Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 Martin Straume, chairman PAF Lead P&A engineer, BP Norge
9

Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

May 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

Plug & Abandonment Forum (PAF)

P&A in the past, present & in the futurePAF Seminar 29 October 2015

Martin Straume, chairman PAFLead P&A engineer, BP Norge

Page 2: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

2

Topics

1. P&A in the past

2. P&A at the present

3. P&A in the future – PAF

4. Future technology - P&A roadmap

5. Summary

Page 3: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

P&A in the pastBest field P&A in Norway

• P&A Frigg with average of 5,3 days/well

• Wells P&A-ed with Mærsk Innovatorduring 2003 (1st campaign) and 2005

(2nd campaign)

• Drilling of these wells finished in 1979

• Wells designed with cemented casing fromcasing shoe to inside previous casing shoe

• Much of the P&A work was to set internalcement plugs

3

Page 4: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

4

P&A at the presentWell design changed at some point at NCS

• Directional wells, Longer wells, HPHT wells

• Primary cementing from casing shoe to 200mabove the casing shoe

• Open annulus from TOC and into previouscasing shoe

• New overburden knowledge may dictatebarriers where no cement is

Page 5: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

5

Knowing our overburden

• Today, we have better technology and tools to map the overburden sealscompared to the past

• Therefore - well design today could include annulus barriers in new wells where seals need to be at the time of P&A – some time in the future

• Some North Sea fields have swelling shales which seal after being drilledthrough. If they swell, or can be promoted to swell, new well design could plan for shale barrier at P&A time. Cap rock……………..

• Include P&A barrier schematics in drilling program

• Aim for P&A to become installation of internal barriers

• Think ”Cradle - to – Grave” when constructing new wells

Page 6: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

6

• With external casing barriers in place,……

• Wireline and coiled tubing can log,

set bridge plugs, set cement plugs, etc..

• Possible to cement A-annulus through tubing

• If we only could log 2 strings….…missing link

• Could delay rig P&A to the 13 3/8” shoe

• Rigless P&A has well control equipm. in place

• Rigless P&A gives flexibility in timing for P&A

P&A in the futureRigless P&A ?

Page 7: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

7

Plug & Abandonment – Technology

• Conventional P&A – yes• What’s new?• Shale Barriers• Perf – Wash – Cement technology

Page 8: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

Roadmap for New P&A Technologies

8

Optimize Perf Wash & Cement

Optimize Milling

Rigless P&A- High Capacity CT System- High Energy Solutions

(Melt/Burn)/Extreme Concept

Alternatives to cement- Creeping shale / Formation

effects- Sand/Rock/Natural

materials- Chemical materials- Steel

Improved Verification / Logging methods

Wireless technology(subsea wellheads)

Tubing left in hole

Ctrl line left in hole

Dual string: Cement bond logging Perf, Wash & Cement, Milling

Well Intervention technologyfor P&A

Tender Support P&A rigs/Modular Rigs

LIV CT Pilothole drilling/cementing

Rig/Process optimization

Drill Pipe Coil Tubing Through Tubing Wireline Rigless

2015 2016 2017 2018

Focus areas for 2015 - 2016 Futuristic Technologies

Page 9: Plug & Abandonment Forum (PAF) - Norsk olje og gass · Plug & Abandonment Forum (PAF) P&A in the past, present & in the future PAF Seminar 29 October 2015 ... •Wireline and coiled

9

Summary

1. Cradle to Grave well design. Design new wells to let P&A become internal barriers the next 40 yrs.

2. Make use of mother earth if possible (shale swelling). Best long term testedbarrier ever.

3. Key missing technology is logging through 2 strings.Verification of external barriers.

4. Potential to leave tubing in the hole.

5. More scope to rigless P&A could enable more flexibility around when rig P&A takes place.

6. Rigless P&A through X-mas tree keeps well control equipment in place.

7. P&A needs new technology to place quality barriers at reduced time and cost. Win – win for the industry and the nation.