Top Banner
PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4 August 12, 2010
24

PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Dec 31, 2015

Download

Documents

yvette-hyde

PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4. August 12, 2010. RTUG Agenda 081210. 9:30-9:45 : Introductions; Agenda Review; RTUG - A Look Ahead RTUG Work Plan Review 9:45-11:45 Bonneville-Cadmus RTU Research Work - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

PNW Rooftop Unit Working Group- RTUG –

Rooftop Unit Research Project Phase 4

August 12, 2010

Page 2: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

RTUG Agenda 0812109:30-9:45: Introductions; Agenda Review; RTUG - A Look Ahead

RTUG Work Plan Review9:45-11:45 Bonneville-Cadmus RTU Research Work• Results from BPA annually monitored RTUs• Preliminary winter fan schedule persistence results• Preliminary heat pump heating energy results• Preliminary RTU gas-pack heating energy results• Preliminary economizer results• Preliminary annual signature• Addition to the analysis protocol of min/max supply air temperatures• Analysis improvements for minimum and economizer airflow analysis• Preliminary error band observations • Brief description: SAS data management/analysis tool11:45-Noon Status: Regional RTU Research Results Database

http://www.nwcouncil.org/energy/rtf/studies/ongoing/rtug/2009_rooftop/Default.aspx 12:00- 1:00pm Lunch

1:00-1:15 Web-enabled Thermostat Research: monitoring status Months 13-24 data acquisition scenario

1:15-1:30 Energy Trust of Oregon RTU O&M Update1:30-2:00 Premium Ventilation VSD Measurement Results: “The Turn of the Screw…” 2:00-2:45 Policy topics: a) RTU airflow service issues, b) measure persistence,

c) measure life2:45-3:30 Elements of Regional RTU Strategic Plan3:30pm Adjourn

[Breaks taken as needed]

Page 3: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

RTU Research Outputs

--for October 27 RTUG final meeting:• Draft annualized savings methodology with separate

characterizations of annual operation for summer and winter

• Data block interval analysis• Recommendations regarding fan schedule persistence• Site temperature vs. TMY data• Additional persistence analysis• Billing/signature analysis for selected sites• Measure life implications from the data

Page 4: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

RTUG Work Plan• Actively promote collaboration within/outside the region

on EM&V protocols, RTU efficiency research

• Review BPA research results and assist in drafting the proposed annualized savings methodology

• Assist in implementing the Regional RTU Research Results database – RRRR or R4 database

• Lead the RTUG through a process to scope technical and related elements of a regional RTU Strategic Research Plan

• Identify options for equipment redesign, deeper retrofit and early replacement

Page 5: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Current RTUG Schedule

• NBI contract with NPCC/RTF through November 2010

• 3 RTUG meetings:

– May 26 Aug 12 October 27

• RTF Nov 2

• Next steps…

Page 6: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

RTU Strategic Plan Elements

• Technical Assessment

• Programmatic

• Advocacy/Collaboration

Page 7: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

RTF to maintain functional data repository with open access. Add appropriate data sets and analytical results as available from Avista, Idaho Power, Puget Sound Energy, Premium Ventilation Project, Pacific Northwest Laboratory, BPA Web-enabled thermostat project, and others in and outside the region

• Develop a research scope/budget for establishing and extending a low cost monitoring protocol on a set of RTUs for up to 60 months. Candidates should chosen through operating RTU service programs

– Track persistence of performance for all components; track maintenance costs– Whole building conditions and operating changes substantially documented– Active customer/HVAC contractor contact with education/training for both groups

• Develop a research scope/budget to establish RTU measure life values• Reconciliation between modeling and metered result inputs to modeling • Whole building data analysis • Lower cost RTU field monitoring • Premium Ventilation Package: Near-Term + Extended Function Testing and Analysis• Economizer research program including DCV interaction• Test of web-based RTU control and performance monitoring to determine impact on

building operator schedule management using the monitoring information • Improve DOE2/eQUEST RTU calculations

Technical Assessment

Page 8: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

• Minimum air flow: - technical: field measurement & service protocol- building code requirement- program protocol- program benefit-cost issue

• Measure life: 6th Plan = 18yrs comp/5 yrs O&M

• Operating (measure/system?) persistence: ?

RTF RTU Challenges

Page 9: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Additional Measures• Add economizers• Controls: Premium Vent Package, other?• Demand Controlled Ventilation (DCV) • FDD/performance monitoring• ECM/VSD• Gear-driven economizer actuators• Airflow/ventilation including outside air damper issue• Other?Market Impacts/Transformation

– Customer education– HVAC contractor/distributor education/training– Quality Installation/Quality Maintenance standards

New RTU products: Lennox Energence, H80 Hybrid RTU

Early RTU Retirement: What is the size of the regional benefit?

