PLINACRO PLINACRO CROATIAN GAS TRANSMISSION CROATIAN GAS TRANSMISSION SYSTEM OPERATOR SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division
10

PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

Dec 16, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

PLINACROPLINACRO

CROATIAN GAS TRANSMISSION CROATIAN GAS TRANSMISSION SYSTEM OPERATORSYSTEM OPERATOR

Mladen Čavić, B. Sc.Director of Transmission Division

Page 2: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

22

Liberalization

Security of supply

Unbundling infrastructure system operators

Regulatory Agency

Energy Reforms

Page 3: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

33

Legislative Framework – TPA, Tariff system

Energy subject – TSO = legally unbundled

Technical and technological preconditions- construction of infrastructure

Gas TransmissionGas Transmission

Page 4: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

44

Gas Market – harmonization with EU directives

Legal FrameworkLegal Framework

Transmission of natural gas is defined as energy activity

Transmission of gas is a public service The price of gas transmission service is regulated and

set in accordance with the tariff system The licence (issued by HERA) is required for the gas

transmission activity

Page 5: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

55

PPlinacrolinacro Ltd Ltd

Croatian Gas Transmittion Company

Defined as Croatian TSO (Gas Transmission System Operator) by Gas Market Act - next 30 years

Plinacro established by unbundling of gas transmission activity from INA Plc

100% state-owned company In charge of natural gas transmission; maintenance,

managing and supervision of the entire gas transmission system and its development and construction

Page 6: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

66

ZAGREB

50 bar do 2002

50 bar > 2002

75 bar

63 bar

Key:

KARLOVAC

Technical data - 2002

1,641 km of pipelines

137 MRSs

DC/SCADA

2.95 Bcm of gas transported

max. capacity 560.000 m³/h

Plan of Development and Modernization of the Gas Transmission System in the Republic of Croatia

first investment cycle 2002 – 2006

second investment cycle 2007 - 2011

UGS OKOLI

Page 7: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

77

LUČKO

KUTINA

KARLOVAC

ZAGREB

S. BROD

PULA

BELIŠĆE

OSIJEK

BELI MANASTIR

50 bar do 2002

50 bar > 2002

75 bar

63 bar

Key:

Technical data - 2007

2,085 km of pipelines

19 entry point

151 exit point

DC - new SCADA, CS system

3.1 Bcm of gas transported

max. capacity 860.000 m³/h

I. Investment phase 2002-2006

Planned: 210 million € 520 km of pipelines 17 exit points new SCADA + DC headquarters

• Development of the gas transmission systemand gasification of the parts of the Republic of Croatia – Istra, Primorje and Gorski kotar

Kutina-Sl. BrodZagreb Istok-KutinaPula-KarlovacLučko-Ivanja RekaBelišće-OsijekBolman-Beli Manastir

Goals

• Increased reliability of pipeline system and security of gas supply

Page 8: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

88

VODNJAN

UMAG

KUKULJANOVO

OMIŠALJ

BOSILJEVO

SPLIT

PLOČE

ZABOK

LUČKO

SLOBODNICA

D. MIHOLJAC

DRAVASZERDAHELY

ROGATEC

B. BROD

NOVA KAPELA

POŽEGADOBROVAC

OMANOVAC

SV. IVAN ŽABNO

BJELOVAR

KUTINA

GOSPIĆ

ZADAR

JOSIPDOL

KARLOVAC

BENKOVAC

KNIN

ZAGREB

S. BROD

PULA

BELIŠĆE

OSIJEK

BELI MANASTIR

50 bar do 2002

50 bar > 2002

75 bar

63 bar

Key:

Technical data - 2011

3,081 km of pipelines

19 entry point

178 exit point

2 interconnections (import routes)

4.5 Bcm of gas to be transported

max. capacity 1.200.000 m³/h

II. Investment phase 2007-2011

Planned:Planned:• 996 km of pipelines• 24 MRS• 443 mil. €Goals:

•Increased reliability of pipeline system and security of gas supply•Development of the gas transmission system and gasification of the parts of the Republic of Croatia – Lika and Dalmatia•Opening of new import supply route

Dravaszerdahely-D. Miholjac

Kutina-Dobrovac

Kukuljanovo-Urinj-Omišalj

Slobodnica-Bosanski Brod

Split-PločeRogatec-ZabokZabok-Lučko

Vodnjan-Umag

Sl. Brod-D. Miholjac

Page 9: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

99

VODNJAN

UMAG

KUKULJANOVO

OMIŠALJ

BOSILJEVO

SPLIT

PLOČE

ZABOK

LUČKO

SLOBODNICA

D. MIHOLJAC

DRAVASZERDAHELY

ROGATEC

B. BROD

NOVA KAPELA

POŽEGADOBROVAC

OMANOVAC

SV. IVAN ŽABNO

BJELOVAR

KUTINA

GOSPIĆ

ZADAR

JOSIPDOL

KARLOVAC

BENKOVAC

KNIN

ZAGREB

S. BROD

PULA

BELIŠĆE

OSIJEK

BELI MANASTIR

Connections with neighboring countries transmission systems

Slovenia

Bosnia and

Hercegovina

Hungary

Italy

Montenegro

InterconnectionsInterconnections

Serbia

Italy

BiH

Hungary

Slovenia

Serbia

Montenegro

Page 10: PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.

1010

PLINACRO Development ProjectsPLINACRO Development Projects