POWER LINK CONTRACTING DUBAI

COMPANY PROFILE

Page 2: PLC-Company profile

~ 2 ~

INDEX

1. Brief History, Introduction, Mission statement & The

Pedigree

2. Photographs of Major site activities

3. Company & Activities

4. Organisation chart

5. Work Experience & Capabilities

6. Projects under Execution

7. Key personnel

8. Company Resources/Assets

9. Health, Safety & Environmental Protection System

10. Quality Assurance and Quality Control

Page 3: PLC-Company profile

~ 3 ~

BRIEF HISTORY OF THE COMPANY

Power Link Contracting, Dubai, was set up with the aim of serving the

UAE in building an integrated power network. The company began in

1999 by carrying out the erection of new GSM towers across the UAE and

aviation painting of existing overhead power transmission lines in this

region.

With the strong commitment and dedication of its staff, PLC raised its

profile to take up all type of construction associated with Over Head

Transmission Line (except pile foundation) .PLC is proud to mention its

association in completing all assigned activities in one of the toughest

terrain of double circuit overhead transmission line (D/C OHTL) 400KV

between Fujairah – Dhaid (Northern emirates)

PLC with its strong assets and technical competency also has a sound

financial back-up of the Arab Gulf Pearl Trading Establishment,

Abudhabi, UAE.

INTRODUCTION

Power Link Contracting, DUBAI has made rapid strides in the

construction of overhead transmission lines (OHTL) in U.A.E and has

achieved remarkable growth within a short span of time.

The company is able to execute complete OHTL projects from 33KV to

400KV (except pile foundations) involving survey, construction of access

roads, tower foundation (Pad & Chimney), erection, painting and

stringing. PLC is proud to project progress in foundation, erection and

stringing works have often exceeded client’s expectations.

The manpower strength of the company in UAE stands at about 200

personnel (includes skilled & semi skilled).The company owns latest

technology (operations controlled by remote) tension stringing

equipment (2 sets) from ZECK Germany suitable for both twin and

quadruple conductors including all essential accessories.

Page 4: PLC-Company profile

~ 4 ~

MISSION STATEMENT

To be an innovative company driven by performance, providing the best

value for money and commitment and complete satisfaction to all our

customers/clients with timely completion of project, while pursuing the

path of excellence.

THE PEDIGREE

“Power Link Contracting” bears a strong lineage and draws its strength

from the rich legacy of “Arab Gulf Pearl Trading Est.” The group’s vision

and relentless business excellence ensures total customer satisfaction

.The same zeal and wisdom guides this company too.

The division, with its assets and technical competency and backed by the

financial soundness of the group, is fully geared up for the undertaking of

large projects in Power Transmission Lines and other sectors on Turnkey

basis.

Power Link Contracting, Dubai has its branch office in Abu Dhabi. The

manpower strength in UAE stands about 200 personnel .The company is

involved in number of projects in UAE & OMAN

Page 5: PLC-Company profile

~ 5 ~

PHOTOGRAPHS ON MAJOR ACTIVITIES

Proves our team efforts

Page 6: PLC-Company profile

~ 6 ~

ACCESS ROAD

Page 7: PLC-Company profile

~ 7 ~

Laying of Access Road in 400KV OHTL Fujairah – Dhaid

Preparation of Access Road in 400KV OHTL Fujairah – Dhaid

Page 8: PLC-Company profile

~ 8 ~

Access Road in 400KV OHTL Fujairah – Dhaid

Laying of Access Road in 400KV OHTL Fujairah – Dhaid

Page 9: PLC-Company profile

~ 9 ~

FOUNDATIONS

Page 10: PLC-Company profile

~ 10 ~

Preparation of Foundation in 400KV OHTL Fujairah – Dhaid

Excavation in 400KV OHTL Fujairah – Dhaid

Page 11: PLC-Company profile

~ 11 ~

Reinforcement placed for Foundation in 400KV OHTL Fujairah – Dhaid

Reinforcement placed for Foundation in 400KV OHTL Fujairah – Dhaid

Page 12: PLC-Company profile

~ 12 ~

Preparation for Foundation in 400KV OHTL Fujairah – Dhaid

Stub Setting in 400KV OHTL Fujairah – Dhaid

Page 13: PLC-Company profile

~ 13 ~

Stub Setting in 400KV OHTL Fujairah – Dhaid

Pouring of Concrete in 400KV OHTL Fujairah – Dhaid

Page 14: PLC-Company profile

~ 14 ~

Pouring of Concrete in 400KV OHTL Fujairah – Dhaid

Completed Foundation in 400KV OHTL Fujairah – Dhaid

Page 15: PLC-Company profile

~ 15 ~

Foundation with Sub Setting in 400KV OHTL Fujairah – Dhaid

Completed Foundation in 400KV OHTL Fujairah – Dhaid

Page 16: PLC-Company profile

~ 16 ~

Access Road with Completed Foundation in 400KV OHTL Fujairah – Dhaid

Page 17: PLC-Company profile

~ 17 ~

TOWER ERECTION

Page 18: PLC-Company profile

~ 18 ~

Tower Erection with Gin Pole

Page 19: PLC-Company profile

~ 19 ~

Erected Tower in 400KV OHTL Fujairah – Dhaid

Page 20: PLC-Company profile

~ 20 ~

STRINGING

Page 21: PLC-Company profile

~ 21 ~

Preparation of Roller Hoisting for Stringing

Roller Hoisting for Stringing in 400KV OHTL Fujairah – Dhaid

Page 22: PLC-Company profile

~ 22 ~

Stringing in 400KV OHTL Fujairah – Dhaid

Stringing in 400KV OHTL Fujairah – Dhaid

Page 23: PLC-Company profile

~ 23 ~

TSE AND TOOLS

Page 24: PLC-Company profile

~ 24 ~

Socks for Conductor Stringing

Belts for Lifting of Towers Using Crane

Page 25: PLC-Company profile

~ 25 ~

Spacer Fixing Cradle

Gin Poles for Tower Erection

Page 26: PLC-Company profile

~ 26 ~

Gin Pole for Tower Erection

Pilot Wire Drums

Page 27: PLC-Company profile

~ 27 ~

Three Sheave Pulleys

Single Sheave Pulleys

Page 28: PLC-Company profile

~ 28 ~

Five Sheave Pulleys

Page 29: PLC-Company profile

~ 29 ~

THE COMPANY & ITS ACTIVITIES

The following types of activities are undertaken by

POWER LINK CONTRACTING LLC

(i) Civil Construction and refurbishment

In this sector the civil construction works like survey,

service roads, line transmission and painting of

towers, refurbishment works and electrical work for

the industrial sectors are being covered.

(ii) Transmission system and GSM

In this sector the services are provided to power and

telecom sector. The services includes installation of

transmission line towers, painting, earth work &

laying of service roads, foundations stringing

conductor, OPGW & Cabling, earthing and fixing

aviation lights etc.

(iii) Scaffolding Services

In this sector we provide total solutions for scaffolding

& motorised cradle services. The scaffolding services

include study of required parameters, designing in

accordance with applicable codes & standards and

erection & dismantling work as per our HSE

standards. The services are provided on hire basis,

Turnkey contract basis and as an associate activity

with other construction activities.

Page 30: PLC-Company profile

~ 30 ~

BRANCHES & CONTACT ADDRESS

1.1.1.1. DUBAIDUBAIDUBAIDUBAI

POWER LINK CONTRACTING

P.O.BOX 72351

DUBAI

UNITED ARAB EMIRATES

TEL: 00971 4 – 3365322 / 3365323

FAX: 00971 4 – 3365324

MOB: 0971 – 50- 8116434

2.2.2.2. ABU DHABI ABU DHABI ABU DHABI ABU DHABI

POWER LINK GENERAL CONTRACTING

P.O.BOX 7371

ABU DHABI

UNITED ARAB EMIRATES

TEL: 00971 -2 – 6444575

FAX: 00971 4 – 6443348

MOB: 0971 – 50- 6414980

3.3.3.3. OMANOMANOMANOMAN

POWER LINK CONTRACTING

P.O.BOX 694, P.C 114

MUSCAT

SULTANATE OF OMAN

TEL: 00968 -24875156

MOB: 0968 – 98165-105

Page 31: PLC-Company profile

~ 31 ~

Page 32: PLC-Company profile

~ 32 ~

WORK EXEPERIENCE & CAPABILITIES

Sl.Sl.Sl.Sl.

