Año Alternativa I Alternativa II 1 2015 2057 2057 1.00348722 2 2016 2064 2064 0.0035 3 2017 2071 2071 4 2018 2079 2079 5 2019 2086 2086 6 2020 2093 2093 7 2021 2100 2100 8 2022 2108 2108 9 2023 2115 2115 10 2024 2122 2122 Total 20896 20896
Año Alternativa I Alternativa II1 2015 2057 2057 1.003487222 2016 2064 2064 0.00353 2017 2071 20714 2018 2079 20795 2019 2086 20866 2020 2093 20937 2021 2100 21008 2022 2108 21089 2023 2115 2115
10 2024 2122 2122Total 20896 20896
3823 38234026 40264238 42384459 44594689 46894929 49295179 51795439 54395709 57095990 5990
0 48481
CHACCRAMPA
GRUPO ETAREOATENCIONES
GRUPO ETAREO TOTAL MASCULINO FEMENINO TOTAL GENERAL 9,475 4,099 5,376 TOTAL GENERAL NIÑOS 4,980 2,759 2,221 NIÑOSADOLESCENTES 1,157 474 683 ADOLESCENTESJOVENES 1,209 138 1,071 JOVENESADULTOS 1,348 357 991 ADULTOSADULTOS MAYORES 781 371 410 ADULTOS MAYORES
YANACULLO
GRUPO ETAREOATENCIONES
TOTAL MASCULINO FEMENINO TOTAL GENERAL 100 43 57 NIÑOS 78 38 40 ADOLESCENTES 10 4 6 JOVENES 3 - 3 ADULTOS 9 1 8 ADULTOS MAYORES - - -
IGLESIA PATA SAN JUAN DE PAMPAATENCIONES
GRUPO ETAREOATENCIONES
TOTAL MASCULINO FEMENINO TOTAL MASCULINO FEMENINO 3,289 1,307 1,982 TOTAL GENERAL 124 51 73 1,499 772 727 NIÑOS 100 43 57 428 219 209 ADOLESCENTES 18 8 10 400 47 353 JOVENES 5 - 5 623 163 460 ADULTOS 1 - 1 339 106 233 ADULTOS MAYORES - - -
AMBIENTES PROYECTADOS
CONSULTORIO OBSTETRICO +SSHHCONSULTORIO SALA DE PUERPERIO Y ATENCIÓN AL RECIÉN NACIDO +SSHHSALA DE PARTOSLABORATORIOALMACÉN MEDICO ALMACÉN PAFCORESIDUOS BIOMEDICOS RECEPCIÓN DE MUESTRAS Y EXPENDIO DE RESULTADOSSALA DE DILATACIÓN +SSHHCONSULTORIO AREA ADULTO MAYORCONSULTORIO GRAL ADOLESCENTES, JOVENES Y ADULTOS BOTADERO (02 UNID)RESIDENCIA PERSONAL +SSHHCIRCULACIÓN Y MUROS (30%)CUARTO DE LIMPIEZACONSULTORI TBCLABORATORIO TBCCONSULTORIO TRANSMISIBLEHALLADMISION CAJA ARCHIVOFARMACIATÓPICOHOSPITALIZACIÓN (02 SSHH + 02 DORMITORIOS + 01 COCINA + 01 SALA STARCOMEDOR)ALMACENSSHH PÚBLICO (02 UNIDADES MÓDULO CONSULTORIOS, CONSULTORIO DE TBC01 UND, MODULO PRINCIPAL 02 UNID)SALA DE ESPERACERCO PERÍMETRICO TOTAL ÁREA CONSTRUIDA
AREAS A CONSTRUIRCHACCRAMPA (m2)
1821.520
18.512123
1218
14.113.3
746.555.22.213
12.312.210.810.8
918
66.25
10.65
17.5
24226 ML477.8
AMBIENTES PROYECTADOS ÁREAS A CONSTRUIR IGLESIA PATA (m2) SAN JUAN DE PAMPA (m2)
CONSULTORIO ÁREA MUJER (MEF Y GESTANTES) - 15.00CONSULTORIO ÁREA NIÑO - 12.00CONSULTORIO ÁREA ADULTO MAYOR - 12.00CONSULTORIO GRAL ADOLECENTES, JOVENES Y ADULTOS - 12.00ARCHIVO - 13.38BOTADERO - 5.20RESIDENCIA PERSONAL + SSHH 46.50 46.50CIRCULACIÓN Y MUROS (30%) - 55.00ADMISIÓN CAJA - 10.90CUARTO DE LIMPIEZA - 3.00Enfermería - -FARMACIA - 12.00TÓPICO - 18.00Hospitalización - -ALMACEN GENERAL 20.00 20.00SS HH PÚBLICO + MODULO DESCAP. - 11.75SALA DE ESPERA - 48.00Estimulación - -CERCO PERÍMETRICO 112 ML 120 MLTOTAL ÁREA CONSTRUIDA 66.50 294.96
ÁREAS A CONSTRUIR
ÁREAS A CONSTRUIR ÁREAS A CONSTRUIR SAN JUAN DE PAMPA (m2) YANACULLO (m2)
15.00 15.0012.00 12.0012.00 12.0012.00 12.0013.38 13.385.20 5.20
46.50 46.5055.00 55.2010.90 10.933.00 3.00
- -12.00 12.0018.00 18.00
- -20.00 20.0011.75 11.7548.00 48.00
- -120 ML 118 ML294.96 294.96
`
Descripción Unid. Medida Cant. P.U. MES
GASTOS DE OPERACIÓN TOTALMedicamentos y Materiales Global 1 594.17 Personal (Profesionales en salud) Sueldo 1 25,499.64 Servicios de Energía Eléctrica Servicio / mes 1 210.00 Servicio de agua - desague Servicio / mes 1 20.00 Gastos generales Global 1 131.62 GASTOS DE MANTENIMIENTO TOTAL
Global 1 547.08
Global 1 189.17 Mantenimiento general de sistema de aguaGlobal 1 150.00 Mantenimiento general de sistema electricGlobal 1 108.33 Mantenimiento de equipo de comunicació Global 1 63.75
Global 1 176.67 TOTAL
Reparación y repintando general paredesinteriores y exteriores.Mantenimiento, pintado y laqueado de puertas, ventanas, muebles.
Mantenimiento de techos, paredes, cerco perimetrico.
