GAS TRANSPORT NETWORK IN CROATIA - 2005
PROJECT DETAILS
Phase 1 - “Delivery and implementation of new Control system for gas pipeline system PLINACRO”
Contract signed on 25th May 2005 Planned duration: 17 months Factory Acceptance Test: 2nd February 2006 Site Acceptance Test: 19th July 2006 Beginning of Warranty period: 25th October 2006. for 48 months
Phase 2 - “SCADA system for new 75 bar network” Contract signed on 22nd December 2006 41 new process plants with RTUs Communication protocol IEC 60870-5-104 over optical fiber
network Site Acceptance Test: individually per RTU connection Warranty period duration: 24 months
Replacement of old and out-of-date SCADA system Replacement of secondary equipment in stations – DS
801 and MP 200/1 RTU 560 Delivery and installation of new communication system Delivery and installation of GIS/TIS systems Implementation of specific gas applications (SIMONE)
– Gas network model– State estimation– Prediction of network states (look ahead model)– Leak detection and location
The basics for ENTERPRISE MANAGEMENT SYSTEM
PROJECT FEATURES
GAS TRANSPORT NETWORK IN CROATIA - 2009
- MICROWAVE RING
- RADIO LINKS TO RTUs
- OPTICAL LINK
GAS TRANSPORT NETWORK IN CROATIA - 2009
TELEREADING SYSTEM (2008-2009)
INTEGRATION OF INFORMATION SYSTEMS (2009)
IBM WebSphere middleware (ESB, Message broker, XML)
Commercial gas transport
mgmt DB
ORACLE
TeleReading DB
ORACLE
ERP DB
ORACLE ERP(Oracle E-Business Suite 11i)
IBM WebSphere (Company portal)
Internal users
Internal users External
users
Externalusers
Adapter
TeleReading(GEMA Gas)
Adapter
Commercial Gas
Transport Management
System
Adapter
SIMONE Capacity
Tool
Adapter
SIMONE Online ABB NM
UDW
ABB NMSCADA
Adapter Adapter
SIMONE user
SIMONE user
UDW
ORACLE
AVANTI
ABB
CONCEPT OF BACKUP CENTER
MAIN PARTS OF THE PROJECT
1. SCADA NM 3G – backup and upgrade
2. Gas Simulation applications (Simone)
3. Telereading system
4. Microwave communications – backup and upgrade
5. Uninterruptable power supply
6. Optical Network supervision and protection – upgrade and backup
Duration of the project: 15 months (December 2010)
BASIC FEATURES FOR SCADA
NETWORK MANAGER REL 3.8G!– Dual configuration of SCADA and UDW servers in backup
center – Hot standby– Upgrade of existing system Transition period!– New Load Forecast (ANN)– Connection with dual and redundant Simone system– Connection between centers: optical GB link and 2 MB radio link
as backup
TRANSITION PHASE
Installation of test system for Rel3 (2×SCADA, 1×UDW, IDES, WS500) – preparation and migration of IDES DB from Rel2 Rel3
Installation of New system (Rel3) and FAT Connection of New system to objects RTUs in parallel with
Existing system (Rel2) preSAT1 of New system preSAT2 of New and Test system – switchover mechanism
between two centers New system takes over full control and Existing system is
reinstalled on Rel3 SAT for full configuration of both centers on Rel3