NoNoNoNo

ClientClientClientClient Main ContractorMain ContractorMain ContractorMain Contractor Activities of works ExecutedActivities of works ExecutedActivities of works ExecutedActivities of works Executed QuantityQuantityQuantityQuantity

1 ADWEA M/s KEC International

Ltd

Supply and painting of

400KV/220KV Towers

170 No’s

2 TRANSCO -do- Apply of paint for 400 KV / 220 KV

towers from Taweelah to Yas

Island

80,000 SQMTR

3 SEWA -do- Erection of 220 KV towers from

Altay - Sajja to Sajja - Hamriya

1000 MT

4 ADWEA M/s Larsen & Toubro

Ltd

For 220 KV OHL - Liwa GS to Liwa

West Erection of

towers

2750 MT

Stringing of conductors / OPGW 45.15 Km

5

ADWEA

-do-

For 220 KV DC OHL - Sweihan GS

to Al Hayer & Ramah in Al Ain

Erection of towers

1300 MT

Stringing of conductors / OPGW 89.8Km

For 400 KV DC OHL - Jabel Ali to

Merkadh Erection of

towers

4500 MT

6

DEWA

M/s Emirates trading

Agency (ETA)

Stringing of conductor / OPGW 30km

Survey 42 km

Stub setting / Pile Head 175 Nos

7

ADWEA

-do-

Erection of towers 209 Nos

Stringing of conductors / OPGW 42 km

8

MEW GCC

Grid

M/s Emirates Trading

Agency (ETA)

For 400 KV DC OHL - Dhaid 'S/S' to

'H' S/S Erection of

towers

4000 MT

Stringing of conductor / OPGW 69 km

9

DEWA

- do -

For 400 KV DC OHL - Diamond

crossings to Bukhiora S/S

Erection of towers

2400 MT

Stringing of conductor / OPGW 9 km

Erection of towers & gantry 50 MT

Construction of access road 0.5 km

10

ADWEA

M/s Emirates Star

International LLC

Removal of DC twin bundle Aldrey

conductor

5.64 km

Removal of OPGW 5.64 km

Removal of DC towers 15 Nos. 358 MT

11

FEWA

M/s Civil Contracting

Co. Ltd

For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL ----

Northern Emirates Northern Emirates Northern Emirates Northern Emirates Erection of

towers

6300 MT

Stringing of conductor / OPGW 68.5 km

12

SEWA

-do-

For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL For 220 KV / 132 KV DC OHL ----

Northern Emirates Northern Emirates Northern Emirates Northern Emirates

Erection of towers

9 No’s

Stringing of conductor / OPGW 7 km

Construction of access road 131 km

13 MEW M/s Hyundai working platform for 400 KV OHL

(Project MEW/E01/2003-Lot II - 1

293 No’s

14 FEWA M/s National For 220 KV DC OHL For 220 KV DC OHL For 220 KV DC OHL For 220 KV DC OHL –––– FujairahFujairahFujairahFujairah 1500 MT

Page 33: PLC-Company profile

~ 33 ~

Contracting Co. Ltd

Erection of towers

Stringing of conductor / OPGW 34 km

15

DEWA

M/s National

Contracting Co. Ltd

For 400 KV DC OHL For 400 KV DC OHL For 400 KV DC OHL For 400 KV DC OHL ---- Jabel Ali to Jabel Ali to Jabel Ali to Jabel Ali to

Najma Najma Najma Najma Erection of

towers

3600 MT

Stringing of conductors / OPGW 22 km

Dismantling of conductors 22 km

Survey / Profile 9 km

Erection of towers 45 Nos

16

ADCO

M/s Ranya

Contracting Est.

Stringing of conductors / OPGW 9 km

Painting of towers 200 MT

Construction of platform for tower

erection 45 No’s

PROJECTS UNDER EXECUTION

Sl. NoSl. NoSl. NoSl. No

ClientClientClientClient Main ContractorMain ContractorMain ContractorMain Contractor Activities of Works ExecutedActivities of Works ExecutedActivities of Works ExecutedActivities of Works Executed QtyQtyQtyQty

1 TRANSCO M/s Hyundai

For 400 KV DC OHL For 400 KV DC OHL For 400 KV DC OHL For 400 KV DC OHL ---- Mussafah to Mussafah to Mussafah to Mussafah to

Madinat (Contract No. NMadinat (Contract No. NMadinat (Contract No. NMadinat (Contract No. N----4099) 4099) 4099) 4099)

Stringing of conductors / OPGW

133 km

2

TRANSCO

M/s

Kalpataru

Transmission

International Ltd

For 220 KV OHL For 220 KV OHL For 220 KV OHL For 220 KV OHL ---- Al Ain South West Al Ain South West Al Ain South West Al Ain South West

to Al Oush (Contract No. Nto Al Oush (Contract No. Nto Al Oush (Contract No. Nto Al Oush (Contract No. N----4673) 4673) 4673) 4673)

Erection of towers

6000 MT

Stringing of conductors / OPGW

109 km

Page 34: PLC-Company profile

~ 34 ~

KEY PERSONNEL

DIRECTORDIRECTORDIRECTORDIRECTOR

Mr. Adam Sheikh - Mobile No: 0506414980

DIRECTOR DIRECTOR DIRECTOR DIRECTOR

Mr. M. Umapathy - Mobile No: 919444046106

CHIEF EXECUTIVE OFFICER CHIEF EXECUTIVE OFFICER CHIEF EXECUTIVE OFFICER CHIEF EXECUTIVE OFFICER

Mr. M.Manivannan - Mobile No: 0508116434

HR & ADMIN MANAGERHR & ADMIN MANAGERHR & ADMIN MANAGERHR & ADMIN MANAGER

Mr. Askermon Abu Backer - Mobile No: 0505505361

FINANCE & ACCOUNTS FINANCE & ACCOUNTS FINANCE & ACCOUNTS FINANCE & ACCOUNTS OFFICEROFFICEROFFICEROFFICER

Mr. D.Suresh Jayaseelan - Mobile No: 050 5505364

Page 35: PLC-Company profile

~ 35 ~

COMPANY RESOURCES /ASSETS

A.DETAILED LIST OF TOOLSA.DETAILED LIST OF TOOLSA.DETAILED LIST OF TOOLSA.DETAILED LIST OF TOOLS

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DescriptionDescriptionDescriptionDescription Quantity( No's)Quantity( No's)Quantity( No's)Quantity( No's)

1 Pulley lift 6 ton 22

2 Pulley lift 3 ton 29

3 Pulley lift 1.5 ton 34

4 Pilot wire drum stand 6

5 Conductor drum stand 9

6 Conductor clamp (auto) 54

7 OPGW clamp automatic 27

8 Head board OPGW 1

9 Hydraulic cutter 2

10 Hand cutting m/c 2

11 Ground roller 10

12 Single sheave small 54

13 Spacer trolley small 2

14 Spacer trolley medium 3

15 Spacer trolley big 3

16 Swivel connector 27

17 Swivel joint 25

18 Lever Hoist (Turfar) 19

19 Joint protector 40

20 Joint pressing m/c 9

21 Earth discharge cable 14

22 Earth discharge rod 3

23 Double end socks 15

24 Die set 22

25 Conductor clamp liner 173

26 Concrete block 150

Page 36: PLC-Company profile

~ 36 ~

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DescriptionDescriptionDescriptionDescription Quantity( No's)Quantity( No's)Quantity( No's)Quantity( No's)

27 Bulta clamp 422

28 Bow shackle 60

29 Block stand 6

30 Aluminium ladder 4

31 Nylon rope 18mm(200mt) 29

32 Nylon rope 20mm(200mt) 16

33 Rachat full drive 6

34 Rachat 1/2 drive 6

35 Reel Winder Zeck 1

36 Rope ladder 2

37 Single end socks 12

38 D" shakle 586

39 Sling 16 x 1 metres 116

40 Sling 16 x 13 metres. 20

41 Sling 16 x 14 metres 15

42 Sling 16 x 2 metres 247

43 Sling 16 x 3 metres 8

44 Sling 16 x 4 metres 12

45 Steel rope 10mm 50

46 Steel rope 12mm 30

47 Steel rope 16mm 46

48 Steel wire cutter 2

49 Template Jack 39

50 Tommy bar (spanner) 147

51 Vibrator m/c 1

52 Walki talki 25

53 Water cooler 2

Page 37: PLC-Company profile

~ 37 ~

B.B.B.B. DETAILED LIST OF EQUIPMENTSDETAILED LIST OF EQUIPMENTSDETAILED LIST OF EQUIPMENTSDETAILED LIST OF EQUIPMENTS

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DeDeDeDescriptionscriptionscriptionscription Quantity( No's)Quantity( No's)Quantity( No's)Quantity( No's)

1 Tensioner / Puller (Zeck) 18 Ton 1

2 Tensioner (Tesmec) 12 Ton 1

3 Puller (Tesmec) 8 Ton 1

4 Puller (Tesmec) 3 Ton 1

5 Tensioner (Tesmec_ 3 Ton 1

6 Tensioner / Puller (Zeck) 5 Ton 1

7 Winch m/c 5

8 Sag Bridge set 4

9 Sag scope 2

10 Reel Winder Tesmec 2

11 Roller 3 sheave 135

12 Roller 5 sheave 178

13 Head board conductor 4

14 Gin pole 4

15 Conductor drum jack (Zeck hydralic) 4

16 Pilot wire drum 10mm 13

17 Pilot wire drum 12mm 18

18 Pilot wire drum 18mm 36

19 Pilot wire drum 22mm 23

C.DETAILED VEHICLE LIST C.DETAILED VEHICLE LIST C.DETAILED VEHICLE LIST C.DETAILED VEHICLE LIST

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DescriptionDescriptionDescriptionDescription Registration NoRegistration NoRegistration NoRegistration No

1 Toyota Land cruiser 13025

2 Jeep Cherokee 4879

3 Toyota Prado 14751

4 Concorde Cherokee 779

5 3 ton Mitsubishi 41860

6 Toyota pick up 14750

Page 38: PLC-Company profile

~ 38 ~

7 Hi up 7 Ton 37106

8 Hi up 3 Ton 33756

9 60 seated bus 32811

10 1 ton pick up 33632

11 3 ton Mitsubishi 32813

12 30 Seater Bus 39343

D.MACHINERIES D.MACHINERIES D.MACHINERIES D.MACHINERIES –––– PAINTINGPAINTINGPAINTINGPAINTING

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DescriptionDescriptionDescriptionDescription Registration NoRegistration NoRegistration NoRegistration No