`
Costo Annual 2015 2016 2017 2018 2019 2020 20210 1 2 3 4 5 6
317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43
14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00
6,565.00 6,565.00 6,565.00 6,565.00 6,565.00 6,565.00 6,565.00 6,565.00
2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,300.00 1,300.00 1,300.00 1,300.00 1,300.00 1,300.00 1,300.00 1,300.00 765.00 765.00 765.00 765.00 765.00 765.00 765.00 765.00
2,120.00 2,120.00 2,120.00 2,120.00 2,120.00 2,120.00 2,120.00 2,120.00 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11
`
2022 2023 2024 20257 8 9 10
317,465.11 317,465.11 317,465.11 317,465.11 7,130.00 7,130.00 7,130.00 7,130.00 305,995.68 305,995.68 305,995.68 305,995.68 2,520.00 2,520.00 2,520.00 2,520.00 240.00 240.00 240.00 240.00 1,579.43 1,579.43 1,579.43 1,579.43 14,820.00 14,820.00 14,820.00 14,820.00
6,565.00 6,565.00 6,565.00 6,565.00
2,270.00 2,270.00 2,270.00 2,270.00 1,800.00 1,800.00 1,800.00 1,800.00 1,300.00 1,300.00 1,300.00 1,300.00 765.00 765.00 765.00 765.00
2,120.00 2,120.00 2,120.00 2,120.00 332,285.11 332,285.11 332,285.11 332,285.11
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.0230 1 2 3 4 5 6 7 8 9 10
GASTOS DE OPERACIÓN TOTAL 0,00 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11 317.465,11Medicamentos y Materiales Global 1 594,17 7.130,00 0,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00 7.130,00Personal (Profesionales en salud) Sueldo 1 25.499,64 305.995,68 0,00 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68 305.995,68Servicio de Energía Eléctrica Servicio / mes 1 210,00 2.520,00 0,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00 2.520,00Sevicio de agua - desague Servicio / mes 1 20,00 240,00 0,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00 240,00Gastos generales Global 1 131,62 1.579,43 0,00 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43 1.579,43GASTOS DE MANTENIMIENTO TOTAL 0,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00 12.135,00Reparación y repintado General paredes interiores y exteriores.
Global 1 547,08 6.565,00 0,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00 6.565,00
Mantenimiento , pintado y laqueado de puertas, ventanas, muebles
Global 1 189,17 2.270,00 0,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00 2.270,00
Mantenimiento general de sisema de agua Global 1 125,00 1.500,00 0,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00Mantenimiento general de sisema electrico Global 1 66,67 800,00 0,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00 800,00Mantenimiento de equipo de comunicación Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00Mantenimiento de techos, paredes, cerco perimetrico.
Global 1 41,67 500,00 0,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00 500,00
TOTAL 0,00 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11 329.600,11Gastos Generales: Comprende gastos relacionados a actividades administrativas y generales.Fuente: Presupuesto Analítico de Personal (PAP - 2013), Entrevistas a responsables de las P.S.Elaboración: Equipo técnico - 2013
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida Cant. P.U. MES Costo Anual
COSTOS DE OPERACIÓN Y MANTENIMIENTO "SIN PROYECTO" A PRECIOS SOCIALES
Descripción Unid. Medida Cant.
GASTOS DE OPERACIÓN TOTALMedicamentos y Materiales Global 1Personal (Profesionales en salud) Sueldo 1Servicios de Energía Eléctrica Servicio / mes 1Servicio de agua - desague Servicio / mes 1Gastos generales Global 1GASTOS DE MANTENIMIENTO TOTAL
Global 1
Global 1Mantenimiento general de sistema de agua Global 1Mantenimiento general de sistema electrico Global 1Mantenimiento de equipo de comunicación Global 1
Global 1TOTAL
Reparación y repintando general paredesinteriores y exteriores.Mantenimiento, pintado y laqueado de puertas, ventanas, muebles.
Mantenimiento de techos, paredes, cerco perimetrico.
COSTOS DE OPERACIÓN Y MANTENIMIENTO "SIN PROYECTO" A PRECIOS SOCIALES
P.U. MES F.C. Costo Annual 2015 2016 2017 2018 20190 1 2 3 4
288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 594.17 0.85 6,060.50 6,060.50 6,060.50 6,060.50 6,060.50 6,060.50 25,499.64 0.91 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 210.00 0.85 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 20.00 0.85 204.00 204.00 204.00 204.00 204.00 204.00 131.62 0.85 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51
12,552.55 12,552.55 12,552.55 12,552.55 12,552.55
547.08 0.85 5,560.56 5,560.56 5,560.56 5,560.56 5,560.56 5,560.56
189.17 0.85 1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 150.00 0.85 1,524.60 1,524.60 1,524.60 1,524.60 1,524.60 1,524.60 108.33 0.85 1,101.10 1,101.10 1,101.10 1,101.10 1,101.10 1,101.10 63.75 0.85 647.96 647.96 647.96 647.96 647.96 647.96
176.67 0.85 1,795.64 1,795.64 1,795.64 1,795.64 1,795.64 1,795.64 300,757.63 300,757.63 300,757.63 300,757.63 300,757.63
COSTOS DE OPERACIÓN Y MANTENIMIENTO "SIN PROYECTO" A PRECIOS SOCIALES
2020 2021 2022 2023 2024 20255 6 7 8 9 10
288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 6,060.50 6,060.50 6,060.50 6,060.50 6,060.50 6,060.50 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 204.00 204.00 204.00 204.00 204.00 204.00 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 12,552.55 12,552.55 12,552.55 12,552.55 12,552.55 12,552.55
5,560.56 5,560.56 5,560.56 5,560.56 5,560.56 5,560.56
1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,524.60 1,524.60 1,524.60 1,524.60 1,524.60 1,524.60 1,101.10 1,101.10 1,101.10 1,101.10 1,101.10 1,101.10 647.96 647.96 647.96 647.96 647.96 647.96
1,795.64 1,795.64 1,795.64 1,795.64 1,795.64 1,795.64 300,757.63 300,757.63 300,757.63 300,757.63 300,757.63 300,757.63
12
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA I
Item Descripción Und.
