8/13/2019 PN Facility Report WEEK 49-2013
1/34
Engineering
Design &Development
SM CENTER LAS PIAS
11 SMPN Weekly Report | 10.26.13
Nov 28 Dec 4, 2013
Prepared by:
Edmar P. Ortillano-RE
Marvin Andro T. Caparros
Reviewed by:
Francis Joseph D. Manalo-OM
Noted By:
Bernabe T. Salazar Jr.-ROM
8/13/2019 PN Facility Report WEEK 49-2013
2/34
Engineering
Design &Development
22
Table of Contents1. General Information
1.1. Photos
1.2. Basic Information1.3. Tenants information
2. Technical reports and updates2.1. Utilities Interruption2.2. Utilities Consumptions
2.2.1. Daily Non-Potable Water Consumption
Monitoring2.3. Equipment updates2.3.1. Genset2.3.2. AHUs
2.3.3. Cooling tower2.3.4. Chillers
2.3.5. Elevators/Escalators repair2.3.6. FDAS Maintenance2.3.7. Major job done with in the week
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
3/34
Engineering
Design &Development
33
Table of Contents2.4 Lightings
2.4.1 Mall Lightings2.4.2 Logos
2.4.2.1 SM Logos
2.4.2.2 Tenants Logos2.5 Rest rooms2.6 Water leaks
2.6.1 Photo of the roof2.6.2 Weather
3. Materials Withdrawals Monitoring3.1. Materials requested within the week3.2. Materials withdrawn within the week
4. RFW
5. SMR6. Issues and needs list
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
4/34
EngineeringDesign &Development
4
1. General Information
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
5/34
EngineeringDesign &Development
5
1.1. Photo and Basic Information
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
6/34
EngineeringDesign &Development
6
1.2. Basic Information
! Leasable area- 16,308.54 sq. m.! Common area- 40,267 sq. m.! Percentage of leasable from common area- 40.50%
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
7/34
EngineeringDesign &Development
7
1.3. Tenants information
!"#$% '$($)# *")+#,-(.)/ *01
!" $% & '&()"% *+, -,
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
8/34
8/13/2019 PN Facility Report WEEK 49-2013
9/34
EngineeringDesign &Development
9
2.1. Utilities interruptions
2.%3.4+5#$#-+ 67"89 :; KLMJNO P/562;P6/2 Q/2218;42
C3/D1-@12 ))( )&$EF G42 @=/012 87-8 E HIJ. 87==1B /76 @> KLMJNO P/562;P6/2 Q/2
218;42
37-@12* /Q GGO& &
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
10/34
EngineeringDesign &Development
10
2.2. Utilities Consumptions
2.%3.4+5#$#-+ 67"8 :; /Q W. KX]1=6 ]21;A12
1J2 VH01
1J2 VH0N
3/D, )!()&$E
/A /A /A /A /A /A /A 5^;
1J2 E501J2 G50
Y1P, E()&$E
/A /A /A /A /A /A /A 5^;
1J2 =50
1J2 @H0
Y1P, '()&$E
/A /A /A /A /A /A /A 5^;
! Cleaning
8/13/2019 PN Facility Report WEEK 49-2013
14/34
EngineeringDesign &Development
SMPN Weekly Report | 10.26.1314
2.3.3. AHUs (Major works/activities)! No major activities done within the week.
8/13/2019 PN Facility Report WEEK 49-2013
15/34
EngineeringDesign &Development
15
2.3.4. Cooling Tower! No work done within the week
SMPN Weekly Report | 10.26.13
8/13/2019 PN Facility Report WEEK 49-2013
16/34
EngineeringDesign &Development
SMPN Weekly Report | 10.26.1316
2.3.5. Chiller! No work done within the week.
8/13/2019 PN Facility Report WEEK 49-2013
17/34
EngineeringDesign &Development
17
2.3.6. Elevator/Escalator
!"#$%7")