VENTANA VENTILACION VENTANA VENTILACION P1 BASCULA CONTROL BASCULA ver detalle RUMBO DE BASCULA RESPECTO A COORD. NORTE - SUR = -12º PATIO DE MANIOBRAS Area = 4052 M2 TUBERIA PVC Ø6" AREA EQUIPAMIENTO 30% DE LA CESION I PATIO ELS-3 TCS-2 EL-2 BASC .64 .41 TUNEL ENTRE SILOS SAG-1 y SAG-2 EL-1 AISLAMIENTO POSTERIOR CESION TIPO I (RECREACION ACTIVA 70%) PATIO TUNEL ENTRE SILOS SAG-1 y SAG-2 FOSO EL-1 TUNEL DE SECADO EJE VENTANA VENTILACION EN VIGA CORONA (v.d.) EJE VENTANA VENTILACION EN VIGA CORONA (v.d.) EJE VENTANA VENTILACION EN VIGA CORONA (v.d.) 45° 45° EJE VENTANA VENTILACION EN VIGA CORONA (v.d.) TUNEL ENTRE ELEVADORES EL-1 y EL-2 MURO DE CIMIENTO SILO 18.50 MURO DE CIMIENTO SILO R8.054 R8.454 98.25 .23 .40 6.76 .30 1.60 .30 7.15 .40 R8.454 (RADIO EXT. VIGA CORONA) R8.312 (RADIO PASADOR ENGANCHE ANCLAJE) R8.054 (RADIO INT. VIGA CORONA) 11.74 95.82 96.02 95.05 98.25 M-1 (h=4.00) M-8 h=4.00 M-2 h=4.00 M-9 h=2.00 M-7 h=2.00 M-10 h=4.00 SILO SP-3 98.25 96.95 96.95 99.05 M-4 h=1.00 M-3 h=1.00 1 2 3 4 A B C D E 11 10 9 8 7 6 5 4 3 2 1 THZ-1 inf M-6 h=3.00 M-5 h=5.00 SILO SP-1 SILO SP-2 Ext. Corona R2.375 Ext. Corona R2.375 Pasador Anclaje R2.300 Pasador Anclaje R2.300 BASE TR-1 BASE TR-2 A B C D E F G H I 11 10 9 8 7 6 5 4 3 2 1 LIMITE DEL LOTE LIMITE DEL LOTE LIMITE DEL LOTE LIMITE DEL LOTE 1.20 .90 .64 .41 1.20 .90 .90 1.20 24° 24° NICHOS DE REFERENCIA NICHO DE REFERENCIA 24° 24° 24° 24° 24° 24° TOLVA DE RECIBO R2.375 96.95 99.05 96.95 97.05 97.05 100.40 97.12 101.05 101.05 101.05 101.05 101.05 101.05 101.05 TOLVA SE-13 94.75 95.25 ZAPATA Y POZO RECOLECTOR DE DRENAJES Ø1.80m Y SALIDA EN Ø12" POZO 3 ESCALERA DE GATO R8.454 (RADIO EXT. MURO Y VIGA CORONA) R8.312 (RADIO PASADOR ENGANCHE ANCLAJE) R8.054 (RADIO INT. MURO Y VIGA CORONA) 97.65 96.95 RAMPA CONCRETO REFORZADO P= 30% REJILLA A.LL. POZO 5 REJILLA A.LL. RAMPA CONCRETO REFORZADO P= 20% .25 1.65 2.06 1.60 R.23 .30 .47 .30 .25 MUROS EN MAMPOSTERÍA Columna A Columnas B Columnas C Columnas D Columnas E Columnas A1 2.22 Tubo de 6" hacia pozo #5 12.00 m 1.40 2.60 2.35 2.85 12° SALA DE JUNTAS OFICINA DE GERENCIA RECEPCION OFICINA JEFE OPERATIVO CAFETERIA OFICINAS DE TRABAJO (SISTEMAS) BAÑOS DAMAS VESTIER BAÑOS CABALLEROS VESTIER P24 4 R3.00 ACCESO