FPA design present status FPA development planning
Drivers: High rigidity and mechanical stability Low mass (32+2 units are needed!) CCD temperature <-70 C, with passive cooling
PLATO Focal Plane Assemblies (FPA)
PLATO Kick off meeting November 2010
A preliminary design has been produced Design is mainly driven by interface constraints and budgets Design refinement still on-going
CCD (4x)
Thermal Strap (4x)
Flexi (4x)
Support Ring
Mask
Baseplate
Thermal StrapClamp (4x)
FPA design
3Roser Urqui
PLATO Kick off meeting November 2010
FPA design
4Roser Urqui
FPA
TOU
PLATO Kick off meeting November 2010
FPA design
5Roser Urqui
CCDs (detector side, 4x)
Thermal Straps (4x)
Support Ring
Mask
PLATO Kick off meeting November 2010
FPA design
6Roser Urqui
Baseplate
Thermal StrapClamps (4x)
CCD packages back side (4x)
PLATO Kick off meeting November 2010
FPA design
7Roser Urqui
Support Ring
Flexies (4x)
PLATO Kick off meeting November 2010
Current design is close to fulfill all requirements– First eigenfrequency 255 Hz (> 300 Hz)
• Margin still available to increase the frequency.
– Mass (including 4xCCDs - 180g each) 1.49 Kg (< 1.6 Kg)• If CCDs mass ~ 225 g, ~1.69 Kg
– CCD Temperature <-73 ºC (<-70 ºC)– Only NORMAL FPAs considered up to now.
Interfaces– CCD-FPA Interface has already been agreed– FPA-TOU I/F still open
• Current interface would impose a weird design. Trade off in progress.
FPA status
8Roser Urqui
PLATO Kick off meeting November 2010 Roser Urqui 9
Next steps
Design Refinement until late November– Further Mass reduction– Adapt to updated Requirements and Interfaces
Mock-Up Start of Manufacturing mid December– After CDR/MRR
Mock-Up Delivery mid March No delays are foreseen