Page 1: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018
Page 2: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Planning of the LHC in YETS 2017-2018

and LS2The baseline frameworks of YETS 2017-2018 and LS2 including the major activities, will be reviewed.

An overview of the activities related to HL-LHC, Consolidation and Maintenance, to be implemented during LS2 will be given.

Marzia Bernardini, EN-ACE-OSS

LHC- Coordination meeting, 30th May 2017

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 2

Page 3: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Contents

LS2 period overview

YETS 2017-2018 duration: the frame

LHC during LS2

- Evolution of the activities approved in Plan

- HL-LHC updates

- Diodes consolidation

- Open points

Conclusions

Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 3

Page 4: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LS2 period overview

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 4

Page 5: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Long Shutdown

Commissioning

Operation

Technical Stop

YETS 2015 EYETS 2016 YETS 2017 LS2

Time frame

• Extended YETS 2016-2017 has been completed (21 wks)

• YETS 2017-2018 will start in 7 months

• LS2 will start in a less than 2 years

Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 5

Today

Page 6: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

YETS 2017-2018 duration:

the frame

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 6

Page 7: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC-YETS 2017-18

• Several options have been studies, to define a baseline for a standard Year End Technical Stop

Standard YETS baseline

• The CV maintenance needs 9 wks for the standard maintenance during the YETS

• only 2 Technical stops in 2017

• reduced maintenance during the YETS 2015-2016 (LS1 completion in 2015, and 3 TS)

• TE-CRG needs 2wks for pumping, boil off and cryotuning, following the CV maintenance

• The duration of ELQA, UPS tests, powering tests and machine checkout is confirmed to 2 wks

• The LHC Machine will be emptied of Liquid Helium (20 K) before the Christmas closure12 days are needed BEFORE the Christmas closure

• UPS tests and a complete ELQA campaign on 13kA are included in the baseline

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 7

Page 8: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Critical path:

• 9 wks of CV maintenance

(start in parallel with cryo

empty of 2 wks)

• 2 wks Christmas closure

• Standard Cryogenics

maintenance – 6wks

(in the shadow of CV

maintenance)

• 2 wks cryo reconditioning

+ pumping + boil off +

cryo tuning + UPS & cryo

recovery + ELQA

• 2 wks UPS tests,

powering test and

machine checkout

From week 50 to week 12

13 wks

+ 2 wks Xmas closure

LHC-YETS 2017-18

LHC coordination meeting, 30th May 2017

LMC 22nd February 2017

Marzia Bernardini EN-ACE 8

Page 9: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 9

New

update

-1 week

-1 week

+2 weeks

No change

New

From beam OFF to

Hardware Tests

Machine access

Linac4 to be added

Information for

Linac2

Time of re-

commissioning of

the injectors and the

beam availability for

the fixed targets

have been defined

by BE-OP re-

commissioning

coordinators

LHC-YETS 2017-18

Page 10: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC-YETS 2017-18

• The duration of the YETS 2017-2018 for the LHC was validated by LMC to 15 wks beam to beam

• 1 additional week (wrt v. 3.0) is therefore available for the Injectors, and it is dedicated to HWC

• In agreement with BE-OP and EN-ACE, the commissioning duration has been extended in the injectors from 3 wks to 5 wks

• There is no impact on the machine access period for the SPS, where the YETS activity on the critical path is located

• The “Length of YETS 2015-2016 / EYETS 2016-2017 / YETS 2017-2018” document is under approval

Open Points

• Radiological aspects related to CMS activities during YETS• CMS would appreciate a few days low lumi work before beam stop which acts as cooling time;

5 days would be fine, even 3 would help a lot …

• If CMS is forced to launch the yoke opening the day p-p high lumi running stops, that would expose people (not just CMS but also EN-HE and TE-VSC people) to about 5 times the dose-rate so far learned to deal with.

