Page 1: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Plastic Pipe

Updates and Construction Issues

PHMSA Training and Qualifications

Page 2: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

PLASTIC PIPE ADVISORY BULLETINS

AND RULEMAKING UPDATES

Page 3: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Current Rulemakings in Process

• Miscellaneous Rulemaking • EFV Expansion beyond Single Family Residences• Standards Update Rule • Plastic Piping System Rulemaking

Page 4: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Current Rulemakings in Process

• Miscellaneous Rulemaking (Final Stage)– requirements for qualifying plastic pipe joiners

• EFV Expansion beyond Single Family Residences (Final Stage)– Rule will propose to require EFVs for: • branched service lines serving more than one single

family residence • multi-family residential dwellings • commercial buildings

Page 5: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Current Rulemakings in Process

• Standards Update Rule (Based on proposal in NPRM)– Would impact 22 of the 60+ standards currently

incorporated by reference (IBR)– ASTM D2513-09a would be incorporated through §192.7 for

PE with the exception of Section 4.2 pertaining to rework – ASTM D2513-87 (for 192.63 marking only) and ASTM D2513-

99 (except section 4.2) would continue to be IBR for non-PE plastics

– Would also add explicit paragraph in 192.59 (materials) to say “Rework and/or regrind material is not allowed in plastic pipe used under this part.”

Page 6: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Plastic Piping System Rulemaking

In Draft• Incorporation of 15+ new or updated standards• Category 1 only for mechanical fittings• Tracking and Traceability• Increased Design Factor for PE (0.32 to 0.40)• PA-11: revise current limitations (up to 250 psi and

6”)

Page 7: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Plastic Piping System Rulemaking (cont.)

• PA-12: incorporate with limitations (up to 250 psi and 6”)

• Code revisions for risers based on best practices – both mains and services

• Additional revisions to code for installation of plastic pipe based on current best practices (i.e. use of proper backfill, trenchless installation best practices, etc.)

Page 8: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Advisory Bulletins

• ADB-07-01A–Delrin insert tap tees–Plexco service tee Celcon (polyacetal) caps.

• ADB-2012-03–1978 to 1999 ½” CTS to 2” IPS Driscopipe 8000

High Density Polyethylene Pipe

Page 9: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Delrin insert tap tees

Page 10: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Plexco service tee Celcon (polyacetal) caps.

Page 11: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 12: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 13: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Plastic Pipe Construction Issues

Page 14: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 15: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Damaged Pipe

Page 16: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 17: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 18: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 19: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 20: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 21: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Fusion Issues

Page 22: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Thermoplastic Pipe Materials

Acrylonitrilc-Butadiene-Styrene (ABS)

Cellulose-Acetate-Butyrate (CAB)

Poly Butylene (PB)

Polyethylene (PE)

Polyvinyl-Chloride (PVC)

Polyamide (PA)

24PHMSA TQ

Page 23: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 24: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Generic Procedures Don’t Cover …

• Driscoplex 8000 Series Pipe• Dupont Adlyl A (Medium or High Density)

• A procedure must be qualified under 192.283 to join these materials

Page 25: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 26: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 27: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 28: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 29: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 30: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 31: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 32: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 33: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 34: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 35: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 36: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 37: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 38: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 39: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 40: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Mains and Services

Page 41: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 42: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 43: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 44: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 45: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 46: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 47: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 48: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 49: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Boring and Trenching

Page 50: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 51: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 52: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 53: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 54: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Static Electricity

56PHMSA TQ

Page 55: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Odorant Softens Poly

57PHMSA TQ

Page 56: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Other Issues

Page 57: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 58: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.
Page 59: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Records

Page 60: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Be Careful and Be Safe

If it doesn’t look right – It probably isn’t….

Page 61: Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications.

Thank you! Questions?

Bryan Kichler

[email protected]