /HPGCL 01 Month Completed
21 Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat
PTPS / HPGCL 01 Month Completed
22 Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2
PSEB/ ALSTOM
01 Month Completed
23 Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2
PSEB/ ALSTOM
01 Month Completed
24 Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 3
PSEB/ ALSTOM
01 Month Completed
25 Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4
PSEB/ PCP 01 Month Completed
26 Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5
PSEB/ PCP 01 Month Completed
27 Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6
PTPS / HPGCL 01 Month Completed
28 Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6
PTPS/ RMEC 01 Month Completed
29 Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2
PTPS/ HPGCL 01 Month Completed
30 Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3
PTPS/ HPGCL 01 Month Completed
31 Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5
PTPS/ HPGCL 01 Month Completed
32 Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6
PTPS/ HPGCL 01 Month Completed
33 Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2
PTPS/ HPGCL 01 Month Completed
34 Overhauling Work of Repairing of Pent House, Boiler Drum Internals, Inspection and Repairing of Hangers of 110 MW of Unit -3.
PTPS / HPGCL 01 Month Completed. Doing from last 7 years
35 Overhauling of Fuel Firing System i.e. Burner, HFO Pumps & Heaters and Steam/HFO Valves of 110 MW Boiler at Unit -1
Fabrication, Erection, Testing and Commissioning, Maintenance- Refineries (Oil& Gas), Fertilizers, Petrochemical, Process Plants and Power Plants.
S.
No Description of Works Plant / Client
Name Duration Status
1.
Mechanical Field Works at IIR Butyl Rubber Plant-, Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc…
Reliance Sibur Elastomers
Private Limited 12 Months Continue..
2. Under Ground Piping Works
Reliance Sibur Elastomers
Private Limited 8 Months Continue..
3. Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naptha Cracker, Panipat, Haryana.
IOCL 12 Months Continue…
4.
Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project
Reliance/ Linde Engineering India
Ltd 09 Months Completed
5.
Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND)
Reliance
Jamnagar
Refinery 06 Months Continue..
6. Stack Height Increase, CFN Piping and Flue Gas Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat.
Reliance Jamnagar Refinery
2.5 Month Completed
7.
IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat.
Reliance
Jamnagar
Refinery 1.5 Month Completed
8. Service contract for ‘Rotary & Static Equipment Maintenance’ at ISRL Complex, Rubber plant, Panipat, Haryana.
ISRL Panipat
36 Months Continue...
9.
Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS,AS,SS,P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa
OCFL 24 Months Completed
10. Fabrication, Erection, Testing and commission of piping (Executed Qty: - 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) of combined
cycle of 72 MW including commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka.
11.
Fabrication, Assembly, Erection, Testing and Commissioning of Piping (Total Executed Qty of 69000 Inch Meter) which includes CS,SS, 304L, 309L Above Ground and Under Ground of Terry Towel Project at Trident Ltd, Barnala, Punjab.
TRIDENT 08 Months Continue..
12.
Fabrication, Assembly, Erection, Testing and Commissioning of Piping (Total Executed Qty:- 6400 Inch Dia Above Ground and Under Ground) of Pharmaceutical Plant at Trident Ltd, Barnala, Punjab.
TRIDENT 06 Months Continue..
13.
Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery.
IOCL/ISGEC 06
Months Completed
14.
Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project
Reliance
Jamnagar
Refinery 30 Months Completed
15. Structural Erection works-MEG area
Reliance
Jamnagar
Refinery 08 Months Continue…
16. Mechanical structural erection at SEZ PCG area
Reliance
Jamnagar
Refinery 01 Year Continue...
17. Circular Platform Erection works SEZ-MEG area
Reliance
Jamnagar
Refinery 02 Months Completed
18. Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipments(rotary +Static)
ICS Senegal 06 Months Continue...
19. Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore,Karnataka (QTY -02 No. stacks).
OMPL/TOYO/ THERMAX
03 Months Completed
20.
Assembly, Erection, Testing and Commissioning of Static and Rotating Equipments (Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa
OCFL 22 Months Completed
21. Fabrication of Pressure Vessels and Evaporators.
Y’NAGAR/ ISGEC 15 Years Completed
22. Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers.
Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4x600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa.
SEL IPP/ EESI 12 Months Completed
24.
Fabrication of Pressure Parts of High Pressure Boiler Components i.e Water Wall Tubes, Economiser, LTSH, Loose Tubes, Panels, Roof Tubes.
RATANGARH/ ISGEC
15 Years Completed
25.
Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers.
LNT-MHI/ FL 12 Months Completed
26.
Fabrication of structures, ducting, Boiler Elevators at 2x600 MW at Reliance 2x600 MW Hisar, Haryana.
HPGCL/ Reliance
12 Months Completed
27.
Erection & Commissioning of Mechanical Works For
Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING,
STACKING VERIFICATION,STORE MANAGEMENT For
1X20 MW MWV India Packaging Board PVT Ltd Vapi,
Gujarat
Thermax/ Vapi 12 Months Continue..
28.
Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1x4.1 MW CPP of NV International Pvt. Ltd.
NV International/The
rmax 12 Months Continue...
29.
Erection, Testing and Commissioning of complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat , PSEB, Bathinda Punjab
PSEB 24 Months Completed
30.
Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana
HPGCL/REL 02 Months Completed
31.
Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar
RGTPP/REL 12 Months Completed
32.
Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar
DCRTPS/REL 12 Months Completed
33.
Erection, Testing & Commissioning of 1x170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc at Rewa.
JAYPEE 18 Months Completed
34.
Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2x600 MW at RGTPP, Hisar
RGTPP/REL 05 Months Completed
35. Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water
Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc.
36. Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW.
RGTPP/ HISSAR
08 Months Completed
37.
Modification of the Structure including addition of Landing Platform at different level for Unit – 1 & 2 of 2 x 600 MW
RGTPP/ HISAR
06 Months
Completed
38.
Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS at Panipat
HPGCL/WRC 12 Months Completed
39.
Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan
JK Cement/ Thermax
12 Months Completed
40.
Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh
JSPL 01 Month Completed
41.
Erection, Testing & Commissioning of 1x120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh
TRIVENI/IJT 11 Months Completed
42.
Erection, Testing & Commissioning of 1x47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan
SANJOG SUGARS/ IJT
06 Months Completed
43.
Fabrication, Painting , Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of Fuel handling system of 2 x 250 MW at Panipat
HPGCL/ INDURE 08 Months Completed
44.
Complete Package of Fuel Handling system with Piping IBR /NON IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat
Erection, Testing & Commissioning including O&M- Ground Mounted Solar Power Plants
Sr. No
Description of Works Plant / Client Name
Duration Status
1. Operation & Maintenance including the mechanical cleaning of modules of Responsive SUTIP Ltd. 1 x 25 MW PV Solar Power Plant at Responsive Site, Kamalpura & Rajpur
MBL 48 Months Continue...
2. Operation & Maintenance including the mechanical cleaning of modules of Chattel Construction Pvt. Ltd. 1 x 25 MW PV Solar Power Plant at Chattel Site, Zinabad.
MBL 48 Months Continue...
3. Operation & Maintenance including the mechanical cleaning of modules of Ujjwala Power Private Ltd. 1 x 25 MW PV Solar Power Plant at Chattel Site, Kamalpur
MBL 48 Months Continue...
4. Erection, Testing & Commissioning of 05 MW Solar Power Plant at Pattan, Gujarat.
MBL 02 Months Completed
5. Erection, Testing & Commissioning of 25 MW Solar Power Plant at Upleta, Gujarat.
MBL 03 Months Completed
6. Erection, Testing & Commissioning of 10 MW Solar Power Plant at Palanpur, Gujarat.
MBL 03 Months Completed
7. Erection, Testing & Commissioning of 10 MW Solar Power Plant at Porbandar, Gujarat.
MBL 03 Months Completed
8. Erection, Testing & Commissioning of 05 MW Solar Power Plant at Bolangir, Orissa
MBL 02 Months Completed
9. Erection, Testing & Commissioning of 05 MW Solar Power Plant at Pipava, Gujarat.
MBSL 02 Months Completed
10. Erection, Testing & Commissioning of 05 MW Solar Power Plant at Fatehpur, Gujarat.
MBSL 02 Months Completed
11. Erection, Testing & Commissioning of 10 MW Solar Power Plant at Kamalpur, Gujarat.
MBL 03 Months Completed
12 Erection, Testing & Commissioning of 10 MW Solar Power Plant at Jenabad, Gujarat.
MBL 03 Months Completed
13 Supply, Erection, Testing & Commissioning of 01 MW Solar Power Plant at Pataudi, Rajasthan.
TATA BP 03 Months Completed
14 Erection, Testing & Commissioning of 1.1 MW Solar Power Plant at Bap, Rajasthan.