1 Fan for Air compressor 1

2 Magnetic Thermometer & other equip. 1

3 Reverso Tips - 4 1

4 Pneumatic Air Drill-1 1

5 Air Hose 3/4" 1

6 Air Hose 1 1/2" - 40mtr, etc 1

7 A/c Cool Air Tube w/belt-clemco 1

8 Temporary switch for Air Comp 1

9 Sand Blasting Hose & Coupler 1

10 Hose, Reducer joint, Nozzle, etc. 1

11 Mini Blast pot with access. & fright 1

12 Blast Pot with accessories 1

13 Whirling Hygrometer, Gauge, etc 1

14 Graco Airless Spray unit & Elcometer 1

15 Air Compressor 250 & Sand Blasting 1

16 Safety protector 8

17 Sanding m/c 1

18 Screw Tightner 1

19 Sand blasting pot 200 litre 3

20 Sand blasting pot 20 litre small 1

21 Shot gun Hilti DX600N 1

Page 39: PLC-Company profile

~ 39 ~

22 Shot gun Hilti DXA40 1

23 Painting mixing Machine 1

E.DETAILED LIST OF SCAFFOLDING MATERIAL E.DETAILED LIST OF SCAFFOLDING MATERIAL E.DETAILED LIST OF SCAFFOLDING MATERIAL E.DETAILED LIST OF SCAFFOLDING MATERIAL –––– 4000 Cubic Metre4000 Cubic Metre4000 Cubic Metre4000 Cubic Metre

FFFF.... TESTING INSTRUMENTS & TESTING INSTRUMENTS & TESTING INSTRUMENTS & TESTING INSTRUMENTS & MEMEMEMETERSTERSTERSTERS

S.I. NO.S.I. NO.S.I. NO.S.I. NO. DescriptionDescriptionDescriptionDescription Quantity ( No’s)Quantity ( No’s)Quantity ( No’s)Quantity ( No’s)

1 Cable Sensor 1

2 Conductivity meter 3

3 Conductivity meter 1

4 DFT gauge 1

5 Digital low resistance OHM meter 1

6 Digital micro ohm meter 1

7 Dumpy level - S.No.NIKON 606843 1

8 Dumpy level - S.No.Wild 401621 1

9 Dumpy level - S.No.Wild 533746 1

10 Dumpy level - S.No.Wild 556379 1

11 Dumpy level - S.No.Wild 703755 1

12 Dumpy level - S.No.Wild Nak 343817 1

13 Dyna meter 3 ton 2

14 Earth Digital Tester 1

15 Higro meter 1

16 Humidity Calibrator 2

17 Insulation Puncture detecter 1

18 Line Detecter (Mark craft) 1

19 Microprocessor coating thickness gauge 1

20 Ohm meter high current 2

21 Sagging Scope 1

22 Salt level checking meter 1

23 Theodilite T 16 FNR 326013 1

Page 40: PLC-Company profile

~ 40 ~

HEALTH, SAFETY & ENVIRONMENTAL PROTECTION

Common Accidents on Construction sites

1. The Number One accident on Construction sites throughout the world

is falling from a height. To avoid this, you must wear a Safety belt when

working in an area with no edge protection. If you cannot attach the

harness to anything fixed to the tower i.e. life line, Do Not Work in this

area and contact your safety officer. Always connect your Safety Harness Always connect your Safety Harness Always connect your Safety Harness Always connect your Safety Harness

before you enter the danger area.before you enter the danger area.before you enter the danger area.before you enter the danger area. Never reach over Safety barriers or lift

equipment up the side of a tower from one floor to another; you can

easily fall over the edge or drop the equipment, use the hoist instead.

Always wait for hoist behind safety gates. If you are working from a

platform i.e. Scaffold, please check the Scafftag to make sure it is up to

date and safe to use. Do not take risks.

2. The second is workers getting struck by falling materials and work

equipment. Always wear your Safety Helmet and never work directly Always wear your Safety Helmet and never work directly Always wear your Safety Helmet and never work directly Always wear your Safety Helmet and never work directly

underneath the edge of a Tower.underneath the edge of a Tower.underneath the edge of a Tower.underneath the edge of a Tower. Do not enter any areas that has de-

shuttering in progress and if an area is sealed off with warning tape this

is for a reason, Do Not Enter. Never work in the bottom of a lift shaft

where debris is always falling as most construction sites use the lift shaft

as a rubbish chute. Always use pedestrian walkways to commute from

one area to the other.

3. The third is electrical accidents; workers suffer electric shocks and

burns when they use unsafe equipment or when they cut through cables

accidentally. Always check that there is a circuit breaker fitted before

connecting to power supply. Check the condition of cables,Check the condition of cables,Check the condition of cables,Check the condition of cables, if there are any

splits with wires that are mistake, report it to your Foreman

immediately. Do not let cables lie in water, and try to keep cables up on

the wall brackets provided above head height. Ensure cables never lay

across a main walkway where they can cause a tripping hazard.

4. The fourth most common form of accident on a construction site is

being struck by plant vehicles. Never walk behind a reversing vehicle,

wait until it is moving forward. Never squeeze between a vehicle and a

Page 41: PLC-Company profile

~ 41 ~

fixed object. Use all site safe pedestrian walkways to minimize the

amount of time you are in contact with the site plant. Only cross where

there are Flag men and look both ways before crossing.

5. The fifth is ladders and stepladders; if you are working from a

stepladder ensure someone is holding the side; they are extremely

unstable and can topple over very easily. Never stand on the top step. Do

not work near the edge because when you are at working height and you

will be above the edge protection. Ladders are a form of getting to your

workplace, never work from them. They should be 1 meter above the

platform and be at an angle of 1 in 4, i.e. 4 meter high ladder should be 1

meter out at bottom.

Electrical Safety on Construction Sites

Each year, over 20 people die from electric shocks or electric burns while

working on construction sites. There are over 700 serious burns a year,

when electrical arcing occurs, perhaps as a result of accidental short

circuit, the heat generated can be intense and can cause deep, slow

healing burns. Electric shock can also lead to falls from height when

working from a stepladder or platform.

1. Check the electrical equipment you are about to use is

the right colour code for the month, which means it has been

checked by the Safety department and is safe to use.

2. Daily visual inspections of all electrical tools are essential to maintain

safety. Check for any loose wires at socket and for only 1 cable per socket,

check cable for any damage etc.

3. Never let cables lay in water, if there is the smallest cut in the cable

which is hard to detect by eye, it will eventually let in water and could

cause a short circuit.

4. Use wall brackets provided for cables at head height, this prevents

tripping hazards as well as preventing damage to cables from materials

being dropped onto them. Do not place stepladders on top of cables, if the

rubber feet are missing they can cut through the wire and cause

electrocution.

Page 42: PLC-Company profile

~ 42 ~

5. Check the power cable or extension cable back to the source. If it is not

fitted with a Power breaker/Trip switch, do not use and contact your

Foreman.

6. Do not leave extension cables tightly wound when connected to the

power supply, this causes the cables to heat up and can catch fire.

7. If a fellow worker does suffer an electric shock, call the first aid

department and Foreman immediately. If they are suffering from an

electrical shock and are still touching or connected in some way to the

power supply, do not touch them, you will be electrocuted. Turn off all

power before attempting to help.

8. When you have finished working with your electrical power tool

always disconnect it from the power supply in case of accidental start up.

Emergency Evacuation Procedures

1. If you see a fire anywhere inside the Site boundary, immediately find

your nearest Charge hand or Foreman from any contracting company,

who can then raise the alarm.

2. Only tackle the fire with a Fire extinguisher if you feel confident to do

so, do not be a hero and put your life at risk.

3. Use as many Fire extinguishers as you can to put out Fire and always

aim at the base of fire.

4. If the Fire is still raging, leave the well on site alone and go to the

Towers Fire point with all co-workers, do not panic or run, make your

way safely telling all site workers as you go to your nearest assembly

point.

5. When leaving site in an emergency situation due to fire, please

disconnect all power supply if you are in no danger.

6. When you are at the Fire point, do a general head count, see if anyone

is missing, do not under any circumstances go back to the fire.

7. Call your Safety Officer and give details of fire when they arrive.

Page 43: PLC-Company profile

~ 43 ~

8. Inform the First aid representative in your area of any contracting

company about any possible injuries or fatalities. Give number of injured

for Ambulance purposes.

9. If you call for Ambulance ensure you give your exact location and your

telephone number to the emergency services in case they have to phone

back for any other information.

Emergency phone numbers: Fire: 997, Ambulance: 998/999,

Safety Officer 050-3823986 / Safety Inspector: 050-3027822.

10. When the Fire Department arrives, give precise details of any missing

people and any other relevant information.

11. Only go back to your workplace when you have been told to do

by a Charge- hand/Foreman, Fire marshal or Safety officer that it is

safe to do so.

Fire Safety

1. Good Housekeeping is essential to maintain good access and egress

(door) in the event of an emergency, if any work materials or rubbish

are blocking main walkways or exits, move it away immediately.

2. Understanding Fire: there are 3 factors to consider when you think of

Fire: Fuel, Heat and Oxygen. If you remove one of these factors there

will not be a Fire.

3. There are 4 ways that a Fire can spread;

� Convection: where fire and smoke rise to the highest point, filling

the area and heating up the materials until they reach their ignition temperature, and combust.

� Radiation: Where objects that are close to the fire heat up and

when reaching ignition temperature will combust.

� Conduction: Where objects in direct contact with fire heat up and

then further fire will occur where that objects contact combustible

materials.

� Direct Burning: once something is burning, other items in contact

will burn.

Page 44: PLC-Company profile

~ 44 ~

4. Hazards from fire: Heat, Smoke (more people die a year from smoke

inhalation during a fire than any other cause), Toxic flammable fumes,

suffocation, property damage and panic.

5. Top 4 reasons for Fire: Arson, Smoking, Electrical and Cooking.

6. Human behaviour that act as for reasons of fire: Forgetfulness,

Ignorance, Thoughtlessness, Carelessness.

7. Fire drills are important so that you are familiar with where and what

to do in an emergency.

8. Omega has 2 types of Fire Extinguishers on site: Dry Powder and

Carbon Dioxide.

� Dry Powder (red) should be used on Class A, B, C and Electricity

Fires.