POSTAS DE SALUD
Metas Costo/M2
1 INFRAESTRUCTURA GLB111 OBRAS GENERALES GLB 1.00 315,095.99 112 04 MODULOS PRINCIPALES M2 355.95 1,727.45 113 01 MODULO CONSULTORIO M2 355.95 1,168.32 114 04 VIVIENDA M2 114.11 1,469.76 115 04 ALMACEN M2 58.74 1,596.34 116 01 LABORATORIO Y CONSULTORIO TBC M2 125.00 1,310.52 117 04 GRUPO ELECTROGENO M2 22.09 1,246.04 118 04 CISTERNA TANQUE ELEVADO M2 9.00 5,891.63 119 04 MURO PERIMETRICO M2 346.60 1,210.71 120 01 TANQUE SEPTICO + POZO PERCOLAR M2 0.00 0.00
2 EQUIPAMIENTO Y MOBILIARIOS GLB 1.00 429,359.38 3 CAPACITACIONES Y CONSULTORIAS VENT 1.00 44,385.60 4 PLAN DE GESTION DE RIESGO GLB 1.00 2,881.36 5 PLAN DE GESTION AMBIENTAL GLB 1.00 4,521.67
COSTO DIRECTOGASTO GENERALES (12%)UTILIDAD (10%)SUB TOTALIGV (18%)PRESUPUESTO DE EJECUCIÓNGASTOS DE SUPERVISION (4%)EXPEDIENTE TÉCNICO (3%)COSTO TOTAL
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPOSTAS DE SALUD
Metas Costo/M2 Metas Costo/M2
2,271,325.04 1,249,829.47 1,284,653.17 315,095.99 1.00 201,032.59 201,032.59 1.00 208,496.48 208,496.48 614,885.93 355.95 1,168.32 415,863.51 355.95 1,168.32 415,863.52 415,863.52 0.00 0.00 0.00 0.00 0.00 0.00 167,714.46 114.11 1,233.83 140,792.60 114.11 1,224.37 139,713.01 93,768.89 58.74 1,338.18 78,604.62 58.74 1,349.70 79,281.55 163,814.55 0.00 0.00 0.00 0.00 0.00 0.00 27,525.00 22.09 1,246.04 27,525.00 22.09 1,246.04 27,525.00 53,024.71 9.00 5,891.63 53,024.71 9.00 5,891.63 53,024.71 419,631.99 234.55 1,419.68 332,986.44 282.60 1,165.28 329,308.63
0.00 0.00 0.00 0.00 117.71 267.10 31,440.27 429,359.38 1.00 74,698.78 74,698.78 1.00 74,698.78 74,698.78 44,385.60 1.00 44,385.60 44,385.60 1.00 44,385.60 44,385.60 2,881.36 1.00 2,881.36 2,881.36 1.00 2,305.09 2,305.09 4,521.67 1.00 4,521.67 4,521.67 1.00 4,521.67 4,521.67 2,752,473.05 1,376,316.88 1,410,564.31 330,296.77 165,158.03 169,267.72 275,247.31 110,105.35 70,528.22 3,358,017.12 1,651,580.26 1,650,360.24 604,443.08 297,284.45 297,064.84 3,962,460.20 1,948,864.70 1,947,425.09 158,498.41 77,954.59 77,897.00 118,873.81 58,465.94 58,422.75 4,239,832.42 2,085,285.23 2,083,744.84
Ppto-Chaccrampa
Ppto-IglesiaPata
Ppto-San Juan de Pampa
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPOSTAS DE SALUD
TotalMetas Costo/M2 Ppto-Yanacullo
1,288,042.37 6,093,850.05 1.00 223,922.39 223,922.39 948,547.45 355.94 1,168.35 415,863.52 1,862,476.48
0.00 0.00 0.00 415,863.52 114.11 1,224.37 139,713.01 587,933.08 58.74 1,338.18 78,604.62 330,259.68
0.00 0.00 0.00 163,814.55 22.09 1,246.04 27,525.00 110,100.00 9.00 5,891.63 53,024.71 212,098.84 260.60 1,340.71 349,389.12 1,431,316.18
0.00 0.00 0.00 31,440.27 1.00 74,698.78 74,698.78 653,455.72 1.00 44,385.60 44,385.60 177,542.40 1.00 2,881.36 2,881.36 10,949.17 1.00 4,521.67 4,521.67 18,086.68
1,414,529.78 6,953,884.02 169,743.57 834,466.08 141,452.98 695,388.40 1,725,726.33 8,483,738.50 310,630.74 1,527,072.93 2,036,357.07 10,010,811.44 81,454.28 400,432.46 61,090.71 300,324.34 2,178,902.07 10,711,568.24
PRESUPUESTO A PRECIOS SOCIALES DESAGREGADO ALTERNATIVA I
Item Descripción Und.POSTAS DE SALUD
CHACCRAMPA
1 INFRAESTRUCTURA GLB 1,892,510.68 BIENES NO TRANSABLES 0.847 1,485,577.39 BIENES TRANSABLES 0.867 40,760.67 MANOS DE OBRA CALIFICADA 0.909 315,828.98 MANO DE OBRA NO CALIFICADA (SIERRA RURAL) 0.410 50,343.64
2 EQUIPAMIENTO Y MOBILIARIOS GLB 372,254.58 BIENES NO TRANSABLES 0.867 372,254.58
3 CAPACITACIONES Y CONSUTORÍAS EVENT 105,552.71 BIENES NO TRANSABLES 0.867 9,690.42 MANO DE OBRA CALIFICADA 0.909 95,862.29
4 PLAN DE GESTIÓN DE RIESGO GLB 2,440.51 MANO DE OBRA CALIFICADA 0.847 2,440.51
5 PLAN DE GESTIÓN AMBIENTAL GLB 4,096.07 BIENES NO TRANSABLES 0.867 291.67 MANO DE OBRA CALIFICADA 0.909 3,804.40 COSTO DIRECTOGASTOS GENERALES (12%) 0.909 300,239.76 UTILIDAD (10%) 0.909 250,199.80 IGV (18%) 0.909 549,438.76 GASTOS DE SUPERVISION (4%) 0.909 144,075.05 EXPEDIENTE TÉCNICO (3%) 0.909 108,056.29 COSTO TOTAL
Factor de Correción
PRESUPUESTO A PRECIOS SOCIALES DESAGREGADO ALTERNATIVA IPOSTAS DE SALUD
PRES. TOTALIGLESIA PATA YANACULLO
1,041,464.83 1,070,408.51 1,072,947.43 5,077,331.44 817,525.96 840,246.08 842,239.08 3,985,588.51 22,430.95 23,054.33 23,109.01 109,354.96 173,803.39 178,633.61 179,057.32 847,323.30 27,704.54 28,474.48 28,542.02 135,064.68 64,763.84 64,763.84 64,763.84 566,546.11 64,763.84 64,763.84 64,763.84 566,546.11 18,363.28 18,363.28 18,363.28 160,642.56 1,685.87 1,685.87 1,685.87 14,748.03 16,677.41 16,677.41 16,677.41 145,894.53 2,440.51 1,952.41 2,440.51 9,273.95 2,440.51 1,952.41 2,440.51 9,273.95 4,096.07 4,096.07 4,096.07 16,384.27 291.67 291.67 291.67 1,166.68 3,804.40 3,804.40 3,804.40 15,217.60
5,830,178.33 150,128.65 153,864.35 154,296.91 699,621.40 100,085.76 64,110.15 128,580.76 583,017.83 270,231.56 270,031.94 282,363.34 1,049,432.10 70,860.72 70,808.38 74,041.94 233,207.13 53,145.54 53,106.28 55,531.46 174,905.35
8,570,362.14
SAN JUAN DE PAMPA
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA II
Item Descripción1 INFRAESTRUCTURA
111 OBRAS GENERALES112 04 MODULOS PRINCIPALES113 01 MODULO CONSULTORIO114 04 VIVIENDA115 04 ALMACEN116 01 LABORATORIO Y CONSULTORIO TBC117 04 GRUPO ELECTROGENO118 04 CISTERNA TANQUE ELEVADO119 04 MURO PERIMETRICO120 01 TANQUE SEPTICO + POZO PERCOLAR
2 EQUIPAMIENTO Y MOBILIARIOS
34 PLAN DE GESTION DE RIESGO5 PLAN DE GESTION AMBIENTAL
COSTO DIRECTOGASTO GENERALES (12%)UTILIDAD (10%)SUB TOTALIGV (18%)PRESUPUESTO DE EJECUCIÓNGASTOS DE SUPERVISION (4%)EXPEDIENTE TÉCNICO (3%)COSTO TOTAL
CAPACITACIONES Y CONSULTORIAS + PASANTÍAS
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA II
Und.
