Project Summary
• $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area
• Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system
• Funded by the City of Arlington and Gilliam County
• The City of Arlington has a shovel-ready industrial park area with full water and sewer system service
Reservoir Construction
Airport Booster Pump Station Piping
250,000-Gallon Steel Storage Reservoir and Booster Pump Station