Plinacro Upgrade and System Extension

Igor Mandic, Josip Jovanovac, Plinacro, Zagreb;

Jasna Horvat, Matija Zecevic, Koncar, Zagreb

Page 2: Plinacro

GAS TRANSPORT NETWORK IN CROATIA - 2005

Page 3: Plinacro

PROJECT DETAILS

Phase 1 - “Delivery and implementation of new Control system for gas pipeline system PLINACRO”

Contract signed on 25th May 2005 Planned duration: 17 months Factory Acceptance Test: 2nd February 2006 Site Acceptance Test: 19th July 2006 Beginning of Warranty period: 25th October 2006. for 48 months

Phase 2 - “SCADA system for new 75 bar network” Contract signed on 22nd December 2006 41 new process plants with RTUs Communication protocol IEC 60870-5-104 over optical fiber

network Site Acceptance Test: individually per RTU connection Warranty period duration: 24 months

Page 4: Plinacro

Replacement of old and out-of-date SCADA system Replacement of secondary equipment in stations – DS

801 and MP 200/1 RTU 560 Delivery and installation of new communication system Delivery and installation of GIS/TIS systems Implementation of specific gas applications (SIMONE)

– Gas network model– State estimation– Prediction of network states (look ahead model)– Leak detection and location

The basics for ENTERPRISE MANAGEMENT SYSTEM

PROJECT FEATURES

Page 5: Plinacro

GAS TRANSPORT NETWORK IN CROATIA - 2009

- MICROWAVE RING

- RADIO LINKS TO RTUs

- OPTICAL LINK

Page 6: Plinacro

GAS TRANSPORT NETWORK IN CROATIA - 2009

Page 7: Plinacro

TELEREADING SYSTEM (2008-2009)

Page 8: Plinacro

INTEGRATION OF INFORMATION SYSTEMS (2009)

IBM WebSphere middleware (ESB, Message broker, XML)

Commercial gas transport

mgmt DB

ORACLE

TeleReading DB

ORACLE

ERP DB

ORACLE ERP(Oracle E-Business Suite 11i)

IBM WebSphere (Company portal)

Internal users

Internal users External

users

Externalusers

Adapter

TeleReading(GEMA Gas)

Adapter

Commercial Gas

Transport Management

System

Adapter

SIMONE Capacity

Tool

Adapter

SIMONE Online ABB NM

UDW

ABB NMSCADA

Adapter Adapter

SIMONE user

SIMONE user

UDW

ORACLE

AVANTI

ABB

Page 9: Plinacro

CONCEPT OF BACKUP CENTER

Page 10: Plinacro

MAIN PARTS OF THE PROJECT

1. SCADA NM 3G – backup and upgrade

2. Gas Simulation applications (Simone)

3. Telereading system

4. Microwave communications – backup and upgrade

5. Uninterruptable power supply

6. Optical Network supervision and protection – upgrade and backup

Duration of the project: 15 months (December 2010)

Page 11: Plinacro

BASIC FEATURES FOR SCADA

NETWORK MANAGER REL 3.8G!– Dual configuration of SCADA and UDW servers in backup

center – Hot standby– Upgrade of existing system Transition period!– New Load Forecast (ANN)– Connection with dual and redundant Simone system– Connection between centers: optical GB link and 2 MB radio link

as backup

Page 12: Plinacro

TRANSITION PHASE

Installation of test system for Rel3 (2×SCADA, 1×UDW, IDES, WS500) – preparation and migration of IDES DB from Rel2 Rel3

Installation of New system (Rel3) and FAT Connection of New system to objects RTUs in parallel with

Existing system (Rel2) preSAT1 of New system preSAT2 of New and Test system – switchover mechanism

between two centers New system takes over full control and Existing system is

reinstalled on Rel3 SAT for full configuration of both centers on Rel3

Page 13: Plinacro