A = Wood, Paper, Cardboard, textiles and furnishings

B = Petrol, oils, paints, solvents, spirits

C = Natural Gas, Hydrogen, Propane, Butane.

Electrical fires, where a short has occurred.

� Carbon Dioxide (black) should be used on B, C and Electrical Fire.

Never touch the horn after use, you will receive frost burn.

9. The Main Contractor has provided Temp Fire Hose Reels in case of a

Fire emergency, this is to be used on class A, B and C fires. Never use

water on Electrical Fires, you will be electrocuted.

10. Fire Extinguisher use; Remove Security tag or pin, Test before use,

Aim hose or horn at base, Squeeze the handle.

Safe Working Procedure of Hand Tools

1. Use the right tool for the right job:

The weight, size, and type of tool should be selected to suit the job

being carried out. Using wrenches as hammers, using screwdrivers as

Page 45: PLC-Company profile

~ 45 ~

chisels and using knives as screwdrivers is not acceptable and is not

allowed.

2. Using defective or damaged tools:

Tools provided with wooden handles should always be used with the

handles intact. The handles should be tightened with wedges where

necessary. Split or broken handles should be replaced immediately.

Mushroomed chisels are a serious source of hazard and should be

ground down flat again. It is the responsibility of the user to report the

damaged tool to their supervisor and shall be inspected prior to use.

3. Keeping tools in the workplace in loose condition:

Hand tools should not be allowed to lie on work benches, scaffolds, etc,

where they can fall. Sharp tools like chisels should not be kept in

pockets. Hand tools shall not be held in hand while climbing up

ladders, use a tool belt. Tools should never be thrown up or down from

working platforms. While working at critical locations, avoid any

accidental slippage of tools from the users hand, secure it with wire.

4. Using tools in wrong ways:

Wrenches should always be placed on the nut with the jaw opening

facing the direction in which the wrench is to be rotated. Wrenches

should not be pushed but pulled. Chisels being struck by others should

be held by tongs or other holding equipment. While using screwdrivers

the object should not be held in hand. Blades of hacksaws should

always point forward and the stroke should be steady and firm to

avoid jumping of blade.

5. Using cutting tools: Always cut away from your body and hand and

have a firm grip to prevent slipping.

6. When you have finished work for the day, take your tools back to the

stores or your toolbox where they can be stored correctly. Do not

leave hand tools lying around for fellow workers to stand on or trip

over.

Page 46: PLC-Company profile

~ 46 ~

Hot Works Procedures

Hot works permits are designed to prevent fire, property damage and

personal Injury. They are a way of controlling any hot works, with an

inspection of the work area to reduce the risk of fire.

Any Hot works that produces a flame, spark or generates serious

amounts of heat will need a Hot works permit.

1. Before any work with a grinder, welder or Gas cutter has started, you

must speak to your Foreman who can then arrange a Hot works permit

for the task you are about to start. DO NOT START THE WORK WITHOUT

A HOT WORKS PERMIT.

2. The area you are working in will need to be free of all flammable items,

such as, paper, cardboard boxes, wood, any solvents, paints etc. a spark

from a grinder can ignite the vapours of solvents instantly.

3. You will need fire fighting equipment with you such as a fire

extinguisher and water in case of fire start.

4. The permit asks if you have the correct PPE, such as Safety glasses,

gloves, full coverall, dusk mask, etc.

5. The permit is valid for one day and the timing of works will need to be

added i.e. 10am to 2pm.

6. If your work is over a few days you can extend the permit for a

maximum of 3 days before a new permit is needed but speak to your

Foreman at the start of each day to ensure the permit is up to date.

7. Once you have finished the work, report to your Foreman who can

then officially close the permit, it will need signing by a Safety Officer.

8. Any questions regarding Hot Works permits, please speak to your

Safety Officer for the tower you are working on.

Page 47: PLC-Company profile

~ 47 ~

Housekeeping

1. Good housekeeping and site tidiness is essential in an accident

prevention programme and is part of your daily duties with cleanup

being a continuous procedure.

2. It is everyone’s responsibility for an accident free tidy clean site.

3. Once a week there should be extra effort made to tidy the work area

ready for the following week.

4. Work areas, passageways and stairways should be kept clear of all

debris and materials at all time, no excuses.

5. Site Storage areas shall be kept clean and tidy with work materials

neatly stacked or placed.

6. Safe Walkways and other areas where personnel travel should be kept

clear at all times to prevent personnel from using shortcuts and areas

where there is site vehicles.

7. Ensure that all temporary extension leads, wires, electrical cables,

hoses and other equipment shall be kept off all walking surfaces.

Cables, wires, hoses etc shall be elevated above walking surfaces and

other areas where personnel travel and work. Electrical cables shall

not be allowed to lay or rest in water.

8. Spills of oils, grease, cement or any other materials shall be cleaned up

immediately to prevent tripping/slipping and risk of fire.

9. Excess scraps, off-cuts and waste materials shall be collected and

disposed off in the appropriate waste bins.

10. Housekeeping is essential for the safe access/egress in the event of an

emergency situation when all personnel have to be evacuated from

the work area.

Page 48: PLC-Company profile

~ 48 ~

Supervisors, Foreman& Charge hands Responsibilities towards their

workers

• Assign jobs/tasks to crew and ensure all personnel on site comply

with Company regulation and perform their tasks in accordance with

approved procedures.

• Interact with Customer Representatives at site on all day-to-day

operational matters.

• Safety Focal Point at the site for the operation.

• Bring to the attention of line Management (Managers) potential

hazards to Safety, Health and Environment, which cannot be resolved

by him.

• Ensure that all the crewmembers in the work location are aware of

their responsibility to report immediately any unsafe plan or system

of work and in turn inform the Superintendent accordingly.

• Ensure that all accidents, Near Miss incidents are reported

immediately as per the correct procedures.

• Ensure equipment and associated tools are in good working condition.

• Promote safety awareness in his subordinates.

Employees

• Ensure the work is carried out in accordance with the policy,

procedures and operating practices.

• Manage and maintain the Company equipment / tools and conduct

Pre and Post job maintenance.

• Ensure and follow all the Safety and Operation guidelines specific to

the work location and nature of the job.

• Report any accident/incident to the Site Supervisor immediately.

• Participate in all company organized training programmes and attend

all Safety meetings.

Manual Handling

Manual Handling Accidents account for more than a third of all accidents

reported each year on Construction sites. While fatal manual handling

accidents are rare, accidents resulting in major injury are very common.

Page 49: PLC-Company profile

~ 49 ~

The most reported manual handling accidents are strains to the back; the

second is injury to fingers and third is injury to the upper limbs.

1. Think before lifting or handling. Plan the lift, ask yourself where am I

taking the load, do I need help, how far have I got to carry it, do I need

gloves, etc.

2. When you pick up load, bend legs and lift in one smooth motion, do not

snatch or jerk load into carrying position. Keep back straight at all times.

3. Think about who is around you when you lift the load is going to hit

anyone when you begin the lift.

4. When lifting, ensure you have a good hold on the load and hug it as

close to the body to support it.

5. The maximum that one person should lift is 25kg but if load is lighter

but very bulky, get help.

6. When carrying a load look ahead, don’t look down, you can easily trip

or fall and injury is often worse when carrying load.

7. Avoid twisting the back, reaching or leaning sideways when carrying

load, this puts pressure on the base of the spine.

8. If you are carrying a long load i.e. conduit, point the front end of the

load up so you don’t carry at head height.

9. Use the lifts or hoist to avoid carrying load up stairs.

10. When lowering the load, once again keep your back straight and bend

the legs to avoid pressure on the spine.

Power Tool Inspection

Always keep power tools in their correct boxes, do not leave them lying

around, they can easily be stood on, tripped over, kicked or damaged

very easily. When issued your power hand tool please follow out these

checks before any work commences.

Page 50: PLC-Company profile

~ 50 ~

1. Make sure you have the right power hand tool for the job you are about

to execute.

2. Check the condition of any attachments you are using with the power

hand tool, if they are damaged in any way or blunt, report it to your

Foreman.

3. Check condition of Cables, if there are any splits or breaks exposing

wires, report it to your Foreman immediately.

4. Check condition of plug and socket you are about to use, if there are

any cracks or loose wires, report it to your Foreman immediately.

5. Check condition of the Body and Handle of power hand tool. If there

are any cracks or pieces missing including screws, report it to your

Foreman straight away.

6. Check the trigger operation; it should immediately slow down as soon

as you release the trigger, if not, report it to Foreman straight away.

7. Be aware of where your cables are laying i.e. do not let them lie in

water; try to put them above head height if possible.

8. Check that all circuit breakers are in place, if not, report it to your

Foreman immediately, and do not start work without them.

9. Check that you have the right colour code for the month you are in, if it

isn’t report it to your Foreman immediately.

10. Always hold the power tool with 2 hands and hold firmly, do not put

all your weight onto the drill. The handle must be in place.

11. Do not use a drill as a jack hammer, even if it is for a few seconds.

12. Do not lower your power tool to the ground by the electrical cord;

always place it on the ground by holding the body.

13. Always disconnect from the main power source before changing drill

bits or Hilti bits.

Page 51: PLC-Company profile

~ 51 ~

Wearing Personal Protective Equipment

1. Never go to the site without your basic Personal protective equipment

i.e. Helmet, Safety Shoes and full Coverall and report any defective

equipment immediately.

You should never throw or drop your helmet, if the shell has cracks or

deep scratches, replace it immediately. Do not paint your helmet as

this weakens the plastic.

Safety footwear should be maintained in good condition, checked

regularly and discarded if worn or deteriorated. Laces should be

checked and replaced if necessary. Materials lodged into the tread

should be removed. The stitching should be checked for loose, worn or

cut seams. Boot polish will help preserve your boot and gives extra

protection when wet.