• Warm up of the inner triplets of LSS5 for CMS alignement at warm

• Optimisation of the beam commissioning period

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 10

Page 11: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC during LS2

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 11

Page 12: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Master schedule of LS2 EDMS ACC-PM-MS-0002 v.1.0

Marzia Bernardini EN-ACE 12

Page 13: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC-LS2 the frame

During the LS2, three main categories of activities will be implemented

- Maintenance: Cryogenics, Cooling and Ventilation, Vacuum, Electrical Systems,

Collimation, Access System, Fire detection, ODH, …

- Projects: HL-LHC & LIU

- Consolidation & additional activities: this could concern all equipment of the LHC

machine, including the consolidation of dipole diodes

The frame

- Warm up at ambient Temperature of the entire LHC Machine, and related tests

(Powering tests, ELQA, Vacuum leak tests, …)

- Cool down & related tests (Powering tests, ELQA, Vacuum leak tests, …)

- LSS3 and LSS7 according RP cool down

Radiological classification and dose rate estimates LHC

Dose rate increase as compared to EYETS 2016/17 by a factor 2-3

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 13

Page 14: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC-LS2 activities approved in Plan @ January 2017

LHC coordination meeting, 30th May 2017

Maintenance

1 wk per point,

no access,

reserved to EN-EL

for major

maintenance

Major maintenance

on all the

cryogenics system

Marzia Bernardini EN-ACE 14

Page 15: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC-LS2 : change of 20 cryomagnets

LHC coordination meeting, 30th May 2017

Quench heater failure, on magnet removed during LS1

Internal splice resistance due to no AgSn between cables and between cable/stabilizer, on magnet removed during LS1

Heavy NC – magnet to be changed

Change or modification to be approved

Warm up, cool down and related tests required on the entire LHC machine !

Marzia Bernardini EN-ACE 15

Page 16: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Consolidation

Thanks to

consolidations during

LS1 and before LS2,

no power limitations

during LS2

Marzia Bernardini EN-ACE 16

LHC-LS2 activities approved in Plan @ January 2017

Page 17: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

17Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017

LHC-LS2: R2E activities during LS2

R2E Project • 752x New FGC Control Upgrade in Tunnel [FGCLite] – Done • 348x New FGC Control Upgrade in RR [FGCLite] • 120x New LHC600A Power Converter for RR [R2E-LHC600A-10V]• 1500x New LHC4-6-8kA Modules for RR [R2E-LHC4-6-8kA-08V]Total = [120 Racks + 400 Palettes] (Removal & Installation)

New equipment but compatible with existing equipment - Only Transport service will be needed !

LHC-FMCM RD1.LR1 & LR5 / RD34.LR3 & 7• 4x new Power Converters [SATURN]Total = 20 Racks* Rack* = Rack Equivalent (0.6m)

RR57

RR53

RR13RR17

ED

MS

N°1

731488 V

.1

Page 18: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

18

Location Capacity (t)Travel Height

(m)Floors

Current usage

(Aug. 2015)Replacement timeslot

PX24 (ALICE) 0,63 51,21 3 733’000 Dec. 2016 - Feb. 2017, EYETS

PZ85 (LHCb) 1 103,67 2 1’058’000 Jan. 2017 - Mar. 2017, EYETS

PM54 (CMS) 3 97,05 4 847’000 Sept. 2017 – Nov. 2017, Run 2

PM85 3 99,56 2 1’030’000 Dec. 2017 – Feb. 2018, YETS

PM15 1 82,5 2 343’000 Dec. 2018 – Feb. 2019, 1st of LS2

PM25 1 45,35 2 236’000 Feb. 2019 – Apr. 2019, 2nd of LS2

PM76 3 97,18 2 829’000 Apr. 2019 – Jun. 2019, 3rd of LS2

PZ33 3 99,25 2 1’074’000 Jun. 2019 – Aug. 2019, 4th of LS2

PZ45 1 143,54 2 330’000 Aug. 2019 – Oct. 2019, 5th of LS2

PM56 1 90,01 2 1’078’000 Oct. 2019 – Dec. 2019, 6th of LS2

PM65 3 94,8 2 697’000Aug. 2020 – Oct. 2020,

Cooldown of LS2

PX15 (ATLAS) 3 91,81 3 883’000 Dec. 2020 – Jan. 2021, Last of LS2

10 weeks of interruption for each intervention

Impact of lessons learned during EYETS 2016-2017 to be defined

LHC-LS2: lifts replacement overview

Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017

Page 19: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Upgrade and Inspections