POSTAS DE SALUD
Metas Costo/M2 Metas Costo/M2
GLB 2,271,325.04 1,249,829.47 GLB 1.00 315,095.99 315,095.99 1.00 201,032.59 201,032.59 M2 355.95 1,727.45 614,885.93 355.95 1,168.32 415,863.51 M2 355.95 1,168.32 415,863.52 0.00 0.00 0.00M2 114.11 1,469.76 167,714.46 114.11 1,233.83 140,792.60 M2 58.74 1,596.34 93,768.89 58.74 1,338.18 78,604.62 M2 125.00 1,310.52 163,814.55 0.00 0.00 0.00M2 22.09 1,246.04 27,525.00 22.09 1,246.04 27,525.00 M2 9.00 5,891.63 53,024.71 9.00 5,891.63 53,024.71 M2 346.60 1,210.71 419,631.99 234.55 1,419.68 332,986.44 M2 0.00 0.00 0.00 0.00 0.00 0.00GLB 1.00 429,359.38 429,359.38 1.00 74,698.78 74,698.78
VENT 1.00 91,885.60 91,885.60 1.00 91,885.60 91,885.60
GLB 1.00 2,881.36 2,881.36 1.00 2,881.36 2,881.36 GLB 1.00 4,521.67 4,521.67 1.00 4,521.67 4,521.67
2,799,973.05 1,423,816.88 335,996.77 170,858.03 279,997.31 113,905.35 3,415,967.12 1,708,580.26 614,874.08 307,544.45 4,030,841.20 2,016,124.70 161,233.65 80,644.99 120,925.24 60,483.74 4,313,000.09 2,157,253.43
Ppto-Chaccrampa
Ppto-IglesiaPata
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IIPOSTAS DE SALUD
Metas Costo/M2 Metas Costo/M2 Ppto-Yanacullo
1,284,653.17 1,288,042.37 1.00 208,496.48 208,496.48 1.00 223,922.39 223,922.39 355.95 1,168.32 415,863.52 355.94 1,168.35 415,863.52
0.00 0.00 0.00 0.00 0.00 0.00 114.11 1,224.37 139,713.01 114.11 1,224.37 139,713.01 58.74 1,349.70 79,281.55 58.74 1,338.18 78,604.62
0.00 0.00 0.00 0.00 0.00 0.00 22.09 1,246.04 27,525.00 22.09 1,246.04 27,525.00 9.00 5,891.63 53,024.71 9.00 5,891.63 53,024.71 282.60 1,165.28 329,308.63 260.60 1,340.71 349,389.12 117.71 267.10 31,440.27 0.00 0.00 0.00 1.00 74,698.78 74,698.78 1.00 74,698.78 74,698.78
1.00 91,885.60 91,885.60 1.00 91,885.60 91,885.60
1.00 2,305.09 2,305.09 1.00 2,881.36 2,881.36 1.00 4,521.67 4,521.67 1.00 4,521.67 4,521.67
1,458,064.31 1,462,029.78 174,967.72 175,443.57 72,903.22 146,202.98 1,705,935.24 1,783,676.33 307,068.34 321,061.74 2,013,003.59 2,104,738.07 80,520.14 84,189.52 60,390.11 63,142.14 2,153,913.84 2,252,069.74
Ppto-San Juan de Pampa
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA II
Total
6,093,850.05 948,547.45 1,862,476.48 415,863.52 587,933.08 330,259.68 163,814.55 110,100.00 212,098.84 1,431,316.18 31,440.27 653,455.72
367,542.40
10,949.17 18,086.68 7,143,884.02 857,266.08 714,388.40 8,715,538.50 1,568,796.93 10,284,335.44 411,373.42 308,530.06 11,004,238.92
PRESUPUESTO A PRECIOS SOCIALES DESAGREGADO ALTERNATIVA I
Item Descripción Und.
1 INFRAESTRUCTURA GLBBIENES NO TRANSABLES 0.847BIENES TRANSABLES 0.867MANOS DE OBRA CALIFICADA 0.909MANO DE OBRA NO CALIFICADA (SIERRA RURAL) 0.410
2 EQUIPAMIENTO Y MOBILIARIOS GLBBIENES NO TRANSABLES 0.867
3 CAPACITACIONES Y CONSUTORÍAS + PASANTIAS EVENTBIENES NO TRANSABLES 0.867MANO DE OBRA CALIFICADA 0.909
4 PLAN DE GESTIÓN DE RIESGO GLBMANO DE OBRA CALIFICADA 0.847
5 PLAN DE GESTIÓN AMBIENTAL GLBBIENES NO TRANSABLES 0.867MANO DE OBRA CALIFICADA 0.909COSTO DIRECTOGASTOS GENERALES (12%) 0.909UTILIDAD (10%) 0.909IGV (18%) 0.909GASTOS DE SUPERVISION (4%) 0.909EXPEDIENTE TÉCNICO (3%) 0.909COSTO TOTAL
Factor de Correción
PRESUPUESTO A PRECIOS SOCIALES DESAGREGADO ALTERNATIVA IPOSTAS DE SALUD
PRES. TOTALCHACCRAMPA IGLESIA PATA YANACULLO
1,892,510.68 1,041,464.83 1,070,408.51 1,072,947.43 5,077,331.44 1,485,577.39 817,525.96 840,246.08 842,239.08 3,985,588.51 40,760.67 22,430.95 23,054.33 23,109.01 109,354.96 315,828.98 173,803.39 178,633.61 179,057.32 847,323.30 50,343.64 27,704.54 28,474.48 28,542.02 135,064.68 372,254.58 64,763.84 64,763.84 64,763.84 566,546.11 372,254.58 64,763.84 64,763.84 64,763.84 566,546.11 218,511.74 38,015.06 38,015.06 38,015.06 332,556.90 20,060.79 3,490.03 3,490.03 3,490.03 30,530.88 198,450.94 34,525.03 34,525.03 34,525.03 302,026.03 2,440.51 2,440.51 1,952.41 2,440.51 9,273.95 2,440.51 2,440.51 1,952.41 2,440.51 9,273.95 4,096.07 4,096.07 4,096.07 4,096.07 16,384.27 291.67 291.67 291.67 291.67 1,166.68 3,804.40 3,804.40 3,804.40 3,804.40 15,217.60
6,002,092.68 300,239.76 150,128.65 153,864.35 154,296.91 720,251.12 250,199.80 100,085.76 64,110.15 128,580.76 600,209.27 549,438.76 270,231.56 270,031.94 282,363.34 1,080,376.68 144,075.05 70,860.72 70,808.38 74,041.94 240,083.71 108,056.29 53,145.54 53,106.28 55,531.46 180,062.78
8,823,076.23
SAN JUAN DE PAMPA
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Descripción Unid. Medida
GASTOS DE OPERACIÓN TOTALMedicamentos y Materiales GlobalPersonal (Profesionales en salud) SueldoServicios de Energía Eléctrica Servicio / mesServicio de agua - desague Servicio / mesGastos generales GlobalGASTOS DE MANTENIMIENTO TOTAL
Global
GlobalMantenimiento general de sistema de agua GlobalMantenimiento general de sistema electrico GlobalMantenimiento de equipo de comunicación Global
GlobalTOTAL
Reparación y repintando general paredesinteriores y exteriores.Mantenimiento, pintado y laqueado de puertas, ventanas, muebles.