PEATONES ACCESO VEHICULOS CV2 CV3 CV1 CHA CHB CHC CHD CV5 CV4 R8.54 CASETA VIGILANCIA Ver detalle W.C CL Acceso principal Ver detalle ACCESO VEHICULOS ENTRADA PROVISIONAL PARA TRACTOMULAS ACCESO VEHICULOS POSTE POSTE POSTE POSTE POSTE POSTE PTAP Tanque Almacenamiento V=36 m³ Caseta de Bombeo L=2 m Ø 1 1/2" HG L=2 m Ø 3" HG CABEZOTE CONCRETO CICLOPEO C.I. 1.50 x 0.70 x 0.85 EN CONCRETO TUBO PVC Ø12" LIMITE DEL LOTE POSTE POSTE POSTE POZO POSTE POSTE CAMPAMENTO POSTE POSTE BAÑO POSTE CERRAMIENTO CON SISTEMA ESTRUCTURAL APORTICADO CON MAMPOSTERIA PROYECCIÓN CERRAMIENTO ESTRUCTURAL APORTICADO FUTURO A CONSTRUIR CERRAMIENTO CON SISTEMA ESTRUCTURAL APORTICADO CON MAMPOSTERIA R1.00 R1.00 R1.00 CUNETA ANDEN EXTERIOR ANDEN EXTERIOR ANDEN EXTERIOR SARDINEL 15CMS Laboratorio de materia prima 9.2m2 Caseta bascula 6.35m2 W.C 2.10m2 CLOSET TL TV LC DESCARGA DE MATERIA PRIMA INICIO DE RUTA FIN DE RUTA ESPERA TURNO DESCARGA ESPERA TURNO PRODUCTO TERMINADO Equipo Soldadura 220V Taladro de Arbol Pulidora Tronzadora TALLER Laboratorio de control de calidad de producto terminado 9.2m2 ZONAS VERDES AISLAMIENTO POSTERIOR Y RETIRO DE VÍA POSTES DE LUZ MOVILIDAD DESCARGA DE MATERIA PRIMA MOVILIDAD CARGA DE PRODUCTO TERMINADO ÁREA DE ESPERA DE TURNOS PATIO DE MANIOBRAS 1Ø1 1/2" EMT (3#4+1#8T) AWG/THHN/Cu L=78.0m Ø 6" S=1% L=78.0m Ø 6" S=1% L=4.4m Ø 6" S=1% L=8.2m Ø 6" S=2% L=10.3m Ø 4" S=1% L=27.5m Ø 4" S=1% 90° 90° 90° 90° 90° 90° 90° GFCI 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 12-TOF1 L=5.70 m Ø 4" S=1% C1 L=2.95 m Ø 4" S=1% L=2.60 m Ø 4" S=1% C2 L=78.0m Ø 6" S=1% C4 STAR L=4.4m Ø 6" S=1% L=8.2m Ø 6" S=2% L=10.3m Ø 4" S=1% L=2.4m Ø 2" S=2.5% L=3.8m Ø 4" S=1% L=27.5m Ø 4" S=1% C3 L=1.20 m Ø 2" S=2.5% L=3.0 m Ø 2" S=2.5% L=1.1m Ø 2" S=2% L=5.70 m Ø 4" S=1% L=6.0 m Ø 4" S=1% C6 L=26.5m Ø 4" S=1% L=1.20 m Ø 2" S=2.5% C6 L=26.5m Ø 4" S=1% L=1.20 m Ø 2" S=2.5% L=7.76m Ø 4" S=1% L=10.22m Ø 4" S=1% C5 PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO B" e=0.15m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PLACA EN CONCRETO REFORZAMIENTO "TIPO C" e=0.12m PUERTA DE ACCESO PEATONAL Ver detalle PLACA EN CONCRETO REFORZAMIENTO "TIPO D" e=0.12m BORDILLO T-1 BORDILLO T-2 BORDILLO T-3 BORDILLO T-4 BORDILLO T-6 