POINT OF WORK RISK ASSESSMENT Date 15 Apr 2019 Project Eco of London Site Location: 30 st Mary axe, London Task: ups startup Applicable Risk Assessments: London Before commencing work review the Task Specific Risk Assessment. If no additional hazards identified mark not applicable and signoff this form. Where Hazards/Risks are not covered in the Task Specific Risk Assessment complete the detail below. Use the back of the sheet if necessary. No. Hazard / Risk Control Measures Implemented 1 Other contractors in comms room Good communication and good housekeeping 2 Heavy parts to be lifted Correct mainsail handling techniques used and safety boots worn IF THE HAZARD / RISK CANNOT BE CONTROLLED DO NOT PROCEED Indicate Number of Persons at Risk Employees: 1 Contractor Staff: 0 Public: 0 ALL Persons must sign on to the risk assessment. It must be ensured that the contents are fully discussed, agreed and understood by all Name Signature Robert Holden C O N T R A C T O R S Name Signature Name Signature IF IT´S NOT SAFE - DON´T DO IT