PMT Support Structure. STATUS. Enrique Calvo Alamillo Chooz - 26 June 2008
19

PMT Support Structure. STATUS.

Jan 08, 2016

Download

Documents

edita

PMT Support Structure. STATUS. Enrique Calvo Alamillo Chooz - 26 June 2008. INDEX:. Gamma-catcher and target vessel tools manufacture. Final PMT distribution in the detector. Final design of PMT supports. Mechanical devices to machine/weld the different fixation points on the buffer. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PMT Support Structure. STATUS.

PMT Support Structure.STATUS.

Enrique Calvo Alamillo

Chooz - 26 June 2008

Page 2: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 2

INDEX:

1.1. Gamma-catcher and target vessel tools manufacture. Gamma-catcher and target vessel tools manufacture.

2.2. Final PMT distribution in the detector.Final PMT distribution in the detector.

3.3. Final design of PMT supports.Final design of PMT supports.

4.4. Mechanical devices to machine/weld the different Mechanical devices to machine/weld the different fixation points on the buffer.fixation points on the buffer.

5.5. Status of acrylics and stainless steel production.Status of acrylics and stainless steel production.

6.6. Schedule of supports production, treatment, cleaning Schedule of supports production, treatment, cleaning and delivery.and delivery.

7.7. Next Steps.Next Steps.

Page 3: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 3

1.1. Gamma-catcher and target vessel tools manufacturing. Gamma-catcher and target vessel tools manufacturing. (built at CIEMAT workshop(built at CIEMAT workshop)) At Madrid 4 different kind of tools were built following the drawing supplied by Saclay.

All tools were sent to Saclay: To produce those we had 3 people working full time during several months .

•One tool unit for the gamma catcher and two rotation units.

•Three tool units for the target.

•One tool unit for the transport.

Page 4: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 4

2.2. Final PMT distribution in the detector.Final PMT distribution in the detector.

This is the last approved distribution. That was simulated by Glenn.

The positioning precision of the PMTs will be approximately +- 1 cm and +- 1º.

The orientation of the PMTs on the lids is towards the center. On the cylinder PMT are not pointing to the center.

Page 5: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 5

3.3. Final design of PMT Support Structure.Final design of PMT Support Structure.

This is the last approved PMT assembly.

Composed for 1.4 kg of Acrylic and 1.1 kg of magnetic shielding.

•PMT Assembly.

Total weight of different material on the detector is aprox:-Acrylic………………….541 kg. Inox screws………………….20 kg.-Magnetic shielding……440 kg. Nylon 6.6 screws……………25 kg.-Inox 304 L……………..459 kg. Nylon clamp………………….15 kg.

Page 6: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 6

•PMT Support Structure.

Sector of PMTs distribution on the buffer.Shown the Detector axis directions, respect of the center.

•X toward the exit of the cavern. (Longitudinal axis of the cavern)•Y transversal axis of the cavern.•Z vertical axis.

Page 7: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 7

PMTs distribution on the top LID.

Page 8: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 8

PMTs distribution on the cylindrical buffer sector.

Z

Yx

Z

Page 9: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 9

PMTs distribution on the bottom LID.

Page 10: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 10

Top and lateral view of one of six sectors.

X

Y

Page 11: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 11

•Top and Bottom fixation structure on the buffer lids.

This structure is composed by 2 central rings and 3 sector of circles. Attached to some pieces welded to the buffer wall.

The PMTs are fixed to this structure by 2 M6 screws on each side.

Page 12: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 12

•Cylindrical fixation structure on the buffer.This structure is composed by 30 circumferential sectors of two independent vertical L profiles, distributed on 3 vertical step. Those are attached to the buffer circumferential reinforces by M6 holes on both extremes of the profile.

The PMTs are fixed on the L profiles by 2 M6 screws on each side.

Page 13: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 13

4.4. Mechanical devices to machine/weld the different fixation points on the buffer.Mechanical devices to machine/weld the different fixation points on the buffer.

•Tool to drill the holes on the cylindrical buffer wall.

This will allow to drill the holes on the buffer wall to fix the vertical L profiles within the needed tolerance.

•Tool to weld the pieces on the Lids.

Will allow to position the pieces to be welded, to mount the rings and circular sectors on.

Both tools was sent to Saclay.

To weld the pieces on top or bottom it is necessary change 6 pieces on the second ring.

Top

Bottom

Page 14: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 14

5. Status of acrylics and stainless steel production.5. Status of acrylics and stainless steel production.

•The acrylic pieces:

The 7 different kind of acrylic pieces production is well advanced. The 7 different kind of acrylic pieces production is well advanced.

840 to build.840 to build.Built 560Built 560Cleaned 327Cleaned 327

1640 to build.1640 to build.Built 1359Built 1359Cleaned 1343Cleaned 1343

840 to build.840 to build.Built 834Built 834Cleaned 831Cleaned 831

1640 to build.1640 to build.Built 1376Built 1376Cleaned 866Cleaned 866

420 to build.420 to build.Built 419Built 419Cleaned 415Cleaned 415

1680 to build.1680 to build.Built 855Built 855Cleaned 849Cleaned 849

420 to build.420 to build.Built 278Built 278Cleaned 137Cleaned 137

To build those we have 11 people working full time from 3 moths and 4 to clean the pieces.

Page 15: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 15

•The Inox pieces:

There are 17 different inox pieces to produce. The fabrication is under progress.There are 17 different inox pieces to produce. The fabrication is under progress.

6 to build (top).6 to build (top).

60 to build.60 to build. 60 to build.60 to build.

48 to build.48 to build.36 to build.36 to build.

12 to build (bottom).12 to build (bottom).

60 to build.60 to build. 60 to build.60 to build. 30 to build.30 to build.

6 to build (bottom)6 to build (bottom)..

12 to build (top).12 to build (top).

Page 16: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 16

•The support structure:

There are 16 different inox pieces to produce. The fabrication is under progress.There are 16 different inox pieces to produce. The fabrication is under progress.

65+65 to build.65+65 to build.

32+32 to build.32+32 to build.

•On cylinder Buffer

Page 17: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 17

1 assemblies to build (top).1 assemblies to build (top).

12 assemblies to build.12 assemblies to build.

126 to build.126 to build.140 built.140 built.

•On lids Buffer

1 assemblies to build (bottom).1 assemblies to build (bottom).

6 to build.6 to build.

Page 18: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 18

6. 6. Schedule of supports production, treatment, cleaning and delivery.Schedule of supports production, treatment, cleaning and delivery.

•The acrylic pieces:

•The Inox pieces:

•The support structure:

All acrylic pieces that compound the PMT assembly will be ready to be delivered to Heidelberg during July.

All inox pieces to fix the PMT assembly to the support structure will be ready to be delivered to Chooz during September.

All inox support pieces will be ready to be delivered to Chooz during September.Except the pieces to weld on the buffer that were delivered to Saclay.

Page 19: PMT Support Structure. STATUS.

Double-Chooz Collaboration meeting (Chooz) 19

7.7. Next Steps. Next Steps.

•Include the magnetic probes and Led-fibers on the 3D models. The installation of those devices and cables/OF should be integrated on the installation of the buffer PMTs and installed at the same time.

•Include on the 3D the different orientations of the PMT cables exit.

•Update the TDR with the new PMT distribution and final PMT support

•Update TDR with the assembly procedure for the PMTs support/assembly pieces.

•Detailed installation process of the PMTs on the buffer.

•Define the tooling necessary for those Jobs.

•Define space, time and man-power requirements to do previous tasks .