Top Banner
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland, PK Energy
24

Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

Dec 17, 2015

Download

Documents

Shawn Francis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

Plant Information Model (PIM)Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant

Laurent Perkins, Bentley

Kent Freeland, PK Energy

Page 2: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• EPRI Plant Information Model (PIM)

• Industry PIM Team Initiatives

• Other Industry Initiatives – Harmonization

• Data-Centric CM and Asset Information Management Initiative

• Knowledge & Sharing

Breakout Topics

Page 3: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Evolving open source standard for information handover/turnover• Standard Handover Framework • Configuration Management (CM) Taxonomy and

Relationship Traceability Frameworks

• Eighty (80) percent usable for implementation of world class CM and Information Handover Solutions

EPRI Plant Information Model (PIM)

Page 4: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Standard Handover Framework• FCI Types / Doc Types• Properties / Attributes Data Dictionary

• Configuration Management (CM) Taxonomy and Relationship Traceability Frameworks• CM Taxonomy• Defined Relationships

Industry PIM Team Initiatives

Page 5: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• NIRMA - Nuclear Information & Records Management Association

• Technical Guidance Document on Turnover of Records and Incremental Handover of Information for New Nuclear Power Plant “The What”

• FIATECH• ISO 15926 Information Patterns (IIP) • Harmonizing Equipment Data (HEED)• Equipment Data and Conformance (EDRC)

• Other Industries

Other Industry Initiatives - Harmonization

Page 6: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

EPRI Plant Information Model (PIM) is part of this Initiative

Data-Centric CM and Asset Information Management Initiative

Page 7: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Benchmarking• 9 Operating Nuclear Plants• 2 New Build Nuclear Plants• 3 International New Build Utilities• 3 Large High-Tech Data-Centric Non Power

Industries• 4 Solution Providers• National Institute of Standards and Technology

(NIST)

Data-Centric CM and Asset Information Management Initiative

Approach

Page 8: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Validate the costs to build a data centric model with different end states based on industry best practices

• Use benchmarking to define the opportunity for savings and validate against other industry studies and experience

• Create a Probabilistic Investment Model and validate results

Data-Centric CM and Asset Information Management Initiative

Approach (cont.)

Page 9: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Prepare Use Cases based on different plant current states and desired end states

• Independent Expert Panel that provides input on the model and challenges the assumptions.

Data-Centric CM and Asset Information Management Initiative

Approach (cont.)

Page 10: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Decisions are made on data, not documents. Data must be centralized, accurate, change controlled, and easily accessible.

• A “data-centric” CM system will provide a variety of plant activities with reliable, controlled data – the “single source of truth”.

• Need to define the cost of installing and maintaining a data-centric system from different starting points.

Data-Centric CM and Asset Information Management Initiative

Discovery

Page 11: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Need to define both the “hard” and “soft” savings that a data-centric system has on the cost of operating and maintaining the plant.

• The model accounts for the benefit of data accessibility used by Engineering, Licensing, Procurement, Operations, and Maintenance.

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 12: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Potential End States – Each State Builds on the Prior State

1. Electronic Document Centralization2. Documents -Tags Cross Referenced3. Data Centralization4. Relationship Model 5. 2D/3D Model Integration with data model6. 2D/3D Model Authoring Tool Integration

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 13: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

1. Electronic Document Centralization Master Document List (MDL) – “Critical

Documents” in electronic format; all documents indexed in a centralized document control system

2. Documents -Tags Cross Referenced Expand Master Equipment List (MEL) to include

other tag types (piping components, cable #s, weld #s, relays, etc.)

Cross Reference Tags to Critical Documents

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 14: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

3) Data Centralization Centralize siloed databases with the MEL

Database “Mine” and validate other mission critical data

contained in documents

4) Relationship Model Major Transition requiring moving from a

“Tabular” data structure to an Object-Relationship data structure

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 15: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

4) Relationship Model (cont.) Major Transition requiring moving from a

“Tabular” data structure to an Object-Relationship data structure Benefit:

Ability to build a lifecycle data model that relates licensing requirements to design to procurement to installation to O&M.

Ability to perform lifecycle impact reviews if anything is changed in the relationship “Chain”

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 16: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

4) Relationship Model (cont.) Major Transition requiring moving from a

“Tabular” data structure to an Object-Relationship data structure The Relationships build Knowledge into the data

structure by relating:Licensing Requirements to Design DocumentsDocument Design Outputs to Document Design

InputsDesign Requirements to Asset Tests and

Inspections

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 17: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

5) 2D/3D Model Integration Identify areas to be modeled and maintained Create ability to view models Hot Spot Tags for accessibility to data model

6) 2D/3D Model Authoring Tool Integration Ability to conduct engineering design and

analysis from the models and update data

Data-Centric CM and Asset Information Management Initiative

Discovery (cont.)

Page 18: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• SHARE and LEARN the WHAT, HOW and WHY • Facility Configuration Information (FCI)

Management and Handover and/or Turnover during Major Projects• Handover is the transfer of “approved-for-use”

information from an Engineering Procurement Construction (EPC) or Consortium entity to the Owner/Operator for use in pre-operational readiness activities.

• Turnover is the official transfer of “as-built” and final information from an EPC or Consortium entity to the Owner/Operator for use in the operation and maintenance of the operating unit.

Knowledge & Sharing

Page 19: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• SHARE and LEARN the WHAT, HOW and WHY • Information sets that are or would be part of

Multi-dimensional Data Models and MEL databases, as well as traditional drawings, documents and records to help move the industry from a purely document-centric FCI model to a hybrid data-centric / document-centric approach.

Knowledge & Sharing (cont.)

Page 20: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• Owner Operator Questions• What have been your key successes (processes,

procedures, strategies, automation) with respect to Handover and/or Turnover information exchange in support of Startup, Operations and Maintenance?

• In recent major projects, how did you get information delivered to you and when was it delivered?

• What would you change for future projects to improve information exchange?

Knowledge & Sharing (cont.)

Page 21: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

• EPC, NSSS or Vendor Questions• What have been your key successes (processes,

procedures, strategies, automation) with respect to vendor and contractor Handover and/or Turnover information exchange in support of Engineering, Procurement, and Construction?

• In recent major projects, how did you deliver information to the owner and when was it delivered?

• What would you change for future projects to improve information exchange?

Knowledge & Sharing (cont.)

Page 22: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

Questions

Page 23: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

Thank You

Page 24: Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,

Contacts

Russell [email protected] Perkins [email protected] Freeland [email protected]