YUSNIAR ULLY A DESIGN RISK OF GENERATOR GENYEM HYDRO POWERPLANT PROJECT
23

plta genyem jusey

Nov 12, 2014

Download

Documents

tyast
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: plta genyem jusey

YUSNIAR ULLY A

DESIGN RISK OF

GENERATOR GENYEM HYDRO POWERPLANT PROJECT

Page 2: plta genyem jusey

ELECTRICITY PATH IN HYDROPOWERPLANT

Page 3: plta genyem jusey

Used for Generated Electricity

Used for Increased Voltage

Used for Transmitted

Electricity

Used for DecreaseVoltage

Page 4: plta genyem jusey

HOW HYDRO PLANT WORK

Page 5: plta genyem jusey

HOW HYDRO PLANT WORK

Page 6: plta genyem jusey

GENERATOR_________________

Generator is an electrical equipment which is used to

change the primer energy (water) into

electrical energy

Page 7: plta genyem jusey

GENERATOR DIAGRAM

(1)The powerhouse(2) The exciter(3)The rotor (4) The stator (5)The main thrust

bearing on the shaft (6)The wicket gates (7)The turbine

Page 8: plta genyem jusey

CONSTRUCTION OF GENERATOR

Page 9: plta genyem jusey

COMPONENT OF GENERATOR

Page 10: plta genyem jusey

Diagram Work Of Generator

Page 11: plta genyem jusey

GENERATOR EFFICIENCY

Generator Efficiency is ratio between power output and power . Efficiency can be written as :

Page 12: plta genyem jusey

LOSSES TYPE

1COPPE

R LOSSE

S

2IRON LOSS

ES

1HYSTER

ESIS LOSSES

2EDDY

CURRENT LOSSES

Page 13: plta genyem jusey

LOSSES IN GENERATOR

Copper Losses is the power lost in the form of heat in the armature winding of a generator

Iron Losses is the power lost in the form of heat in iron core of a generator

Iron Losses divide into : 1.Hysteresis Losses is a heat loss caused

by the magnetic properties of iron core2. Eddy Current Losses is a heat loss

caused by current conductor of iron core

Page 14: plta genyem jusey

RISK MANAGEMENT FLOWCHART

Risk Identificatio

n

Risk Responding

Risk Management Planning

Risk Analysis

Risk acceptable

New Risks

Risk Monitoring

and Control

yes

yes

no

no

Page 15: plta genyem jusey

INADEQUATE DATA SUPPORTING

HAZARD

CAUSED

DESIGN FAILURE

RISK IDENTIFICATION

INAPPROPRIATE TOOLS ANALYSIS

LOW SKILL RESOURCES AND FACILITIES

INAPPROPRIATE PUIL

Page 16: plta genyem jusey

RISK ANALYSIS

Page 17: plta genyem jusey

RISK ANALYSIS

PREVENTIVE Provide Adequate Pre-

Design Data Provide Experience People

which expert to design generator Provide Design appropriate

with Owner request Follow the PUIL

Page 18: plta genyem jusey

RISK ANALYSIS

preventive

Page 19: plta genyem jusey

RISK ANALYSIS

MITIGATION Hire expert design

consultant Re analysis using several

software to compare the result Design Insurance

Page 20: plta genyem jusey

RISK ANALYSISRISK ANALYSIS

mitigation

Page 21: plta genyem jusey

THANKYOU

Page 22: plta genyem jusey
Page 23: plta genyem jusey

RISK ANALYSIS

preventive