Design Optimization For Energy- Efficient Skylit Office Spaces Amir Rezaei-Bazkiaei MKK Consulting Engineers Inc. – Innovation Lab Ladan Ghobad Interface Engineering 1/16
16

PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Feb 14, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Design Optimization For Energy-Efficient Skylit Office Spaces

Amir Rezaei-Bazkiaei

MKK Consulting Engineers Inc. – Innovation Lab

Ladan Ghobad Interface Engineering

1/16

Page 2: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Big Data and Visualization Applications 2/16

Page 3: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Big Data Examples from Other Industries

• Cancer research (human genome sequencing)

• Targeted advertising

• Precision agriculture

• Financial analysis

• Politics and news

3/16

Page 4: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Big Data for AEC Industry

• Rule-of-thumb versus Data-driven Decisions

• Feedback with the Speed of Design

• Targeted and Integrated Approach

• Workflow Optimization

4/16

Page 5: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Skylight Optimization Problem 5/16

Page 6: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Skylight Optimization Problem

• 3 locations (Washington DC, Boston, Miami)

• 16 equally spaced skylights

• Dimensions

• Aperture to Floor Ratio (AFR): 0.1% - 8%

• SHGC: 0.19 to 0.80

• Visible Transmittance: 0.1 to 0.6

• U-value: 1-4 W/m2.k (0.17 - 0.70 Btu/hr.ft2.K )

• Interior Wall Visible Absorptance: 0.10 - 0.90

6/16

Page 7: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Analyzing a Large Dataset 7/16

Page 8: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Performance Maps 8/16

Page 9: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Multiple Design Options 9/16

Design Alg

Cost Illum L W AFR SHGC VT ABS

U-Fac

Goals ($) (Lux) (m) (m) (%) (w/m2.K)

1<AFR<2 &Lux>100 & Min Cost H-J 3066 197 1.5 0.2 1.6 0.2 0.6 0.1 1.73

1<AFR<2 &Lux>100 & Min Cost PSO 3077 169 1 0.4 1.8 0.2 0.6 0.1 1.71

2<AFR<4 &Lux>300 & Min Cost H-J 3128 303 2.4 0.3 2.9 0.2 0.6 0.1 1.7

2<AFR<4 &Lux>300 & Min Cost PSO 4157 348 3.9 0.2 3.7 0.7 0.6 0.2 2.2

4<AFR<5 &Lux>300 & Min Cost H-J 3251 317 0.8 1.1 4.2 0.2 0.6 0.3 1.8

4<AFR<5 &Lux>300 & Min Cost PSO 3303 300 1 1 4.8 0.2 0.6 0.8 2.8

5<AFR<6 &Lux>300 & Min Cost H-J 3327 403 0.4 2.7 5.2 0.2 0.6 0.3 2

5<AFR<6 &Lux>300 & Min Cost PSO 3349 303 1.1 1 5.3 0.2 0.6 0.8 2.8

6<AFR<8 &Lux>300 & Min Cost H-J 3413 446 1.4 0.9 6 0.2 0.6 0.1 1.8

6<AFR<8&Lux>300 & Min Cost PSO 3423 523 1.8 0.7 6 0.2 0.6 0.8 3

Page 10: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Radiant Cooling/Heating Optimization 10/16

North Façade Results

Page 11: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

11/16 Radiant Cooling/Heating Optimization Infiltration is a key item!

Page 12: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Form/Shape Optimization

12/16

Page 13: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

13/16 Form/Shape Optimization

Page 14: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

14/16 Form/Shape Optimization

Page 15: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

15/16 Off-Grid Building Design 179.5 kW

97.9 kW

0.0 kW

101.9 kW

55.7 kW

0.3 kW

PV Generation [W]January February March April May December

Building Electricity Demand [W] - Assembly 7, 62.1 OA levels and no-DCVJanuary February March April May June

Ho

urs

June July August September October November

Ho

urs

July August September October November December

Page 16: PLEA2016_Amir Rezaei-Bazkiaei_FINAL

Amir Rezaei-Bazkiaei

Innovation Lab

MKK Consulting Engineers Inc.

Denver CO

[email protected]

Ladan Ghobad

Interface Engineering

Washington DC

[email protected]

16/16