Mantenimiento de techos, paredes, cerco perimetrico.
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
Cant. P.U. MES Costo Annual 2015 2016 2017 2018 20190 1 2 3 4
0.00 317,465.11 317,465.11 317,465.11 317,465.11 1 594.17 7,130.00 0.00 7,130.00 7,130.00 7,130.00 7,130.00 1 25,499.64 30,595.68 0.00 305,995.68 305,995.68 305,995.68 305,995.68 1 210.00 2,520.00 0.00 2,520.00 2,520.00 2,520.00 2,520.00 1 20.00 240.00 0.00 240.00 240.00 240.00 240.00 1 131.62 1,579.43 0.00 1,579.43 1,579.43 1,579.43 1,579.43
0.00 12,135.00 12,135.00 12,135.00 12,135.00
1 547.08 6,565.00 0.00 6,565.00 6,565.00 6,565.00 6,565.00
1 189.17 2,270.00 0.00 2,270.00 2,270.00 2,270.00 2,270.00 1 125.00 1,500.00 0.00 1,500.00 1,500.00 1,500.00 1,500.00 1 66.67 800.00 0.00 800.00 800.00 800.00 800.00 1 41.67 500.00 0.00 500.00 500.00 500.00 500.00
1 41.67 500.00 0.00 500.00 500.00 500.00 500.00 0.00 329,600.11 329,600.11 329,600.11 329,600.11
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS PRIVADOS
2020 2021 2022 2023 2024 20255 6 7 8 9 10
317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 7,130.00 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 305,995.68 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 240.00 240.00 240.00 240.00 240.00 240.00 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43 1,579.43 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00
6,565.00 6,565.00 6,565.00 6,565.00 6,565.00 6,565.00
2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 2,270.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 800.00 800.00 800.00 800.00 800.00 800.00 500.00 500.00 500.00 500.00 500.00 500.00
500.00 500.00 500.00 500.00 500.00 500.00 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS SOCIALES
Descripción Unid. Medida
GASTOS DE OPERACIÓN TOTALMedicamentos y Materiales GlobalPersonal (Profesionales en salud) SueldoServicios de Energía Eléctrica Servicio / mesServicio de agua - desague Servicio / mesGastos generales GlobalGASTOS DE MANTENIMIENTO TOTAL
Global
GlobalMantenimiento general de sistema de agua GlobalMantenimiento general de sistema electrico GlobalMantenimiento de equipo de comunicación Global
TOTAL
Reparación y repintando general paredesinteriores y exteriores.
Mantenimiento, pintado y laqueado de puertas, ventanas, muebles.
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS SOCIALES
Cant. P.U. MES F.C. Costo Annual 2015 2016 2017 20180 1 2 3
0.00 288,195.08 288,195.08 288,195.08 1 594.17 0.85 6,060.50 0.00 6,050.50 6,050.50 6,050.50 1 25,499.64 0.91 278,456.07 0.00 278,456.07 278,456.07 278,456.07 1 210.00 0.85 2,142.00 0.00 2,142.00 2,142.00 2,142.00 1 20.00 0.85 204.00 0.00 204.00 204.00 204.00 1 131.62 0.85 1,342.51 0.00 1,342.51 1,342.51 1,342.51
0.00 9,854.85 9,854.85 9,854.85
1 547.08 0.85 5,560.56 0.00 5,560.56 5,560.56 5,560.56
1 189.17 0.85 1,922.69 0.00 1,922.69 1,922.69 1,922.69 1 125.00 0.85 1,270.50 0.00 1,270.50 1,270.50 1,270.50 1 66.67 0.85 677.60 0.00 677.60 677.60 677.60 1 41.67 0.85 423.50 0.00 423.50 423.50 423.50
0.00 298,049.93 298,049.93 298,049.93
COSTOS DE OPERACIÓN Y MANTENIMIENTO "CON PROYECTO" A PRECIOS SOCIALES
2019 2020 2021 2022 2023 2024 20254 5 6 7 8 9 10
288,195.08 288,195.08 288,195.08 288,195.08 288,195.08 288,195.08 288,195.08 6,050.50 6,050.50 6,050.50 6,050.50 6,050.50 6,050.50 6,050.50 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 278,456.07 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 2,142.00 204.00 204.00 204.00 204.00 204.00 204.00 204.00 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 1,342.51 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85
5,560.56 5,560.56 5,560.56 5,560.56 5,560.56 5,560.56 5,560.56
1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,922.69 1,270.50 1,270.50 1,270.50 1,270.50 1,270.50 1,270.50 1,270.50 677.60 677.60 677.60 677.60 677.60 677.60 677.60 423.50 423.50 423.50 423.50 423.50 423.50 423.50 298,049.93 298,049.93 298,049.93 298,049.93 298,049.93 298,049.93 298,049.93
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA I
Item Descripción Año 0
1 INFRAESTRUCTURA 6,093,850.05 2 EQUIPAMIENTO Y MOBILIARIOS 653,455.73 3 CAPACITACIONES Y CONSULTORÍAS 177,542.40 4 PLAN DE GESTIÓN DE RIESGO 10,949.17 5 PLAN DE GESTIÓN AMBIENTAL 18,086.68
COSTO DIRECTO 6,953,884.03 GASTOS GENERALES (12%) 834,466.08 UTILIDAD (10%) 695,388.40 IGV (18%) 1,527,072.93 GASTOS DE SUPERVISIÓN (4%) 400,432.46 EXPEDIENTE TÉCNICO (3%) 300,324.34 INVERSIÓN TOTAL 10,711,568.24
A COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTO
B COSOTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTOCOSTOS INCREMENTALES (A-B)