Programmatic

Page 10: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

ETO Tune-up Options (Office/Retail)3 or 4 Ton Roof Top Unit Incentive Requirements

1 Install new economizer with DCV controls Includes Economizer package, new O/A Sensor, new Two-stage Programmable Thermostat and DCV control, installed and set for maximum energy savings.

2 Install economizer without DCV controls Includes Economizer package, new O/A Sensor installed and set for maximum energy savings. Existing Programmable Thermostat already has Two-stage cooling and is in working condition. DCV controls not warranted due to space occupancy.

5 thru 20 Ton Roof Top Unit Incentive Requirements3 Tune up unit with existing economizer with thermostat

and sensor replacement.Replacement of existing economizer O/A sensor and thermostat that does not have two-stage cooling, or that is not programmable. Economizer must work properly after tune up as per Form 180TE checklist. (Damaged dampers, damper linkage and damper motors shall be fixed prior to tuning up if found non-functioning.)

4 Tune up unit with existing economizer with sensor replacement only.

Replacement of existing economizer O/A sensor only and performing services per Form 180TE checklist. (Damaged dampers, damper linkage and damper motors shall be fixed prior to tuning up if found non-functioning.)

5 Add DCV control to unit w/ existing economizer Add-on DVC control, CO2 sensor, controller where necessary, and O/A sensor. Economizer must be operational and tuned up. Assumes existing thermostat is functioning and no new thermostat is needed. (Damaged dampers, damper linkage and damper motors shall be fixed prior to tuning up if found non-functioning.)

6 Perform all controls and tune up measures listed in 3,4 and 5

Add-on DVC control, CO2 sensor, controller where necessary, and O/A sensor, and new programmable thermostat. Economizer must be operational and tuned up. (Damaged dampers, damper linkage and damper motors shall be fixed prior to tuning up if found non-functioning.)

Page 11: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

PNW Collaboration/Advocacy

Page 12: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Open Collaboration/Advocacy

Page 13: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

What’s Wrong & Right with this Picture?

Controller W5469 - OLD

Damper Actuator

Whiz Bang Digital Sensor – C7660

Does snap disc input rush current[ >20mA] burn out the motor prematurely?

Whiz Bang Controller -W7220 - NEW

Page 14: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Outside Air Sensor Enclosure

Page 15: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

• Advanced Rooftop Unit (CA PIER + 3ET)

• Publish performance curves

• Snap disc replacement

• Outside air sensor enclosure/placement

• Climate optimized RTU standards

• RTU FDD w/remote comm -CA Title 24

• Rethink/Redesign – Proctor Engineering Group

Collaboration/Advocacy

Page 16: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Package Unit Standard

Page 17: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Package unit as received

Page 18: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

HDAC Package Modifications

Page 19: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Package unit blower revisions(not final evaporator coil or coil location)

Page 20: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

• Labels on the suction, discharge, and liquid lines (for multiple compressors units)

• A high-pressure refrigerant port located on the liquid line; low-pressure refrigerant port located on the suction line

• Pressure plug-in ports accessible from outside of the condenser fan plenum (where compressors located within the condenser fan plenum)

• Controls to adjust the minimum outside air position accessible with air plenum panels in place.

• Tighten the box/dampers: ASHRAE

Advocacy/Collaboration-1

Page 21: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

• The following sensors permanently installed to monitor system operation

• Control system capable of displaying the value of each parameter at the at the unit, and/or t-stat and/or through a remote gateway:

– Refrigerant suction pressure/temperature– Liquid line pressure/temperature– Outside air temperature/air relative humidity– Return air temperature/relative humidity– Supply air temperature/supply air relative humidity– Condenser/evaporator air flow– Economizer performance

Advocacy/Collaboration-2

Page 22: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

CA T24 RTU FDD

Low airflow

Low/High refrigerant charge

Sensor out of range or failed

Compressor short cycling

Economizer not functional/optimized

Performance degradation

Non-occupied operation

Advocacy/Collaboration-3

Page 23: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

Next to the last research steps….

• Draft annualized savings methodology with separate characterizations of annual operation for summer and winter

• Data block interval analysis• Recommendations regarding fan schedule

persistence• Site temperature vs. TMY data• Additional persistence analysis• Billing/signature analysis for selected sites• Measure life implications from the data

Page 24: PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4

• Proposal to the RTF for an annualized savings estimation methodology

• Recommendations to the RTF on RTU-related technical/analytical issues

• Recommendation for an RTU Forum-scope/national?

• Recommendations to NPPC/NEEA/BPA for RTU-related market transformation and technical standards advocacy

• Final report of Phase 4

RTUG Outcomes