PMH Employee Forums April 2, 2014
Dec 23, 2015
PMH Employee Forums
April 2, 2014
Patient Story
QUALITY
• CORE MEASURES – “Perfect Scores”–Quarter 1 and 2, 2013 - 100%–Quarter 3, 2013 - 91.5% –Quarter 4, 2013 – 84%
• Immunizations = 94%• VTE = 90%• Evaluation of Ejection Fraction for HF – 88%
2014 Pillar GoalsPeople
Move planning for new
hospital - by year end each
dept will submit a plan
Reduce FT/PT
employee turnover:
Goal <=10% Started=11%YTD = 4.3%
Reduce FT/PT terms <1 yr : Goal <=17% Started=18%.
YTD = 6.1%
Service
ED: Coordination of care dimension
Goal =82% (90th %tile)2/14 = 71.6%
Patient satisfaction:In Patient: Coord of Care
Goal =73% 2/14 57.7
Operating Room: Continuity of Care: Goal = 91%
2/14 =83.3%Physical Comfort: Continuity of
Care: Goal =93%2/14 = 100%
Lab: Respect for patient preferences: Goal =94%
2/14 = 93.8%Coord.of Care: goal = 89%
2/14 = 100%Diagnostic Imaging: Coord.of
Care Goal = 89%Started =62.5%
Clinics: Info and Educ: Goal=97%2/14 = 92.3%
Access to Care: Goal = 84%2/14 = 70.8%
Coord. of Care = Goal =97% 2/14 = 76.9%
Quality
Achieve 100% on core
measures
Reduce patient falls
from .48/100 to .32/100
patient days
Improve hand hygiene to
95% Started 92%
2/14 92%
Introduce LEAN concept and training: Complete 4 projects in
2014
Finance
Improve current ratio from 1.5 to
2.25 excluding LOC
Feb = 2.55
Achieve operating
margin of 3%Feb = -0.59%
Achieve a positive cash
flow budget for 2014
Met – must acheive
Improve days cash on hand to CAH median of
17Start = 2Feb = 25
Identify $500,000 of new cash
opportunitiesFeb = $100K in 340B, $200K BCBS terms,
$200K Premier savings
Growth
Increase acute care census to 8 patients per day on acute
and ICUAs of
2/14=6.12
Increase swing bed ADC from
TBD to 1.85 (avg. for yr.)2/14 = 0.78
Increase outpatient clinic visits (PMFC and
Urgent Care)10%
Add specialty line of derm,
ortho, cardiology
Recruit addt'l family practice,
internal medicine
Increase surgical volume by 1.5%2/14 up 0.329%
Community
Continue to maintain
tracking of community
benefits.
Implement Community
Health Needs Assessment
Utilize speakers bureau at
least 12 times in 2014.
FinanceFINANCE Actual
PMH PMMG Foundation TotalGross Charges 44,359,434 449,988 - 44,809,422
Deductions (18,897,461) (182,255) - (19,079,716)Net Patient Revenues 25,461,973 267,733 - 25,729,706
Other Operating Revenues 296,348 33,145 260,860 590,353 Total Net Operating Revenue 25,758,321 300,878 260,860 26,320,059
Operating ExpensesSalaries and Wages 11,631,579 345,758 - 11,977,337 Employee Benefits 3,037,263 69,934 - 3,107,197 Purchased Services and Professional Fees 2,957,820 41,057 45,448 3,044,325 Medical Supplies 2,472,423 12,805 - 2,485,228
Depreciation 806,771 36,125 - 842,896 All Other 4,107,800 60,823 59,065 4,227,688 Total Operating Expenses 25,013,656 566,502 104,513 25,684,671
Net Income (loss) from Operations 744,665 (265,624) 156,347 635,388
Non operating revenue (expense) 80,506 - 26,578 107,084
Medicare EH R Incentive 155,585 - - 155,585
Medicaid EH R Incentive 84,228 - 84,228
Excess revenue over (under) Expenses 1,064,984 (265,624) 182,925 982,285
Affiliation Update
• Affiliation complete and effective February 28• This includes the construction loan financing of
$38.5mm w/ WesBanco• Business planning with MHS will begin this
month• We will be planning joint branding strategies
too • Of note, we will have 2 people representing
PMH on Mon Health System Board
New Hospital UpdateMilestone Description Start/Original Date Start Act/Proj Date • Mobilization 9/23/2013 9/23/2013 • Site Clearing 10/7/2013 10/7/2013 • Subgrade Main Drive 10/28/2013 10/21/2013 • Foundations 11/6/2013 11/11/2013 • Site Utilities 12/2/2013 11/11/2013 • Structure 12/19/2013 1/2/2014 • Roof Concrete 2/17/2014 3/17/2014 • Slab on Grade 1/17/2014 3/18/2014• Building Exterior 1/17/2014 1/30/2014 • Building Dry 6/2/2014 6/13/2014 • Partitions 5/15/2014 5/16/2014 • Owner Furnished Equipment 10/3/2014 10/6/2014 • Site Paving 9/1/2014 9/1/2014 • Testing and Balancing 10/31/2014 10/31/2014 • Punch-list 11/28/2014 12/26/2015 • Substantial Completion 1/26/2015 1/26/2015