Item Descripción Total1 INFRAESTRUCTURA 6,093,850.05
2 EQUIPAMIENTO Y MOBILIARIOS 653,455.73 3 CAPACITACIONES Y CONSULTORÍAS 177,542.40 4 PLAN DE GESTIÓN DE RIESGO 10,949.17 5 PLAN DE GESTIÓN AMBIENTAL 18,086.68
COSTO DIRECTO 6,953,884.03 GASTOS GENERALES (12%) 834,466.08 UTILIDAD (10%) 695,388.40 IGV (18%) 1,527,072.93 GASTOS DE SUPERVISIÓN (4%) 400,432.46 EXPEDIENTE TÉCNICO (3%) 300,324.34 INVERSIÓN TOTAL 10,711,568.24
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA I
Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8
329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00
-2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA I
Año 9 Año 10
329,600.11 329,600.11 317,465.11 317,465.11 12,135.00 12,135.00 332,285.11 332,285.11 317,465.11 317,465.11 14,820.00 14,820.00
-2,685.00 -2,685.00
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IItem Descripción
1 INFRAESTRUCTURA2 EQUIPAMIENTO Y MOBILIARIOS3 CAPACITACIONES Y CONSULTORÍAS4 PLAN DE GESTIÓN DE RIESGO5 PLAN DE GESTIÓN AMBIENTAL
COSTO DIRECTOGASTOS GENERALES (10%)UTILIDAD (7%)IGV (18%)SUPERVISIÓN (5%)EXPEDIENTE TÉCNICO (3%)INVERSIÓN TOTAL
A COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTO
B COSOTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTOCOSTOS INCREMENTALES (A-B)
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IAño 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7
5,077,331.44 566,546.11 160,642.56 9,273.95 16,384.27 5,830,178.33 699621.39943583017.832861049432.0991233207.13314174905.34986
8,570,362.14 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54
-2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IAño 8 Año 9 Año 10
298,059.93 298,059.93 298,059.93 288,205.08 288,205.08 288,205.08 9,854.85 9,854.85 9,854.85 300,757.62 300,757.62 300,757.62 288,205.08 288,205.08 288,205.08 12,552.54 12,552.54 12,552.54
-2,697.69 -2,697.69 -2,697.69
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA IIItem Descripción
1 INFRAESTRUCTURA2 EQUIPAMIENTO Y MOBILIARIOS3 CAPACITACIONES Y CONSULTORÍAS + PASANTÍAS4 PLAN DE GESTIÓN DE RIESGO5 PLAN DE GESTIÓN AMBIENTAL
COSTO DIRECTOGASTOS GENERALES (12%)UTILIDAD (10%)IGV (18%)GASTOS DE SUPERVISIÓN (4%)EXPEDIENTE TÉCNICO (3%)INVERSIÓN TOTAL
A COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTO
B COSOTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTOCOSTOS INCREMENTALES (A-B)
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA IIAño 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7
6,093,850.05 653,455.72 367,542.40 10,949.18 18,086.68 7,143,884.03 857,266.08 714,388.40 1,568,796.93 411,373.42 308,530.06 11,004,238.92
329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 329,600.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 12,135.00 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 332,285.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 317,465.11 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00
-2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00 -2,685.00
FLUJO DE COSTOS INCREMENTALES A PRECIOS PRIVADOS ALTERNATIVA IIAño 8 Año 9 Año 10
329,600.11 329,600.11 329,600.11 317,465.11 317,465.11 317,465.11 12,135.00 12,135.00 12,135.00 332,285.11 332,285.11 332,285.11 317,465.11 317,465.11 317,465.11 14,820.00 14,820.00 14,820.00
-2,685.00 -2,685.00 -2,685.00
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IIItem Descripción Año 0
1 INFRAESTRUCTURA 5,077,331.44 2 EQUIPAMIENTO Y MOBILIARIOS 566,546.11 3 CAPACITACIONES Y CONSULTORÍAS + PASANTÍAS 332,556.90 4 PLAN DE GESTIÓN DE RIESGO 9,273.95 5 PLAN DE GESTIÓN AMBIENTAL 16,384.27
COSTO DIRECTO 6,002,092.68 GASTOS GENERALES (10%) 720,251.12 UTILIDAD (7%) 600,209.27 IGV (18%) 1,080,376.68 SUPERVISIÓN (5%) 240,083.71 EXPEDIENTE TÉCNICO (3%) 180,062.78 INVERSIÓN TOTAL 8,823,076.23
A COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTO
B COSOTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTOCOSTOS DE OPERACIÓNCOSTOS DE MANTENIMIENTOCOSTOS INCREMENTALES (A-B)
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IIAño 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8
298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 298,059.93 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 9,854.85 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 300,757.62 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 288,205.08 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54 12,552.54
-2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69 -2,697.69