2. When collecting any tool or work equipment from the stores think

about what Personal Protective Equipment you will need to

successfully and safely complete the job.

3. When grinding, disking, chasing and using a jack hammer, always wear

protective eye wear and do not start work until fellow workers have

moved to a safe distance. Make sure the lenses are clean as dirty and

scratched lenses restrict vision. Safety glasses should always be put in

a safe place at the end of the day to protect them.

4. If dust is produced from grinding, chasing, disking or using a jack

hammer, wear a dust mask and replace it regularly.

5. If you have to shout to have a conversation at a 1 meter distance from

the work equipment you should be wearing Ear defenders.

6. If you are using your hands in danger areas, i.e. using a hammer and

chisel, always wears gloves to prevent cuts and abrasions, make sure

they fit well and are not loose so that you can grip tools.

7. Look after your personal protective equipment; it could save your life.

Page 52: PLC-Company profile

~ 52 ~

Safety Signs

1. Red circle with diagonal line through the middle = Prohibition, You are

not allowed to do.

• No Smoking.

• No Swimming.

• No Authorized access.

2. Yellow triangle with black border = Warning, Risk of Danger ahead.

• De-Shuttering overhead.

• Electricity.

3. Green square with white writing = Safe condition, the safe way.

• Assembly Point.

• Fire Exit.

4. Blue circle with white writing or symbol = Mandatory, You must do.

• Use Filter Mask.

• Wear Safety Goggles.

• Wear Safety Harness. 5. COSHH Information = Symbols and wording.

• Toxic, if swallowed.

• Dangerous to the environment, dispose of correctly when finished.

• Highly Flammable, no naked flames or sparks, fire extinguisher

must be present.

• Irritant, must wear gloves, absorbed through the skin.

Scaffolding - General Access Scaffolds

For any scaffolds make sure:

• It is designed, erected, altered and dismantled by competent

personnel and the work is directed by a competent supervisor.

Scaffloders should always adopt methods of work to prevent falls

during the erection of scaffolding. This will normally mean wearing

harnesses.

• It should never be erected over personnel who are working or

pedestrian areas.

Page 53: PLC-Company profile

~ 53 ~

If the work presents a danger to the public, it should be done

during quiet times, e.g. early mornings or the pedestrian area

should be closed with a diversion provided.

• It is based on a firm level foundation. The foundation or ground

should be capable of supporting the weight of the scaffold and any

loads likely to be placed on it. Watch out for voids such as

basements or drains, or patches of soft ground, which could

collapse when loaded, provide extra support if necessary.

• It is braced and tied into a permanent structure or otherwise

stabilized. Rakers only provide stability when they are braced and

secured adequately; single-tube rakers alone do not provide this

and need to be braced to prevent buckling. Put ties in place as the

scaffold is erected and only remove them in stages as it is struck. If

a tie is removed to allow work to proceed, an equivalent tie should

be provided nearby to maintain stability. Always erect and tie

according to the manufacturer’s instructions.

• It is capable of supporting loads likely to be placed on it. Scaffolds

are not normally designed to support heavy loads on their working platforms. If intending to load out platforms, tell whoever is

providing the scaffold – a special design might be required. Most

work at height falls into 3 categories: light duty, medium duty and

heavy duty; obtain the class of scaffold appropriate to the work you

are doing.

• You never sheet a scaffold without informing the supplier.

• Platforms are fully boarded and wide enough for work and easy

access.

• Scaffold boards are fully supported and not overhanging excessively.

• There is a tied safe ladder or other easy safe access/egress to the

work platform.

• It is suitable for the task before it is used and checked whenever it

is substantially altered or adversely affected by, for example , high

winds.

Site Safety Rules

1. Use Personal Protective Equipment at all times, Helmet, Shoes,

Coverall, Glasses, Dust mask, gloves and Ear defenders. Do not throw,

drop or paint your safety helmet, keep it in a safe place.

Page 54: PLC-Company profile

~ 54 ~

2. Use Safety harness on all working platforms or scaffolds. (Regulations

state anything over 2 meters) attach harness as high as possible and

check condition of buckles, clip and rope before you use it. Always

attach the harness before you move into danger area.

3. Do not work in an area where there is no edge protection unless you

can attach a safety harness to a life line or tower.

4. Use correct sockets for power tool connections and cable joints. Check

colour code for month.

5. Always use Safe designated walkways onto site and towers and do not

use short cuts.

6. Report immediately any damaged or defective tools/wires to your

supervisor and return them to the stores.

7. Do not operate any plant vehicles; this also includes personnel

lifts/hoists.

8. Do not attempt to move any ladders or scaffolds without your

supervisor’s permission. Always check Scaff-tags are up to date before

using scaffold.

9. Do not move Mobile scaffold towers with personnel on working

platform, they can easily tip over.

10. Do not attempt to make any electrical repairs, call a qualified person.

Do not remove any safety device e.g. circuit breakers without

permission from supervisor.

11. Use the right hand tool for the right job and in accordance with

manufacturing specifications. Do not use mushroomed chisels or loose

hammer handles.

12. Do not smoke inside the work premises, other than designated

Smoking areas, obey all “No Smoking” signs

13. Do not enter areas where de-shuttering is taking place or areas that

are sealed off with warning tape.

Page 55: PLC-Company profile

~ 55 ~

14. Never work in the bottom of lift shafts.

15. When using stepladders do not stand on the top step, keep 1m below

the top. You must have another person holding stepladder when

working at height at all times.

16. Do not use a Stepladder next to an edge, once you are at working

height you will be above the edge protection, use mobile tower

scaffold instead with a safety harness.

17. Always hold power tools with both hands and do not put all of your

weight onto drill.

18. Always ensure Grinders have guards fitted and use at arm’s length to

prevent entanglement with coverall and do not use unless handle is

attached.

19. For immediate First aid treatment, contact your Foreman who will

then contact an Omega First aid Rep. If serious injury has occurred do

not move the injured person, the first aid rep will come to you.

20. In the event of an emergency evacuation, please go to your towers

nearest assembly point.

If you are unsure of any site safety rules, please speak to your Tower

Safety Officer.

Stepladder Safety

Stepladder accidents are very common due to errors that can easily be

avoided.

1. Do not work from the top of the stepladder, always keep 1 meter from

top so you can support yourself. Change the height of stepladder if you

cannot reach.

Page 56: PLC-Company profile

~ 56 ~

2. Always have another person hold the stepladder when working at

height. Never let go of a stepladder when a fellow employee is working at

height, if a tool is needed to be passed to the worker, make them come

down to collect.

3. Never work near an open edge, when you are at working height you

will be above the edge protection. Use a Mobile Tower and a Safety

Harness

4. In open spaces where you can erect a Mobile Tower Scaffold, never use

a stepladder. Mobile towers are a lot safer and can be moved very easily.

5. Do not reach or stretch while working from a stepladder, they are not

designed to accept side loads.

6. No more than 1 person should use a Stepladder at one time.

7. Regular inspection is required; if there are any serious dents or bends

in the frame do not use and always ensure the rubber feet are present.

8. Stepladders should always be used on a level, firm base.

9. Do not sit on the top step while working; you can easily fall over

backwards.

10. Do not climb from one side of stepladder to the other while at height,

you can easily fall.

11. If a fellow employee suffers a fall from height do not move him,

contact your Foreman who can arrange for a First Aid Representative to

come to the injured person. You can cause further injury by moving them.

Summer Safety Alert

With summer already upon us, all of us need a reminder of heat stress

tips for the safety and well being of co-workers and family members.

1. Drink cool water – anyone working in a hot environment should drink

cool water in small amounts frequently – one cup every 20 minutes.

Avoid alcohol, tea, coffee and other caffeinated drinks which will cause

dehydration.

Page 57: PLC-Company profile

~ 57 ~

2. Dress appropriately – wear lightweight, light colour, loose fitting

clothing and change clothing if it gets completely saturated. Use

sunscreen and wear a hat when working outdoors.

3. Work in well ventilated areas – all work places should have good

general ventilation as well as spot cooling in areas of high heat

production.

4. Work less, rest more – assign a lighter workload and longer rest

periods during the days of intense heat. Short frequent work/rest cycles

are best.

5. Ask how workers are feeling – monitor workplace temperature and

humidity and check workers response to heat. Be alert to early signs of

heat related illnesses and allow workers to stop their work for a rest

break.

6. Know the signs – learn to spot the signs of heat stroke, which can be

fatal. Get emergency medical treatment immediately. First Aid reps will

recognize and treat signs of heat stress, heat cramps and heat stroke.

7. Reduce work for anyone at risk – use common sense when

determining fitness for work in hot environments. Lack of

acclimatization, age, weight, and poor physical condition, and inadequate

rest, previous history of heat illness, certain medical conditions and

medications are just some of the factors that increase susceptibility to

heat stress.

8. Check with your Doctor – anyone with a medical condition should

check with their Doctor before working in hot environments.

9. Eating Habits – eat more frequently ensuring meals are light and

nutritious.

10. Remember – the best defence against heat related illness is

prevention. Staying cool, drink plenty of fluids, wear cool clothing and

monitor outdoor activities are all key factors to staying healthy in hot

environments.

Page 58: PLC-Company profile

~ 58 ~

Temporary Mobile Tower Scaffolds

Tower scaffolds can be erected easily and quickly and can give good

access. However, they are involved in numerous accidents each year.

These accidents usually happen because the tower has either not been

erected properly or has not been used properly.

If a tower is going to be used:

1. Follow the manufacturer’s instruction for erection, use and

dismantling. Have a copy of the instruction manual available – if the

scaffold has been provided by another contractor they should provide

the information and attached Scafftag.

