Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week October 2008)
5

PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

May 30, 2018

Download

Documents

nguyentu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues

PLTMH AIH NUSO

BUMDes “ATU PECATUREN”

(commissioned second week October 2008)

Page 2: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

IBEKA

Page 3: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

“PUTRI BETUNG”

ELECTRIFICATION

DEVELOPMENT PLAN

> 3500 KW hydro power potentials

> +/- 35 km MV power line infrastructure

JAMUR GELE

40 kW

AIH NUSO

2 X 250 kW

AIH KAIS

3 X 500 kW

MARPUNGE

2 X 200 kW

GURAH

3 X 500 kW

+ 10 km underground to local grid

Page 4: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

> Touch screen operated> Real time monitor> Remote control

SISTIM KONTROL “PARIKESIT”Pengontrol Aliran Dijital Kemampuan Sistim Terbangkit

MHP HMI (Micro-mini hydro Human Machine Interface)