FLUJO DE COSTOS INCREMENTALES A PRECIOS SOCIALES ALTERNATIVA IIAño 9 Año 10
298,059.93 298,059.93 288,205.08 288,205.08 9,854.85 9,854.85 300,757.62 300,757.62 288,205.08 288,205.08 12,552.54 12,552.54
-2,697.69 -2,697.69
RESUMEN DE EVALUACIÓNINDICADORES DE RENTABILIDAD ALTERNATIVA I
COSTO DE INVERSIÓN 8,570,362.14 TSD 9%
VACT 8,553,049.29 N TOTAL DE ATENCIONES 29,028.00
RATIO C/E 294.65
RESUMEN DE EVALUACIÓNALTERNATIVA I ALTERNATIVA II
8,570,362.14 8,823,076.23 9% 8,805,763.38
8,553,049.29 8,805,763.38 29,028.00 29,028.00 29,028.00 294.65 303.35
0
VARIACIÓN DE INVERSIÓNALTERNATIVA I
VACT RATIO C/E
-50% 4,285,181.07 4,285,181.07 147.62-40% 5,142,217.29 5,142,217.29 177.15-30% 5,999,253.50 5,999,253.50 206.67-20% 6,856,289.71 6,856,289.71 236.20-10% 7,713,325.93 7,713,325.93 265.72
0 8,570,362.14 8,553,049.29 294.6510% 9,427,398.36 9,427,398.36 324.7720% 10,284,434.57 10,284,434.57 354.2930% 11,141,470.79 11,141,470.79 383.8240% 11,998,507.00 11,998,507.00 413.3450% 12,855,543.21 12,855,543.21 442.87
% VARIACIÓN DE LA INVERSIÓN VARIACIÓN DE
INVERSIÓN
VARIACIÓN DE INVERSIÓNALTERNATIVA II
VACT RATIO C/E
-50% 4,411,538.12 4,411,538.12 151.98 -40% 5,293,845.74 5,293,845.74 182.37 -30% 6,176,153.36 6,176,153.36 212.77 -20% 7,058,460.99 7,058,460.99 243.16 -10% 7,940,768.61 7,940,768.61 273.56
0 8,823,076.23 8,823,076.23 303.95 10% 9,705,383.86 9,705,383.86 334.35 20% 10,587,691.48 10,587,691.48 364.74 30% 11,469,999.10 11,469,999.10 395.14 40% 12,352,306.73 12,352,306.73 425.53 50% 13,234,614.35 13,234,614.35 455.93
% VARIACIÓN DE LA INVERSIÓN VARIACIÓN DE
INVERSIÓN
VARIACIÓN DE ATENCIONES VARIACIÓN DE ATENCIONESALTERNATIVA I
VACT RATIO C/E
-50% 14514 589.30 -50%-40% 17417 491.08 -40%-30% 20320 420.93 -30%-20% 23222 368.31 -20%-10% 26125 327.39 -10%
0 29028 8553049.29 294.65 010% 31931 267.86 10%20% 34834 245.54 20%30% 37736 226.65 30%40% 40639 210.46 40%50% 43542 196.43 50%
% VARIACIÓN DE LAS ATENCIONES
% VARIACIÓN DE LA INVERSIÓN VARIACIÓN DE
ATENCIONES
VARIACIÓN DE ATENCIONESALTERNATIVA II
VACT RATIO C/E
-50% 14514 606.71-40% 17417 505.59-30% 20320 433.36-20% 23222 379.19-10% 26125 337.06
0 29028 8805763.38 303.3510% 31931 275.7820% 34834 252.8030% 37736 233.3540% 40639 216.6850% 43542 202.24
% VARIACIÓN DE LA INVERSIÓN VARIACIÓN DE
ATENCIONES
SERVICIO PERSONAL
CAPACIDAD HORAS NUMERO
DE ATENCIÓN
POR HORA POR SERVICIO
PER CÁPITA PER CÁPITA
ACTIVIDADES IEC
MEDICO 5.00 14.40 0.00 0OBSTETRA 5.00 144.00 1.00 720OTROS PROFESIONALES 5.00 72.00 6.00 2160
CONSULTAS DE CONTROLMEDICO 2.00 57.00 1.00 114
CRED 0-4 AÑOS
CONSULTA EDA E IRA MEDICO 2.00 86.00 0.00 0
CONSULTAS PRENATALESMEDICO 2.00 28.80 0.00 0OBSTETRA 1.00 43.20 1.00 43
CONSULTAS DE PUERPERIOMEDICO 2.00 14.40 0.00 0OBSTETRA 2.00 14.40 1.00 29
PARTOS FOBMEDICO 0.75 57.60 1.00 43OBSTETRA 0.75 14.40 1.00 11
PARTOS CS/PSMEDICO 0.75 57.60 0.00 0OBSTETRA 0.75 14.40 1.00 11
HOSPITALIZACIÓNMEDICO 1.00 28.80 0.00 0ENFERMERO 1.00 144.00 1.00 144
REFERENCIA DENTROMEDICO 2.00 14.40 1.00 29OBSTETRA 2.00 14.40 1.00 29
REFERENCIA FUERAMEDICO 2.00 14.40 0.00 0OBSTETRA 2.00 14.40 1.00 29
ESTERILIZACIÓNENFERMERO 2.00 42.20 3.00 253OTROS PROFESIONALES 3.00 43.20 6.00 778
FARMACIA OTROS PROFESIONALES 4.00 86.40 6.00 2074
TRIAJEENFERMERO 2.00 86.40 3.00 518OTROS PROFESIONALES 2.00 72.00 6.00 864
CAPACIDAD DE ATENCIÓN TOTAL POR
AÑO
ANUALES DESTINADAS
DE PROFESIONALE
S
Item Descripción Und. Metas
1 EXPEDIENTE TÉCNICO2 INFRAESTRUCTURA
OBRAS GENERALES GLB 1.00 04 MODULOS PRINCIPALES M2 355.95 01 MODULO CONSULTORIO M2 355.95 04 VIVIENDA M2 114.11 04 ALMACEN M2 58.74 01 LABORATORIO Y CONSULTORIO TBC M2 125.00 04 GRUPO ELECTROGENO M2 22.09 04 CISTERNA TANQUE ELEVADO M2 9.00 04 MURO PERIMETRICO M2 346.60 01 TANQUE SEPTICO + POZO PERCOLAR M2 0.00
3 EQUIPAMIENTO Y MOBILIARIOS GLB 1.00 4 CAPACITACIONES Y CONSULTORIAS VENT 1.00 5 PLAN DE GESTION DE RIESGO GLB 1.00 6 PLAN DE GESTION AMBIENTAL GLB 1.00
GASTO GENERALES (12%)UTILIDAD (10%)IGV (18%)GASTOS DE SUPERVISION (4%)
Item Descripción Und. Metas
1 EXPEDIENTE TÉCNICO2 INFRAESTRUCTURA
OBRAS GENERALES GLB 1.00 04 MODULOS PRINCIPALES M2 355.95 01 MODULO CONSULTORIO M2 355.95 04 VIVIENDA M2 114.11 04 ALMACEN M2 58.74 01 LABORATORIO Y CONSULTORIO TBC M2 125.00 04 GRUPO ELECTROGENO M2 22.09 04 CISTERNA TANQUE ELEVADO M2 9.00 04 MURO PERIMETRICO M2 346.60 01 TANQUE SEPTICO + POZO PERCOLAR M2 0.00
3 EQUIPAMIENTO Y MOBILIARIOS GLB 1.00 4 CAPACITACIONES Y CONSULTORIAS VENT 1.00
5 PLAN DE GESTION DE RIESGO GLB 1.00 6 PLAN DE GESTION AMBIENTAL GLB 1.00
GASTO GENERALES (12%)UTILIDAD (10%)IGV (18%)GASTOS DE SUPERVISION (4%)
ParcialEJECUCION FINANCIERA EN BIMESTRE (S/.)