BORDILLO T-7 BORDILLO T-8 BORDILLO T-9 BORDILLO T-10 BORDILLO T-11 BORDILLO T-12 BORDILLO T-13 PLANTA ELECTRICA DE EMERGENCIA CUMMINS C300D6 Transformador Tipo Seco Clase F - 3F 13200/440V - 800KVA Tablero General Acometidas TGA Tablero Banco de Condensadores Transform. Tipo Seco 440/220V 100 KVA Tablero Cargas Emergenc. Cuarto Planta Eléctrica 300 kW Stand By - 440V de Emergencias Cuarto Tecnico Tableros Electricos Subestación Electrica Transformador 800KVA Tablero Ilum. Ext Tablero SG-SUB 9 C5 FUTURA INSTALACIÓN DE PLANTA ELÉCTRICA Transformador Tipo Seco Clase F - 3F 13200/440V - 800KVA Tablero General Acometidas TGA Tablero Banco de Condensadores Transform. Tipo Seco 440/220V 100 KVA Tablero Cargas Emergenc. Cuarto Planta Eléctrica 300 kW Stand By - 440V de Emergencias Cuarto Tecnico Tableros Electricos Subestación Electrica Transformador 800KVA Tablero Ilum. Ext Tablero SG-SUB CODIGO PLANO ESPECIFICACIONES DE LOS MATERIALES: IND CODIGO PROYECTO A1 TIPO NUMERO PLANO PLANO ESCALA PLANO CONTIENE: SISTEMA DE RESISTENCIA SÍSMICA: MUNICIPIO DE EL ZULIA ZONA DE AMENAZA SÍSMICA: ALTA CONCRETO CONCRETO RESISTENCIA DEL CONCRETO A LOS 28 DIAS CÓDIGO MUNICIPIO NSR-10: 54261 F'C= 210 KG/CM. 21MPA ACERO Ø>= # 4 Ø<= # 3 Ø>= # 5 SOLDADURA E-7018,NORMAS AWS PERFILES ESTRUCTURALES TIPO ACESCO GRADO 50 REFUERZO VARILLA FY= 4200 KG/CM 420MPA FY= 2400 KG/CM 240MPA REFUERZO VARILLA REFUERZO VARILLA FY= 4200 KG/CM 420MPA Disipacion de energia = Grado de capacidad de DES UBICACIÓN CERRAMIENTO CONTEXTO URBANO DISTRIBUCION INTERNA DE EDIFICACIONES TOPOGRAFIA FECHA : ESCALA: INDICADAS ASOZULIA PROYECTO: C O L O M B I A NORTE DE SANTANDER MUNICIPIO SAN JOSÉ DE CÚCUTA MOLINO Y PLANTA DE SECADO DE ARROZ DE ASOZULIA LOCALIZACIÓN GENERAL DEL PROYECTO MARZO DE 2021 ALVARO ANTONIO RUIZ TARAZONA RUBÉN DARIO ORTIZ OÑORO RUBEN DARIO FERNANDEZ CARDENAS ARQUITECTO Mat. Prof. # CN250-130614 Mat. Prof. #54202-55424 APROBÓ INGENIERO CIVIL Mat. Prof. #A21372016-1090372245 JUAN CARLOS SAYAGO ORTEGA Mat. Prof. # 54202-43863 NTS INGENIERO CIVIL-DISEÑO HIDROSANITARIO INGENIERO ELECTROMECANICO SAMUEL MEDINA JAIMES Mat. Prof. # 54202-46109 NTS INGENIERO ESTRUCTURAL OBSERVACIONES: ANDRÉS FELIPE ROZO TORRES Mat. Prof. #54202-370724 INGENIERO CIVIL 4