2. The tower should be vertical and stand on firm, level ground with the

wheels locked.

3. Scaffold equipment should be in good condition, free from twists or

dents.

4. Provide a safe way to get up to and from the work platform, for

example internal ladders. Climbing up the outside of the tower can pull

it over.

5. Provide edge protection (guard rails and toe boards).

6. Tie the tower rigidly to the structure if it is possible or if you are

exposed to high winds.

7. Always check the Scafftag before using Mobile Tower Scaffold, if it is

not up to date speak to your Charge hand or Foreman.

Do not:

1. Use a ladder or stepladder on the working platform or apply other

horizontal loads that could tilt the tower.

2. Overload the working platform.

3. Move the tower by applying force at the platform level.

4. Climb up the outside of the tower to reach the platform.

Page 59: PLC-Company profile

~ 59 ~

When moving a mobile tower:

1. Check there are no power lines or overhead obstruction in the

way.

2. Check there are no holes or dips in the ground.

3. Do not allow people or materials to remain on tower as it trips

over very easily when moved.

Using Safety Harnesses

Falls from height are the largest cause of accidental death in the

construction industry. They account for 50% of all fatalities. Most

accidents involving falls could be prevented if personnel were wearing a

safety harness.

1. Health and Safety Regulations state, where work is carried out at

height, every employer shall take suitable and sufficient measures to

prevent any person falling a distance liable to cause personal injury.

2. Never work in areas where there are no safety barriers and no

temporary lifelines or barriers to attach a safety harness to.

3. Before you put a safety harness on, check its condition. Check the

webbing, lanyard and D-ring. If there are any tears, cuts or cracks, do not

use and if harness has had paint or thinners replace it as the chemicals

will weaken the Harness.

4. If you have never worn a safety harness before, check with your charge

hand, Foreman or safety officer for correct fitting.

5. Check the lifeline wire or rail that you are fixing your safety harness to

is secure, if you have any doubt, do not connect, and check with safety

officer.

6. When connecting safety harness, make sure you are in a safe position.

Do not move into danger area until safety harness is fixed.

7. Make sure there is adequate fall height to prevent you from hitting the

ground.

Page 60: PLC-Company profile

~ 60 ~

8. When connecting safety harness, connect the clip as high up as

possible, thus reducing the fall distance.

9. Remember, a fall with a safety harness will not stop you from getting

injured, most falls with a harness on result in injury from hitting parts of

the building or impact load to the body when the line goes tight.

10. Consider how to recover anyone who does fall.

Page 61: PLC-Company profile

~ 61 ~

QUALITY ASSURANCE AND QUALITY CONTROL

I N D E X

1.TERMS AND DEFINITIONS

2.GENERAL

- Project Summary

- Project Key dates

- Project objective

- Project Scope

3.EPC Quality Management System

- Purpose

- Scope

- Distribution

- Project Quality Statement and Objectives

- Job descriptions

- Management and Quality improvement Reviews

- Quality System

4.Contract Review

5.Design Control

6.Document Control

7.Control of purchased materials and Services

8. Control of customer supplied material

9. Product identification and Traceability

10.Process Control

Page 62: PLC-Company profile

~ 62 ~

11.Inspection and testing

12.Control of Inspection, Measuring and Test

equipment

13.Inspection and Test Status

14.Non conformance and corrective action

15.Handling storage preservation and Delivery

16.Quality Records

17.Internal Quality Audits

18.Training

1. TERMS AND DEFINITIONS 1. TERMS AND DEFINITIONS 1. TERMS AND DEFINITIONS 1. TERMS AND DEFINITIONS

For the purpose of this Quality Plan and supporting procedures the

following definitions which, in some instances, clarify those contained

within ISO 8402 (Quality Management and Quality Assurance —

vocabulary) shall apply:

TERMS / ABBREVIATIONS DEFINITIONS

Quality

The totality of features and characteristics of a

product or service that bear on its ability to

satisfy stated or implied needs.

Quality Management The aspect of the overall management functions

that determines and implements the quality

policy.

Quality Assurance All those planned and systematic activities and

functions necessary to provide adequate

confidence that a product or service shall satisfy

given requirements for quality.

Quality Control The techniques and activities that demonstrate

compliance with specified requirements. This

Page 63: PLC-Company profile

~ 63 ~

includes inspection, test, etc.

Project Quality Plan A document derived from the Quality

Management System, modified as necessary to

accommodate particular project requirements.

QC Test and inspection

plans

A key document which supports the Project

Quality Plan and lists in a logical sequence key

activities such as contract review, engineering,

procurement, construction, installation, and

commissioning activities, etc. It identifies

individual activities, controlling procedures /

standards, verifying documentation, inspection

and test requirements, etc.

Project Control

procedures

A document which supports the project Quality

plan and describes the procedures for various

activities of Quality system.

Quality Audit

A systematic and independent examination to

determine whether quality activities and related

results comply with planned and/or Documented

arrangements and whether these arrangements

are implemented and effective in achieving stated

objectives.

Supplier Refer to “Supplier “includes for subcontractors

TERMS/ABBREVIATIONSTERMS/ABBREVIATIONSTERMS/ABBREVIATIONSTERMS/ABBREVIATIONS DEFINITIONSDEFINITIONSDEFINITIONSDEFINITIONS

Product Result of activities or processes and

encompassed hardware, software, processed

materials and services or any combination of

these.

Page 64: PLC-Company profile

~ 64 ~

WEP Work Execution Plan

QP Quality Plan

HSE Health, Safety and environment

QA/QC Quality Assurance / Quality Control

EPC Engineering, Procurement & Construction

ISO International Standards Organization

ITP Inspection and Test Plan

WI Work instruction

P0 Purchase order

NDT Non Destructive Testing

S/S Substation

T and D Transmission and Distribution

MRT Management Review Team

OHL Over Head Line

PCP Project Control Procedure

T/L Transmission Line

WSW Water Supply Well

DEP Design Engineering Practice

LCS Local Control Station

CDS Central Degassing Station

For further definitions of Quality or vocabulary refer to BS 4778 Para 1.

Page 65: PLC-Company profile

~ 65 ~

2. GENERAL2. GENERAL2. GENERAL2. GENERAL

Project Objective::::

The main objectives of the OHL Projects are:

-To design and construct a lattice steel tower OHL utilizing, where

possible, double circuit lines for common routes and single circuit lines in

other areas . When fully commissioned, this will be a replacement for the

existing overhead lines on wood poles.

-To provide a suitable Transfer – Bus arrangement for flexibility of

operations of clusters in case of outage of any buffer transformer.

Project Scope::::

-Design / Material

-Construction

3. Quality Management System3. Quality Management System3. Quality Management System3. Quality Management System

Purpose:Purpose:Purpose:Purpose:

The purpose of this project Quality plan is to establish specific quality

requirements of customer and ISO 9001 against which the construction

of new Transmission Line and Associated Modifications shall be

organized and managed to ensure the project objectives are achieved and

the PLC Quality Policy is complied with.

The Quality plan is the first level of the overall project quality

management system structure and provides the means by which PLC

management and its customer may gain confidence that the work under

taken for each of the project work phases satisfies the contract and PLC

(T&D) overall requirements for Quality management.

Scope:Scope:Scope:Scope:

The quality plan addresses the requirements of the following

specifications.

Contractual requirements to PLC.

Page 66: PLC-Company profile

~ 66 ~

PLC Quality Assurance Manual

HSE and Regulatory requirements

ISO 9001:1994.

Distribution:Distribution:Distribution:Distribution:

This Quality plan is issued as an integral part of the WEP and controlled

and issued by Project Manger as per the document & data control

procedure.

Project Manager shall be the custodian of Quality documents and shall be

responsible for amendments and distribution.

It is the responsibility of QC personnel to report any deficiencies or

problems resulting in the use of this Quality plan to Project Manager.

Project Manager is responsible for resolving Quality issues in a timely

manner to the satisfaction of Customer representative.

Project Quality statements and objectivesProject Quality statements and objectivesProject Quality statements and objectivesProject Quality statements and objectives

Quality Policy.Quality Policy.Quality Policy.Quality Policy.

To be the leader in Engineering, Procurement, Installation and

Commissioning of Electrical Substation, Transmission and Distribution

network as per the National / International Standards to meet the

specified Quality requirement.

Quality Objective:Quality Objective:Quality Objective:Quality Objective:

Planning, implementing and monitoring all Quality system activities

during tendering, Designing, Procurement and Project Management.

Planning implementing, Controlling through auditing and continuous

monitoring the Installation, Testing and commissioning activities to meet

customer requirements including safety.

Work for continuous improvement of Quality system and processes

through reviewing their adequacy and effectiveness.

Page 67: PLC-Company profile

~ 67 ~

Provide and promote Quality awareness at all levels through continuous

training to ensure that the company policy and Quality Requirements are

well understood, implemented and maintained.

Independent Testing AgencyIndependent Testing AgencyIndependent Testing AgencyIndependent Testing Agency

The Third Party Independent Testing Laboratory approved by (i.e. Soil

Compaction Tests / Concrete sampling, Compressive Tests, etc) PLC /

Customer shall be responsible for carrying out all on-site tests, as

directed by the Project Manager and his Inspectors. All tests that fail to

meet the requirement shall be immediately reported to the Project

Manager for corrective action. The testing laboratories to be used in this

project are approved by Customer for all required Civil Testing and non-

destructive examination respectively.

Management and Quality improvement Reviews:

Project reviews shall be undertaken periodically and shall report on

quality related concerns encountered. The causes shall be recorded and

investigated and improvements shall be implemented.

Reviews shall consider the results of audits undertaken on the system,

including references to any significant deficiencies or weakness as

identified in the system.

MRT shall conduct a review at least once in a year by.