TRIMESTRE 1 TRIMESTRE 2 TRIMESTRE 3 TRIMESTRE 4 TOTAL
300,324.34 100.00% 100.00% 6,093,850.05 948,547.45 50.00% 50.00% 100.00% 1,862,476.48 70.00% 30.00% 100.00% 415,863.52 50.00% 40.00% 10.00% 100.00% 587,933.08 50.00% 40.00% 10.00% 100.00% 330,259.68 50.00% 40.00% 10.00% 100.00% 163,814.55 50.00% 40.00% 10.00% 100.00% 110,100.00 50.00% 40.00% 10.00% 100.00% 212,098.84 50.00% 50.00% 100.00% 1,431,316.18 80.00% 20.00% 100.00%
31440.27 50.00% 50.00% 100.00% 653,455.72 100.00% 100.00% 177,542.40 50.00% 50.00% 100.00% 10,949.17 50.00% 50.00% 100.00% 18,086.68 50.00% 50.00% 100.00% 834,466.08 35.00% 40.00% 25.00% 100.00% 695,388.40 35.00% 40.00% 25.00% 100.00% 1,527,072.93 35.00% 40.00% 25.00% 100.00% 400,432.46 35.00% 40.00% 25.00% 100.00%
ParcialEJECUCION FINANCIERA EN BIMESTRE (S/.)
TRIMESTRE 1 TRIMESTRE 2 TRIMESTRE 3 TRIMESTRE 4 TOTAL
300,324.34 300,324.34 300,324.34 6,093,850.05 948,547.45 474,273.73 474,273.73 948,547.45 1,862,476.48 1,303,733.54 558,742.94 1,862,476.48 415,863.52 207,931.76 166,345.41 41,586.35 415,863.52 587,933.08 293,966.54 235,173.23 58,793.31 587,933.08 330,259.68 165,129.84 132,103.87 33,025.97 330,259.68 163,814.55 81,907.28 65,525.82 16,381.46 163,814.55 110,100.00 55,050.00 44,040.00 11,010.00 110,100.00 212,098.84 106,049.42 106,049.42 212,098.84 1,431,316.18 1,145,052.94 286,263.24 1,431,316.18
31440.27 15,720.14 15,720.14 31440.27 653,455.72 653,455.72 653,455.72 177,542.40 88,771.20 88,771.20 177,542.40
10,949.17 5,474.59 5,474.59 10,949.17 18,086.68 9,043.34 9,043.34 18,086.68 834,466.08 292,063.13 333,786.43 208,616.52 834,466.08 695,388.40 243,385.94 278,155.36 173,847.10 695,388.40 1,527,072.93 534,475.53 610,829.17 381,768.23 1,527,072.93 400,432.46 140,151.36 160,172.98 100,108.11 400,432.46
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA I
Item1
111112113114115116117118119120
2
345
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA I
Descripción Und.
POSTAS DE SALUD
Metas Costo/M2 Metas
INFRAESTRUCTURA GLB ###OBRAS GENERALES GLB 1.00 315,095.99 315,095.99 1.00 04 MODULOS PRINCIPALES M2 355.95 1,727.45 614,885.93 355.95 01 MODULO CONSULTORIO M2 355.95 1,168.32 415,863.52 0.0004 VIVIENDA M2 114.11 1,469.76 167,714.46 114.11 04 ALMACEN M2 58.74 1,596.34 93,768.89 58.74 01 LABORATORIO Y CONSULTORIO TBC M2 125.00 1,310.52 163,814.55 0.0004 GRUPO ELECTROGENO M2 22.09 1,246.04 27,525.00 22.09 04 CISTERNA TANQUE ELEVADO M2 9.00 5,891.63 53,024.71 9.00 04 MURO PERIMETRICO M2 346.60 1,210.71 419,631.99 234.55 01 TANQUE SEPTICO + POZO PERCOLAR M2 0.00 0.00 0.00 0.00EQUIPAMIENTO Y MOBILIARIOS GLB 1.00 429,359.38 429,359.38 1.00
Ppto-Chaccrampa
CAPACITACIONES Y CONSULTORIAS VENT 1.00 44,385.60 44,385.60 1.00 PLAN DE GESTION DE RIESGO GLB 1.00 2,881.36 2,881.36 1.00 PLAN DE GESTION AMBIENTAL GLB 1.00 4,521.67 4,521.67 1.00 COSTO DIRECTO ###GASTO GENERALES (12%) 330,296.77 UTILIDAD (10%) 275,247.31 SUB TOTAL ###IGV (18%) 604,443.08 PRESUPUESTO DE EJECUCIÓN ###GASTOS DE SUPERVISION (4%) 158,498.41 EXPEDIENTE TÉCNICO (3%) 118,873.81 COSTO TOTAL ###
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA I
POSTAS DE SALUD
Costo/M2 Metas Costo/M2 Metas Costo/M2
### ### 201,032.59 201,032.59 1.00 208,496.48 208,496.48 1.00 223,922.39 1,168.32 415,863.51 355.95 1,168.32 415,863.52 355.94 1,168.35
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,233.83 140,792.60 114.11 1,224.37 139,713.01 114.11 1,224.37 1,338.18 78,604.62 58.74 1,349.70 79,281.55 58.74 1,338.18
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,246.04 27,525.00 22.09 1,246.04 27,525.00 22.09 1,246.04 5,891.63 53,024.71 9.00 5,891.63 53,024.71 9.00 5,891.63 1,419.68 332,986.44 282.60 1,165.28 329,308.63 260.60 1,340.71
0.00 0.00 117.71 267.10 31,440.27 0.00 0.00 74,698.78 74,698.78 1.00 74,698.78 74,698.78 1.00 74,698.78
Ppto-IglesiaPata
Ppto-San Juan de Pampa
44,385.60 44,385.60 1.00 44,385.60 44,385.60 1.00 44,385.60 2,881.36 2,881.36 1.00 2,305.09 2,305.09 1.00 2,881.36 4,521.67 4,521.67 1.00 4,521.67 4,521.67 1.00 4,521.67
### ### 165,158.03 169,267.72 110,105.35 70,528.22
### ### 297,284.45 297,064.84
### ### 77,954.59 77,897.00 58,465.94 58,422.75
### ###
PRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA IPRESUPUESTO A PRECIOS PRIVADOS ALTERNATIVA I
POSTAS DE SALUDTotal
### 6,093,850.05 223,922.39 948,547.45 415,863.52 1,862,476.48
0.00 415,863.52 139,713.01 587,933.08 78,604.62 330,259.68
0.00 163,814.55 27,525.00 110,100.00 53,024.71 212,098.84 349,389.12 1,431,316.18
0.00 31,440.27 74,698.78 653,455.72
Ppto-Yanacullo
44,385.60 177,542.40 2,881.36 10,949.17 4,521.67 18,086.68
### 6,953,884.02 169,743.57 834,466.08 141,452.98 695,388.40
### 8,483,738.50 310,630.74 1,527,072.93
### 10,010,811.44 81,454.28 400,432.46 61,090.71 300,324.34
### 10,711,568.24