New Hospital Update• Department furniture planning meetings will start on April 17th with
vendor• Contract awards for construction work 98% complete• Lost about 32 days work due to weather conditions
Major items and % completion at the end of February:– Site work about 65% – Steel 80%– Structural concrete 40%– HVAC plumbing 5%– Electrical 9%– Exterior veneer 13%
No Smoking Campus
• Our current policy applies to new location
• Campus is much larger, so it will not allow for breaks to leave campus
• Encourage employees to take advantage of Smoking Cessation opportunities being offered
Smoking Cessation
• Newsletter based program being offered every quarter (8 weeks long). Next class to begin next week. Sign up sheet being circulated or contact Dennis Lusin [email protected]
• Dr. Conley has agreed to order nicotine replacement for those enrolled in the program through Employee Health.
Thank You
• To Marsha Engman, Patient Access Specialist, who spent hours on her day off, on a Saturday to clean up cigarette butts on the adjacent city playground.
• Remember
Cigarette Butts are Litter
This slide contained a short video. For space, this video was eliminated from this slide show.
Stellar Ideas - What is it?
• Harvest staff ideas• Tap into creativity• Serve patients & each other better• Idea generation & implementation• Move PMH from Good to STELLAR!
Why?
• Stellar Ideas result in:– Improved clinical outcomes– Increased efficiency– Greater employee involvement– Increased satisfaction scores– Increased employee retention– Increased profitability
Examples
• Let’s use grit for more traction in the parking lot in the winter
• Save steps in Clinic A – placed a centrifuge there rather than running to lab
• Asking a Dental Clinic if they would send biopsies to the hospital’s lab
Who is eligible?
• All employees, including Directors• Administrative staff are excluded from the
program
Where to submit ideas:
• On the PMH Website• On paper – Stellar idea boxes by
Communicator Boards on each floor
How to submit ideas:
• On the PMH Website– Go to the Careers tab– Select Employees Only– User Name: [email protected]– Password: Preston
Information To Be Included:– Idea description– Pillar of Excellence affected– Cost savings (if any)– Date– Contributor(s) & department(s)
• Ideas may cover any area or department of the hospital, not just the person’s own department.
What happens to ideas?
• Submissions are received by the Ideas Evaluation Team (Kim Colebank, Melissa Conaway, Linda Flemmer)
• Categorized:– Possible implementation– Not possible– Not appropriate for this forum
What happens to ideas?
• Submissions are forwarded to a department manager for feedback on implementation – 1 week turn around
• Evaluation Team notifies the employee of the status of their idea within 30 days.
What happens to ideas?
• An idea may be:– Accepted & implemented– Accepted with a time frame for implementation– Closed – the idea cannot be implemented & the
reason why– Submitter may be contacted for more information
as the idea is evaluated– Referred to another leader for review
Recognition
• Award winners are recognized at department meetings
• Winners may receive different levels of awards– $3 cafeteria card– Choice of PMH Gear– Cash award at year end if there is significant
savings as a result of the idea
Recognition
• Quarterly, PIC selects the top idea submission for a “one time” extra vacation day
• Implemented ideas recognized on the Constellations Bulletin Board on the first floor
• Top Quarterly winners are recognized at the annual Employee Appreciation Banquet
Breakout Groups
• Form groups of 4-6 people.• Identify at least one Stellar Idea per person.• What are barriers to implementation?• How would you overcome these?• Prepare to discuss these in 15 minutes.