Deputy General Manager

Reviews shall normally involve following members,

Project Manager, Procurement Manager

Engineering Manager, Applicable department staff Customer if

necessary and any other person as directed by DGM

Reviews shall be recorded and shall determine action needed to amend

project Execution procedures as require suitable guidance as per

contract shall be followed.

Quality System

Page 68: PLC-Company profile

~ 68 ~

Project Quality Management StructureProject Quality Management StructureProject Quality Management StructureProject Quality Management Structure.

The Quality Management system documentation for the construction of

Transmission Line and necessary modification project is established in

three levels. General guidance taken from Customer Standards /

Specifications.

FIRST LEVEL DOCUMENT — PROJECT QUALITY PLAN.

The project Quality plan is the First level document of the project Quality

Management system. PLC shall use the Co-ordination procedure &

ITP/QC procedures included in the contract. Specific procedures not

already foreseen in the contract will be prepared by PLC & submitted to

Customer approval before implementation.

The project Quality plan is the guidance document for the site Inspection

and test plans prepared and implemented by PLC (T&D) and reference to

control procedure documents

SECOND LEVEL DOCUMENTS — PROJECT CONTROL PROCEDURES

The project control procedure which is included as Attachment III (for

procedures prepared by PLC) to the Quality plan identifies those control

procedures which shall be followed at various stages of the project in

order to control the specified quality related activities and methods to

ensure compliance.

All project procedures shall fulfil the contract quality requirements.

These procedures and specifications shall have specific project

identification and any changes to these control procedures are indexed in

cover sheet.

THIRD LEVEL DOCUMENTS — INSPECTION.

QC Inspection and Test plans shall be developed to cover the full range of

activities required to cover the contract scope of work during

construction, testing and commissioning stages. The Inspection and test

plans shall identify the Quality activities to be verified, recorded and the

acceptance criteria.

Page 69: PLC-Company profile

~ 69 ~

The formats shall be developed for all critical activities and shall include

the parameters to be verified during various stages of project and shall

form the evidence for having verified the parameters of specific activity

performed.

AvailaAvailaAvailaAvailability:bility:bility:bility:

The control and distribution of the documents shall be dealt as per

procedure Document and Data Control.

A copy of all project documents (e.g. Drawings, Scope of work, quality

plan, P.O etc) shall be available at Job Site. The control and distribution of

the quality records shall be as per Quality Records Procedure.

4. Contract Review

During the bid preparation stages and following contract award the

contract documentation shall be reviewed, on an ongoing basis, by

nominated personnel, to enable the specific contract requirements to be

identified and understood and for any queries, ambiguities, errors, etc, to

be clarified, resolved with customer. The capability of the company to

meet the requirements of the contract to be ensured at tenders / contract

stage

5. Design Control

The following describes the general requirements for the control of

design activities and review of engineering information to ensure design

integrity, safety and compatibility with the Contract requirements.

Design Control shall be maintained in accordance with the appropriate

project procedure listed in the project control procedures.

Design interfaces shall be established between interfacing Design Offices

and shall generally be in the form of document transmittals, technical

queries, meetings, reviews and correspondence.

Page 70: PLC-Company profile

~ 70 ~

Design Input, Development PlanningDesign Input, Development PlanningDesign Input, Development PlanningDesign Input, Development Planning

Design shall be in compliance with Customer Specifications Engineering

Standards Industry Codes, Standards, Legislation and nominated Project

Procedures.

This Contract shall use drawings/documents approved by Customer. PLC

shall examine such documents and identify any areas of conflict or

missing information and establish record or verify data and information

necessary for the design of the Project facilities, for the construction

work at Site.

Design deliverables and associated required by dates shall be identified

and their development progressively monitored.

A key design deliverable at this stage is the Discipline Job Design

Specification prepared by each Engineering discipline and which includes

project specifications and quality procedures.

Design OutputDesign OutputDesign OutputDesign Output

Design output shall be verified by a formal system of

Checking, review and approval to ensure the input

Requirements are met, contain or reference acceptable

Criteria conform to the Contract requirements, and that all

characteristics of the design which are crucial to the safe and proper

functioning of the supplied plant are fully incorporated.

Design VerificationDesign VerificationDesign VerificationDesign Verification

PLC shall use the Customer Specifications and Procedures in addition to

its own Company Procedures and Instructions to control and verify the

design of the plant in order to ensure that the specified requirements are

met.

Design deliverables shall be subjected to a verification check and

approval, by nominated independent function(s).

Page 71: PLC-Company profile

~ 71 ~

The review of the development of the design shall be carried out by

customers if specified in the contract.

Safety and Environmental reviews shall be scheduled and implemented.

Design Change ControlsDesign Change ControlsDesign Change ControlsDesign Change Controls

Design changes shall be controlled by procedure to ensure that:

Information concerning the design changes is transmitted to all affected

persons in a controlled and timely manner.

The technical impacts of changes are considered and required actions

documented.

All the design changes shall be approved by customer. The design

changes shall be formally agreed technically and contractually with PLC.

As built drawings / Dossier:As built drawings / Dossier:As built drawings / Dossier:As built drawings / Dossier:

As built drawings shall be prepared in sufficient details to present an

accurate record for the customer.

As-built drawings and records are required where the equipment / items,

construction varies from the “Final Certified” drawings approved by

Customer.

The final project completion Dossier in 5 Sets shall include:

-Vendor documents including “Operation and Maintenance Manuals”.

-Final approved “As-Built” Drawings.

-MRB (Manufacturing Record Book).

6. Document Control

Receipt, Issue, Storage of DocumentsReceipt, Issue, Storage of DocumentsReceipt, Issue, Storage of DocumentsReceipt, Issue, Storage of Documents

The receipt, issue, indexing, filing, storage and changes to the Project

documents shall be controlled at all times.

Document Control shall ensure that records of receipt, description,

revision, numbering and distribution are maintained. The distribution

Page 72: PLC-Company profile

~ 72 ~

requirements for each type of document shall ensure the correct edition

of each document is issued to the department or workplace conceded

prior to performance of the activity. Registers of control may be

computer or manually generated.

A transmittal system shall be used for the internal and external

movement of all documents covering Suppliers, Subcontractors and

Customer.

Documents shall be filed and stored for such time as specified and in such

a way as to enable their efficient retrieval and prevent their

deterioration.

Changes and Revisions to DocumentsChanges and Revisions to DocumentsChanges and Revisions to DocumentsChanges and Revisions to Documents

All changes and revisions to documents shall be processed in the same

manner as the original. Revisions shall be clearly identified.

Documents which are subsequently cancelled or superseded shall be

clearly marked as such or shall be removed from the workplace.

The control of drawings / documents issued to Sub-Contractor shall be

controlled in the same manner mentioned above.

7. Control of Purchased Material and Services

GeneralGeneralGeneralGeneral

PLC shall ensure that procurement activities are performed in

accordance with contractual requirements which include;

Customer Specification and Standards.

Project Specifications, Bill of Quantities (BOQ)

All Applicable Codes, Specifications, Standards & drawings.

PLC shall provide & document QA/QC activities in the procurement of

equipment & material to be used or installed during construction.

Page 73: PLC-Company profile

~ 73 ~

Depending on the criticality inspection of the materials, the PLC /

Customer representative or Customer approved 3rd party inspectors

shall perform QA / QC activities at suppliers and sub supplier’s locations.

Purchasing DataPurchasing DataPurchasing DataPurchasing Data

PLC QA/QC Design will review the purchase requisitions and purchased

orders prior to placement for technical, quality requirement.

PLC shall ensure relevant technical and inspection requirement are

passed on to suppliers / sub suppliers.

Customer shall have access to all Purchase Order Inspection Report files.

Procurement Plan shall be prepared including planned and actual dates

for Inquiring P.O., Expected date of Delivery (ETD) and Expected Time of

Arrival at site (ETA).

Review of requisition packages to ensure that Customer requirements

which include but are not limited to standard drawings and project

specifications are in place and accepted at quotation stage.

Selection of Suppliers and SubcontractorsSelection of Suppliers and SubcontractorsSelection of Suppliers and SubcontractorsSelection of Suppliers and Subcontractors.

Suppliers’ selection shall be in accordance with the following points.

- Past experience with PLC.

- Suppliers / sub-contractors approved by Customer on previous

projects.

- Approved vendors

- Verification of Purchased items / Services

PLC shall ensure that the drawings, specifications, inspections

requirements and QA/QC programs are properly transmitted to

suppliers.

The project shall relay on the selected assured suppliers indigenous

quality assurance and quality control activities to deliver equipment and

materials which satisfies the P.O requirements to an extend

Page 74: PLC-Company profile

~ 74 ~

commensurate with the confidence built by each supplier during the

selection process.

The quality assured suppliers selected by PLC for major products must

ensure that their sub-suppliers meet the requirements of established

quality management system and customer approval if any.

Verification by inspection and/or audit that product and service comply

with the purchase order shall be performed to an extent consistent with

the quality level of previous supplies.

Control of Manufacturing Process:Control of Manufacturing Process:Control of Manufacturing Process:Control of Manufacturing Process:

Prior to start of the applicable works PLC shall submit suppliers details to

Customer Representative.

Inspection and testing of purchased materials shall be in line with

applicable project Quality Procedure.

The sub-contractors / suppliers shall submit manufacturing and test

reports for major items. These documents shall be verified and accepted

by PLC before issuing to Customer.

8. Control of Customer Supplied Material

Equipment and materials supplied or assigned to the PROJECT, by or on

behalf of Customer if any, shall be inspected, stored and maintained in

accordance with Customers requirements as appropriate, so as to

establish and preserve the manufactured quality of the item

9. Product Identification and Traceability

The requirements for Materials and Equipment identification and

traceability e.g. Identification tags, equipment number shall be as per

established and related procedures I specification, etc. Measures shall be

taken to ensure that such identification I traceability is maintained

throughout project work stages.

