Pohang Accelerator Laboratory POSTECH EPICS collaboration meeting on 6~7 October 2005 Pohang Accelerator Laboratory Kiman Ha, J.H Kim [email protected] PLS Corrector PS Upgrade and Orbit measurement using DBPM
20

PLS Corrector PS Upgrade and Orbit measurement using DBPM - … · 2006. 6. 23. · Local Ethernet HUB 3COM-24Port H V Corrector PS Controller Bergoz BPM Module EPICS OPIs MVME5110

Feb 12, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Pohang Accelerator LaboratoryPOSTECH

    EPICS collaboration meeting on 6~7 October 2005

    Pohang Accelerator Laboratory

    Kiman Ha, J.H [email protected]

    PLS Corrector PS Upgrade and Orbit measurement using DBPM

  • Pohang Accelerator LaboratoryPOSTECHEPICS Collaboration Meeting 2005

    Outline

    -Status of Digital Corrector power supplies hardware-Status of PS control system-Data measurements-Orbit measurements using Libera tryout DBPM-Summary

  • Pohang Accelerator LaboratoryPOSTECH

    Goals of orbit feedback

    -Storage ring : 2.5 GeV 180 mA

    -Orbit feedback operation using digital power supplies -Orbit stability with feedback (RMS)

    - Short term (1 hour) : < 1 μm- Long term (12 hours) : < 3 μm

    -Total 70 sets V type replaced and 32 V correction PS’s are involved for orbit feedback

    -98 BPMs used for beam position measurement

  • Pohang Accelerator LaboratoryPOSTECH

    Present PS upgrade status

    -PS Upgrade statusAugust and September 2005, 70 vertical PS were

    replaced to new digital controlled typeSeptember 2005, Hardware and Control system

    CommissioningSeptember 28 2005, User run startingTotal budget : 650,000$ (Not include Control System)

    -DBPMNovember 2003, Installed DBPM-2 from I-Tech August 2005, One of DBPM Libera tryout version

    installed for TBT, damping time, RMS and MEAN orbit data measurement

  • Pohang Accelerator LaboratoryPOSTECH

    Analog- Digital-Converter

    2 ADC,16 Bit, 50 kHz

    4 ADC, 12 Bit

    2 DAC for debugging

    DSP-controller incl. FPGA

    6 Bit Digital Out

    8 bit Digital Input

    1 RS232

    1 Fiber optics

    Euro card size

    Shark DSP

    Shark links on backplane

    Digital Control Unit from DIAMOND

    - Originally developed by PSI EE group- DIAMOND has full-license

  • Pohang Accelerator LaboratoryPOSTECH

    Installed PS in Shed #1 and Inside view

    VME IOC CrateBergoz BPM

    Optical fiber for EPICS interface

    DCCT &IO interface board

    1

    2

    3

    4

    5

    6

    VMIC-3122EVRVIPC664

    MVME5110-400 MHz

    Digital PS and Control Rack

  • Pohang Accelerator LaboratoryPOSTECH

    Power Supplies IOCs

    Control Network

    SBC ADC EVR

    #1 VME based IOC

    Same configurations #2 to #12 IOC

    W/S PC Windoswor LINUX

    SBC: MVME5110-400 MHzADC:VMIVME-3122

    6

    1 1

    B

    2

    x

    1 x

    4x

    x

    1x

    Ern

    e

    A

    2

    x

    8

    2

    x

    x

    1 x

    x

    1 x

    5

    7

    1

    Local Ethernet HUB 3COM-24Port

    H V

    Corrector PSController

    Bergoz BPM Module

    EPICS OPIs

    MVME5110

    +-10V analogX,Y,AGC

    Event GeneratorRF 500.082MHzAC 60Hz

    Clock and Triggerto BPM, CMPS, ADC

    2KHz ~ 40KHz

    2’nd Ethernet port

    Fiber optics

    VIPC664-TM

    Digtal PS

    vxWorks 5.5.1base 3.13.9CPU load 48% ~ 52%PS scan rate : 0.1 secADC 32CH : 0.01 sec

    IOC internals:

    Fiber

  • Pohang Accelerator LaboratoryPOSTECH

    IOC and PS configuration

    VMECPU

    Carrier module TM module

    PSIP-A

    IP-B

    IP-C

    IP-D

    Optical fiber link

    MVME5110

    VIPC664-TM

    Event trigger

    CH1

    CH2

    PSPS 8PS 8

    PS 2PS 2

    EVR

  • Pohang Accelerator LaboratoryPOSTECH

    Control hardware

    TM

    Fiber I/O port

    Industry Pack Carrier VME64x 4 slot boardsGreenspring

    Vipc664Hytec 8002

    Industry Pack Module for 2 power supplies

    VME64x Transition modulefor 8 power supplies

  • Pohang Accelerator LaboratoryPOSTECH

    Web monitoring

    10 min

    4 days

    -PPC linux

    -mySQL

    -GUNPLOT

  • Pohang Accelerator LaboratoryPOSTECH

    DPS Feedback operations - 1

    V*10 is Amps

    Beam current

    Digital SettingADC input Readback

    Current setting and ADC input readback by feedback operation40 Hours

    Beam dump

  • Pohang Accelerator LaboratoryPOSTECH

    Step response test

    55.0A55.0001

    55.0002

    +55.0003

    55.000555.0004

    55.0A

    Step response @55(A), 100uA step(1ppm)

    1ppm @ full range

    V*10 is Amps

  • Pohang Accelerator LaboratoryPOSTECH

    DPS Feedback operations - 2

    Operating output currents of vertical corrector

    0 1000 2000 3000 4000 5000 6000 7000 800075.9

    75.91

    75.92

    75.93

    75.94

    75.95

    75.96

    75.97

    P oint

    [A]

    P 08C V 1

    Current setting and DCCT output readback by feedback operation

    SETTING

    READBACK

    0 1000 2000 3000 4000 5000 6000 7000 8000-23 .94

    -23 .93

    -23 .92

    -23 .91

    -23 .9

    -23 .89

    -23 .88

    P o in t

    [A]

    P 0 8 C V 2

    SETTING

    READBACK

    Delta is offset

  • Pohang Accelerator LaboratoryPOSTECH

    Timing of DBPM for data sampling

    =1.068 MHz

    A,B,C,D

    Ethernet

    sf

    0 1000 2000 3000 4000 5000 6000 7000 80002.675

    2.68

    2.685

    2.69

    2.695

    2.7

    2.705

    2.71

    2.715Y Position (TBT, 10kHz)

    point

    mm

    Yrms-TBT= 0.0039583um y mean y stdYrms-10kHz= 0.0031294um

  • Pohang Accelerator LaboratoryPOSTECH

    Turn by turn data measurement

    0 1000 2000 3000 4000 5000 6000 7000 80002.675

    2.68

    2.685

    2.69

    2.695

    2.7

    2.705

    2.71

    2.715Y Position (TBT, 10kHz)

    point

    mm

    Yrms-TBT= 0.0039583um y mean y stdYrms-10kHz= 0.0031294um

    FIR filter TBT to 50 kHz

    Upper: TBT data,Lower: Filtered data

    1000 2000 3000 4000 5000 6000 7000 8000

    2.305

    2.31

    2.315

    2.32

    2.325

    2.33

    2.335

    2.34

    2.345Y Position

    [us]

    [mm

    ]

    TBT(1:8192,3:4)(:,1)FIR 50 kHz(1:8192,3:4)(:,2)

  • Pohang Accelerator LaboratoryPOSTECH

    Damping time measurement

    500 1000 1500 2000 2500 3000 3500 4000 4500 5000

    2.7

    2.8

    2.9

    3

    3.1

    3.2

    3.3

    3.4

    3.5

    3.6

    [us]

    [mm

    ]

    X position damping time

    500 1000 1500 2000 2500 3000 3500 4000 4500 50000

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4Y position damping time

    [us]

    [mm

    ]

    1ms

    Injection

    [mm]

    [mm]

    [us]

  • Pohang Accelerator LaboratoryPOSTECH

    Response matrix measurement

    100 150 200 250 300 350 400 45016

    17

    18

    19

    20

    21

    22Response Matrix (RMS)

    Point

    [um

    ]

    0 100 200 300 400 5002.4

    2.5

    2.6

    2.7

    2.8

    2.9

    3

    Response matrix (MEAN)

    point

    [mm

    ]

  • Pohang Accelerator LaboratoryPOSTECH

    Summary

    -Digital Power SuppliesThe PLS orbit feedback operation is based on EPICS

    control system.70 of 19-bit digital controlled PS and there control

    systems working very well.Satisfactory operation result used digital controlled PS

    -DBPM LiberaTesting with Libera DBPM for orbit measurementsWe need replace full access version software for more

    fast and widely applications (Tryout versions are just opened HTTP for access data, It takes 15 seconds of 8,000 data samplings )

  • Pohang Accelerator LaboratoryPOSTECH

    Planes

    Digital Power Supplies:Just performance monitoring

    Digital BPM:Full accessible version driver install and porting EPICS

    IOC and optimizationSingle bunch testing for LINAC

  • Pohang Accelerator LaboratoryPOSTECH

    Acknowledgement

    I am gratefully thank to :

    F.Jene, L. Tener and Andreas in PSITony dobing, Mark Heron in DIAMOND

    for the many advice and support during the work.