Service Order No. 3876 Date Project Information Project: RA-140, Jabar Al-Ahmad Cau Client: Ministry of Public works (MP Contractor: Hyundai Engineering & Const Consultant: DAR-Al-Handash Sampled By: Hyundai Engineering & Const Test Result Date of Sample Received 5/5/2015 Sample ID Failure Load #1 18.41 43.2 Source : S Sample Location: RA-140, Note : 1.0 This report shall not be reproduced, except in full, without the prior approval of the management of ‘TSD’. 2.0 The results relates only to the items tested. Specimen Size Dia/Width in "mm"
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ASTM D 5731
Service Order No. 3876 Date
Project Information
Project: RA-140, Jabar Al-Ahmad Causeway
Client: Ministry of Public works (MPW)
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#1 18.41 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#2 10.45 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#3 21.05 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#4 20.27 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#5 30.99 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#6 20.94 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#7 18.3 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
Contractor: Hyundai Engineering & Construction Co.
Consultant: DAR-Al-Handash
Sampled By: Hyundai Engineering & Construction Co.
Test Result
Date of Sample Received 5/5/2015
Sample ID Failure Load
#8 29.51 43.2
Source : Stevin Rock (UAE)
Sample Location: RA-140, Jabar Al-Ahmad Causeway
Note : 1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.
1.0 This report shall not be reproduced, except in full, without the prior written approval of the management of ‘TSD’.2.0 The results relates only to the items tested.