Page 75: PLC-Company profile

~ 75 ~

10. Process Control, Construction & Commissioning

GeneralGeneralGeneralGeneral

PLC shall ensure that all construction activities are performed in

accordance with the requirements of:

-Approved IFC (Issued for Construction Drawings)

-Approved Construction Procedures and Specifications

-PLC Quality Manual, Quality Plan, Inspection, Test Plan and Supporting

Procedures.

-When necessary, Special Quality Procedures & Method Statements

Control during installationControl during installationControl during installationControl during installation

PLC shall define their requirements in engineering specifications and

drawings which require various operations to be performed in

accordance with Drawings and Standards defined work practices and

approved QC inspection and Test plans.

Supplier’s management systems and documents shall be reviewed /

audited, checked to ensure requirements are being followed, and

inspections carried out to confirm compliance as necessary.

Installation of equipment on site shall be performed as per drawings,

work instructions Manufacturer recommendations which define the

activities to be performed, the responsible persons, any special

equipment involved, the essential verifications to be carried out and the

verifying documents to be produced. When critical work processes and

equipments are in use these shall be evaluated by authorized personal

and formally approved.

Where required to define the applicable level workmanship written

standard shall be established.

Special Processes.

Special processes, such as welding, non-destructive testing, protection

coating, Concrete batching, etc, where the results of the processes cannot

Page 76: PLC-Company profile

~ 76 ~

be fully verified by subsequent inspection and testing shall be performed

to approved procedures and the operators qualified in accordance with

applicable standards. Controlled equipment shall be used in special

process like control gauges, measuring equipment etc.

Qualification Tests Records or results for special processes, equipment

and personnel (e.g. welding, non-destructive Testing, etc.) shall be

maintained and available for verification by authorized personnel.

Welders shall be qualified in accordance with AWS D1.1. Qualification

tests shall be monitored by an independent testing agency approved by

Customer.

Welding procedures shall be qualified, prior to implementation, in

accordance with AWS D1.1 by a test laboratory.

Control gauges for special processes, e.g. measuring equipment, shall be

certified and approved and thereafter included in the calibration

programme.

Special working environments (e.g. humidity and temperature control,

clean room, etc.) shall be provided where required.

11. Inspection and Testing

Inspection at Works.Inspection at Works.Inspection at Works.Inspection at Works.

Inspectors shall be qualified and experienced to perform the inspection

functions required and shall meet the minimum requirement for the

project.

Where necessary PLC shall submit details and qualification of their in

house and field Quality Control personnel to Customer for acceptance.

Field resources shall include QC Inspection Agencies

Where specified in the contract PLC shall mandate the inspections and

tests to be performed by the Supplier/Manufacturer on equipment and

materials purchased for the project.

Page 77: PLC-Company profile

~ 77 ~

Inspections shall be performed in accordance with the requirements

detailed in Purchase Order, Quality Control Plans and approved

documents and drawings and procedure.

Customer and nominated third party inspection body, as applicable shall

be invited to witness the inspection. A Release Note issued by the PLC

Inspector based on the third party Inspection certificate / customer

acceptance report shall be the method by which equipment and material

is released ready for shipment to site.

Inspection at SiteInspection at SiteInspection at SiteInspection at Site

Organization Chart in Attachment-2 describes the functional site QC

reporting structure. The PLC QA/QC Manager will manage the provision

of site inspection services to support the construction work.

PLC shall submit details and qualification of QC resources to Customer

for acceptance including agency personnel.

All equipment and material arriving at site shall be inspected or

otherwise verified as conforming to specified requirement in accordance

with documented procedures.

To verify that the Project is constructed to the required standards and

specifications, PLC shall specify and carry out inspections and tests

during and at completion of, construction in accordance the documented

procedures. Each system test activity shall be formally verified by signed

documentation/certification.

Stage wise monitoring shall be done by PLC QC / Customer as per

Inspection and Test Plans.

Commissioning.Commissioning.Commissioning.Commissioning.

Testing and Commissioning shall be done in accordance with approved

procedures and records of Test Reports maintained

Inspection, Test and Commissioning Records

At all stages of the inspection, testing and commissioning process,

records shall be established and maintained which provide clear

Page 78: PLC-Company profile

~ 78 ~

evidence that equipment and materials have passed inspection and/or

test in accordance with defined acceptance criteria.

PLC shall maintain a non-conformance log of any rejections on material

and equipment, and shall investigate the causes of Non-conformance and

indicate corrective action.

Project Records / Documentation shall be submitted as per contractual

requirements.

12. Control of inspection, Measuring and Test Equipment

Control procedures shall be established to ensure that all inspection,

measuring and testing devices used in those activities affecting quality

are properly controlled and calibrated. PLC is not doing any in-house

calibration at present and the calibration shall be done by external

approved test houses and the certificate is maintained as the record of

calibration

Selection of measuring and test equipment shall be controlled to ensure

that such items are of the proper type, range, accuracy and tolerance to

conform to the specified requirements.

Measuring and test equipment shall be properly handled and stored in

order to maintain accuracy.

In the event that equipment is found to be ‘out of calibration’ items

inspected since the last calibration date shall be quarantined and

subjected to reverification as necessary. The instrument is taken out and

recalibrated.

13. Inspection and Test Status

Proper inspection and test status shall be maintained by way of labels,

check lists, inspection log book, and certificates in a logical, systematic

and progressive sequence, to the current inspection and test status of the

construction / installation to be determined at any time

Page 79: PLC-Company profile

~ 79 ~

No material or equipment shall be installed by PLC unless it can be

identified to a particular document that proves the item has been

inspected and has passed that inspection.

Additional Inspection, testing carried out if material to be used in the

Project cannot be identified or reasonable doubt exists about the

authenticity of its identity.

14. Non Conformances / Corrective Action

Project personnel shall have the responsibility for ensuring that any

deficiencies, ambiguities and problems are resolved to the satisfaction of

the project Quality team or QC. Copy of non-conformance / corrective

action report to be transmitted to Customer for information.

Non Conformances regarding the Quality system as identified by quality

assurance audits shall be formally recorded on Audit Finding Sheets and

progressively monitored and closed out by the Project Quality Assurance

Manager

Formal technical and safety audits shall be carried out by PLC personnel

and any non-conformance identified shall be resolved to satisfy the

requirements of Quality Management system.

Deviations to Customer’s contractual requirements shall only be allowed

with their approval. Identified deficiencies which relate to purchased or

subcontracted services shall be subject to rejection, rework or

acceptance with concession approval.

Customer complaints shall be formally addressed to ensure that

appropriate corrective action has been taken and that satisfactory

responses have been made. Non-conformance identified by inspection

and test during any work phase shall be subject to containment and

disposition, including approval by Customer as required.

15. Handling, Storage, Preservation and Delivery

Materials and equipment received shall be subject to receipt inspections

as detailed within the Material Control procedure to verify compliance

with the contract specifications

Page 80: PLC-Company profile

~ 80 ~

Any materials or equipment found to be non-conforming shall be

identified and marked as such and where practical, removed to a

segregated holding area. Materials and equipment shall be to a storage,

handling, maintenance and preservation regime which ensures the

integrity of the manufactured quality. Materials shall be periodically

examined prior to hand over to ensure that the maintenance and

preservation requirements have been carried out in accordance with the

manufacturer’s recommendations.

16. Quality Records

Records that furnish documentary evidence that the quality of items

produced and activities affecting quality are consistent with the contract,

procedures, codes and specification shall be systematically collated,

stored and maintained.

Records shall be indexed, filed and protected to prevent damage,

deterioration of loss. Records can comprise hand written, printed or

typed documents, magnetic tapes, disks, microfilm or other media

acceptable to Customer. Records which are Certificates shall comprise

original documents or authenticated copies.

Records shall be retained for the minimum period specified in the

contract, PLC procedures, or as required by law.

17. Internal Quality Audits

The Project Quality Management system shall be verified by a planned

programme of internal quality system compliance and technical audits

carried out by the Project QA/ QC Manager. The audits shall be conducted

in accordance with the project QA Audit Procedure.

Each project work phase shall be subject to audit the initial horizontal

audit to confirm / facilitate management system establishment and the

second, vertical multi discipline audits to confirm management system

Page 81: PLC-Company profile

~ 81 ~

maintenance. Audit schedules shall be submitted to Customer for review

and acceptance.

Quality Audits are a means of gauging the progress towards the required

objectives and should be seen as assisting the overall activity. Quality

Audits are required to be carried out in order to verify the documented

Quality Management Systems are being complied with.

Quality audits, as well as providing assurances that the activities are

being carried out in accordance with prescribed procedures, shall also be

proactive by identifying and facilitating solutions for any omissions or

deficiencies discovered within the established procedures and working

methods. The PLC QA/QC Manager shall, participate in, or implement, QA

audits of the Project.

Audit findings shall be collated and presented at management reviews to

establish the existence of any adverse trends and initiate any necessary

corrective actions.

18. Training

The Project QA/QC Manager, in conjunction with the senior project team,

shall identify and arrange induction sessions as necessary for key Project

personnel at which time the contents / requirements of this Quality Plan

shall be explained and discussed as well as any changes to the normal

method of working which have been identified for the Project.

Further the project team members shall communicate their work scope

and identify programmes, status and points of interest down below staff.

Training needs of all PLC employees shall be continually assessed to

establish training requirements necessary for their current work scope.

Suitable training shall be arranged as necessary.

Where specialist skills / qualifications are required (i.e. welding / NDT),

the need for such special training shall be reviewed and, if any needs are

identified, appropriate action shall be taken for this to be obtained.