Top Banner
PLEIADES RACURS International Conference October 2009
22

PLEIADES RACURS International Conference October 2009.

Dec 14, 2015

Download

Documents

Dwight Glendon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLEIADES RACURS International Conference October 2009.

PLEIADES

RACURS International Conference

October 2009

Page 2: PLEIADES RACURS International Conference October 2009.

© Spot Image 20082

PLEIADES data, Very High Resolution imagery (VHR)

0.5m color

0.5m pan2m color

Page 3: PLEIADES RACURS International Conference October 2009.

© Spot Image 20083

PLEIADES, largest swath on the market place

PLEIADES

20 x 20 Km

60 x 60 KmSPOT

WorldView

17 x 17 Km

GeoEye

15 x 15 Km

For the same 0.5m GSD

Page 4: PLEIADES RACURS International Conference October 2009.

© Spot Image 20084

PLEIADES Terminal: Standard image products

50 cm B&W 8 or 16 bits

2 m colour 4 bands : B, R, G, NIR 8 or 16 bits

Pan Sharpened 50 cm colour 4 bands : B, R, G, NIR 3 bands in True or False colours 8 or 16 bits

Bundle : 50 cm B&W + 2 m colour bands 8 ou 16 bits

Product level SENSOR 1A level

radiometric corrections Perfect P and XS registration Localization accurracy: spec.7m (CE90)

ORTHO Geo-Location accurracy: spec.7m (CE90)

Page 5: PLEIADES RACURS International Conference October 2009.

© Spot Image 20085

PLEIADES 1-A

180°

PLEIADES 1-B

Twin satellite constellation

1-A: March 2010

1-B: +12 to 18 months

Page 6: PLEIADES RACURS International Conference October 2009.

© Spot Image 20086

PLEIADES constellation: key performances

Daily Revisit @<1m

1,000,000 km² per day

Top-level agility

200 km in 11 sec.

800 km in 25 sec.

Slew Time

Page 7: PLEIADES RACURS International Conference October 2009.

© Spot Image 20087

PLEIADES constellation: acquisition modes

typically 15 targets over 1,000 km

Multiple Point Targets

High-level agility

20 km

20 km

Same - pass Large Collection

Stereo, Tri-stereo

Up to 21,600 km²Or

1 deg²

In a single pass

Page 8: PLEIADES RACURS International Conference October 2009.

© Spot Image 20088

PLEIADES image processing: AOI sub-scene production

Multiple Point Targets

20 km

20 km

Page 9: PLEIADES RACURS International Conference October 2009.

© Spot Image 20089

PLEIADES image processing: Seamless same-day ortho-mosaic product

Same- pass Large Collection

Page 10: PLEIADES RACURS International Conference October 2009.

© Spot Image 200810

Illustration over Japan

Multiple Target imaging time~20%

Same-pass large collection

imaging time~40 to 80%

Page 11: PLEIADES RACURS International Conference October 2009.

© Spot Image 200811

PLEIADES: a dual access to data

10% High Priority Data (HPD) for Defense partners: France, Italy, Spain

90% for WW users through Spot Image

350 images/ day

~35 images HPD/ day

Access rights

Spot Image get access to up to 5 HPD

images / day for Pleiades-1A

Page 12: PLEIADES RACURS International Conference October 2009.

© Spot Image 200812

Routine: Centralized programming loop

Dialogue with Spot Image, as for SPOT Feasibility study

Standard Priority level Can be upgraded to Priority or Dedicated Priority (so-called DUAL High

priority data)

60 days Routine:

72 hours

Collection window

Routine Programming mode

Dead-Line for request

Page 13: PLEIADES RACURS International Conference October 2009.

© Spot Image 200813

DRS or Customer

Order RequestOrder Confirmation

Telemetry downlink

2Ghz networl

Collection plan upload

Collection

direct reception & processing

Collection plan

Routine: nominal centralized programming loop

Routine

Page 14: PLEIADES RACURS International Conference October 2009.

© Spot Image 200814

Routine

Priority level Upgrade

StandardDedicated

PriorityPriority

Routine programming priority level upgrade

Upgrade in case of conflict

To Priority: when conflicting with other routine request To dedicated priority: when conflicting with other priority request...

Or when depositing the request for time-critical or important data

Page 15: PLEIADES RACURS International Conference October 2009.

© Spot Image 200815

Urgent: 24/7 automatic procedure for deposit

No dialogue with Spot Image, except if requested during working days/hours

Up to 4 hours before collection

Limited AOI

Priority level

Dead-Line for Request Collection window

7 daysUrgent:

4 hours

Urgent Programming mode

Page 16: PLEIADES RACURS International Conference October 2009.

© Spot Image 200816

Urgent: 24/7 automatic procedure

6:00 UT13:40 UT 23:20 UT

Ability to take in account Urgent programming up to 4 hours before collection

24/7 access through automatic process with no intervention from Spot Image

collection plan update and upload 3 times a day, every 8 hours

Page 17: PLEIADES RACURS International Conference October 2009.

© Spot Image 200817

PLEIADES vs. competitors

Non-US VHR solution

90% of the resource available for Spot Image customers

Field-Proven Services Experience of station customer& station network management Full range of programming services up to direct tasking

Competitive pricing

Twin Constellation performance Top agility P and XS simultaneous collection Largest swath for same [email protected]

Page 18: PLEIADES RACURS International Conference October 2009.

© Spot Image 200818

PLEIADES vs. competitors: technical assets

Mission A constellation of 2 identical Pleiades satellites ensuring daily revisit of any

point of the globe Continuity of service : beyond 2018 Dual mission but…95% of satellite data for worldwide end-users

50% for GE-1, 15-30% for WV1…

Imaging capacity Large imaging capacity: 500,000km2 /day /satellite (roll<30°) Scene size 20 x 20 km with GSD 0.7m vs. 15x15 km with 0.5m for GE or 17 x17

for WV Permanent Pan + XS imaging mode, no « slowdown » Agility: very large mono-pass capacity

Pleiades more agile than GE-1(x2), same as WV Tri-stereo

Services High level of reliability and operationality ( SPOT legacy) Mosaic , pan-sharpened and 3D products as output of standard PHR archiving

& processing system

0

50

100

1er trim.

Data availibility for market

W V-1

GE-1

PHR

15

15

20

Page 19: PLEIADES RACURS International Conference October 2009.

© Spot Image 200819

18 sec

200 km

IKONOS

9 sec

200 km

WorldView-2

Pleiades and WorldView benefit from Control Moment Gyros (CMGs) that provide an acceleration >10X better than competition

20 sec

200 km

GeoEye-1

PLEIADES vs. competitors: Agility Comparison

11 sec

200 km

Pleiades

No CMG With CMG

Page 20: PLEIADES RACURS International Conference October 2009.

© Spot Image 200620

Pleaides + Spot 6: a bright EO constellation in orbit…very soon

Spot 6 (left) and 2 Pleiades (right) ready to span their wings, phased on the same orbit …with unique advantages:

-coherent data collection planning by Spot Image as unique commercial satellite operator

-2+1 optical LEO systems having same imaging bands and fully compatible ground image reception and processing

-60km swath

-2m ground resolution

-800km corridor view -20km swath

-0.5m ground resolution

-800km corridor view

Page 21: PLEIADES RACURS International Conference October 2009.

© Spot Image 200621

PLEIADES 1-A

SPOT 6

PLEIADES 1-B

97°

103° SPOT 7

PLEIADES + Spot 6/7 constellation in 2012

Page 22: PLEIADES RACURS International Conference October 2009.

© Spot Image 200622

Contact :[email protected]

Thank you !