GREEN SMART HOUSE PROJECT A sustainable home created using environmentally responsible ideas and materials” – Housing Industry Association (HIA), Aus. Introduction & Background
36
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Slide 1

GREEN SMART HOUSE ProjectA sustainable home created using environmentally responsible ideas and materials Housing Industry Association (HIA), Aus.Introduction & BackgroundSmart Integrating electrical devices in a house with each other, connected through home network or personal gadgets. e.g. houseplant and yard watering, HVAC (heating, ventilation, air-conditioning), security locks, etc.

Green Energy efficient Reduces wastage

Objective:

Criteria of green smart house:

Enhance Water & Energy EfficiencyImprove Indoor Temperature ControlUpgrade The Security SystemsMeet the requirement of ISO 14001

To improve inhabitant experienceTighten up the security system to ensure safetyPreserve environments and promote go-green activities

Related projectsthis will enable households to achieve as much as 30 per cent savings in energy bills- Martin Manniche, Chairman and Chief Technology Officer, GreenWaveReality, Sg.

Methodology

Data Analysis & CollectionConcept LayoutDesign & Project SchedulingAssess Resources AvailabilityTesting & Evaluating PrototypeImplementationIf FailSTEP 1STEP 2STEP 3STEP 4STEP 5STEP 6Literature Review

ExteriorSolar Panel using Photovoltaic (PV) solar cell system.converts light from the sun directly into electricity Used for: rooftop shingles, roof tiles, building facades, or the glazing for skylights or atria.

Smart Windows/Smart Glass Using electrochromics to change light transmittance, transparency or shading of windows in response to a stimulus such as sunlight, temperature.has "memory" and does not need constant voltage to maintain the tinting saves electricity.

Interior All-in-one lighting, heating & security systems by Neoji

Reconstructs 3D image of the house using an array of sensors to detect sound, motion, humidity and temperature. HD camera installed allows you to survey your living room via the Neoji mobile app.Safety features: motion sensor, adaptable to daily sounds so that it detects anomalous activities and alerts residents via Neoji mobile app. Heating and Lighting: automatically monitors and controls heating and lighting at home.

Interior (cont)Water filter system

Collection screening bio-treatment

UltrafiltrateUV disinfectionChlorinationStorage

Energy Efficient Homes by MasersEnergy

Built-in sensors enable monitoring and balancing loads, so that it reacts instantly to change in energy demand.Project Scheduling

Work breakdown structure(WBS)

Budgeting

Budget Allocation for Direct CostsExpenditureSupplierQuantity Amount in RMJustificationPERSONNELResearch Team-3 person6 800All personnel hired are in charge of research project implementation Computer Programmer1 person2 500Supervisor1 person4 500Labour Cost5 person8 750

ExpenditureSupplierQuantity Amount in RMJustificationMATERIALS (inclusive of installation cost and maintenance fees)Solar Photovoltaic System (4kWp)(inclusive of inverter, charge controller and battery storage)Solar Naturally162 000Convert solar energy to electrical energy; act as a power supply for home usageWater Filtration Device(inclusive of 35% freight charges, pump, and a 100L storage tank)AquaCell Greywater126 500Reuses gray water to save water usageSecurity System(inclusive of 35% freight charges)Xandem1 set4 400Increase home securityPhotochromic Smart Window FilmsChameleon15 rolls5 000Prevents harmful light from enteringWireless Motion Sensor(inclusive of 35% freight charges)Insteon8 pieces3 600Smart sensor that operates home appliance via presence detectionExpenditureSupplierQuantity Amount in RMJustificationOTHER DIRECT COSTSAirfare and airport charges from MAS to US-2 trips6 180Business negotiation overseasCar rental per day-2 340Petrol and toll cost 1 000-

Consulting services3 500Communication costs300Mail and courier 200Budget Allocation for Indirect CostsExpenditureSupplierQuantity Amount in RMJustificationINDIRECT COSTSAccounting Services--2 500Administrative CostsLawyer Fees4 500Conceptual patent fees8 500Charge calculated on a per resident basis for copyright purposes

CostTotal CostDirect CostRM 137 570Indirect CostRM 15 500Grand Total = RM 153 070Expected Results/Profits

CostMaterialsActual Price (RM)Cost Price (RM)Profit (RM)Solar Photovoltaic System49 00062 00013 000Water Filtration Device18 00026 5008 500Security System2 8004 4001 600Photochromic Smart Window Films3 2005 0001 800Wireless Motion Sensor2 0003 6001 600Materials Profit : RM 26 500CostPersonnelFixedVaryingSpending (RM)Receiving (RM)Profit (RM)Research Team6 8008 1601 360Computer Programmer2 500300500Supervisor4 5005 400900Labour cost 8 75010 5001 750Personnel Profit : RM 4 510CostMiscFixedVaryingSpending (RM)Receiving (RM)Loss (RM)Flight tickets6 180-6 180Car rental2 3402 340Petrol/Toll1 0001 000Consultancy3 5003 500Communication300300Mail and courier 200200Accountancy2 5002 500Lawyer fees4 5004 500Patent fees8 500-8 500Maintenance1 200-1 200Misc. Loss : RM 10 820Variable Profit (depends on houses) = Material Profit + Personnel Profit

Fixed Profit (depends of final number of houses) = x * Misc. Loss

Final Profit = Variable Profit + Fixed Profit

Final Profit = x * ( RM 26 500 + RM 4 510 ) - RM 10 820

Final Profit > RM 30 000 (per house basis)

Logistic support &administrative

Logistic supportPersonnel TrainingTransportation ServiceWarehousing & StorageMaintenance Service TeamTechnical & Non-TechnicalAssistance Team

AdministrationMonitoring and Controlling The Project

Watching Workers Performance

Managing Legal Issues

Handling Transportation Issues

Risk identify

Late Delivery of The EquipmentQuality of Equipment Doesnt Meet The ExpectationEquipment FailureProject Run Out of Budget Companys Financial Issues

Risk that will encounter :

Solutions to The Risk encounteredLegal Approaches, e.g. making a contract with the particular supplierLooking For Other Supplier/ Find Experts To Improve Its QualityTechnical & Non-Technical Maintenance Team Are PreparedSchedule The Project Appropriately, e.g. refer to previous projectsDemand The Developer To Pay The Amount Based On Current Completion

Presented byChoo Chee wei lun (project manager)ang swee boonlam mun hohsylvia wong shi weiwai kok poh