Additional activities

Marzia Bernardini EN-ACE 19

LHC-LS2 activities approved in Plan @ January 2017

Page 20: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

HL-LHC and LIU

Marzia Bernardini EN-ACE 20

Situation of theTI8 after the transfer line collimator renewal for LIU Situation of theTI2 after the transfer line collimator renewal for LIU

Present TCDI area in TI8

LHC-LS2 activities approved in Plan @ January 2017

Page 21: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 21

New approved activities, mostly compatible with the present LS2 framework schedule!

LHC-LS2 new activities approved in Plan @ May’17

Page 22: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 22

HL-LHC-LS2 activities Chamonix 2017 Recall

Page 23: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

WP5 - Collimation

- Installation of eight Target secondary collimators TCSPM

in LSS7 for Halo cleaning

- Installation of Dispersion Supressor collimators TCLD

in LSS7 (11 T) and LSS2 (LEP)

WP8 - Collider & Experiment Interface

- Installation of a new TAXN at both sides LSS8

WP9 – Cryogenics

- Cryogenics upgrade at P4

WP11 - 11T DS dipole

- Installation of two full assemblies in LSS7

- Installation of two new connection cryostats

allowing the installation of collimators in LSS2

W12 - Beam Vacuum

- In-situ aC-coating at P2 & P8

WP13 - Beam Diagnostics

- Installation of BPW prototype at P4

WP14 - Beam Transfer & Kickers

- Installation of 6 TDIs & 2 TCDD at P2 & P8

- Coated installation in all MKIs

WP17.1 - Civil Engineering

- Building underground and surface structures at P1 & P5

- Junction of UPRs with LHC tunnels existing facilities in LSS1 and LSS5

HL-LHC-LS2 activities

Marzia Bernardini EN-ACE 23

Page 24: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

HL-LHC-LS2, updates on WP17

Marzia Bernardini EN-ACE 24

Personnel safety exit (UPR) - Meeting on 10/04 with HSE and FB

• Proposal of a temporary configuration (3 manholes 1mx1m)

in order to not impact forward detector cabling and other

services

• Not well received by HSE and FB main issue is the rescue

of injured persons via the manholes.

New proposals under study:

• Excavation of doors (final configuration) from the LHC side at

the beginning of LS2 to give time for de-cabling, re-cabling,

commissioning of services (including FW detectors) and

repairing of possible tunnel damages:

Construction via a separate contract

Bigger impact on LS2 schedule and LHC machine (dust,

transport, access, passage restriction, hardware removal)

Not the favorite proposal for SMB

The cables and services rerouting (including FW

detectors) in the LHC tunnel could be anticipated to YETS

2017-2018

• Excavation of larger apertures (1.7mx1m) from the HL-LHC

side at the end of LS2. (see next slide)

UPR53Door

UPR57Door

UPR13Door

UPR17Door

UPR53Door

UPR57manhole

UPR13Manhole

UPR17Manhole

Courtesy Laurent Tavian

Page 25: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

HL-LHC-LS2, updates on WP17

Marzia Bernardini EN-ACE 25

• Larger “reduced apertures” (1.7 m x 1 m) could be accepted by HSE and FB as a temporary

measure

• 50 to 60 cm of margin are existing between the excavated apertures and the critical services:

SMB and the 2 consultants are assessing the feasibility and the corresponding risk.

1700

500 -

60

0

Courtesy Laurent Tavian

Page 26: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC Chamonix Workshop 2017

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 26

Presently:

- 1 wk for powering tests at the

beginning of LS2

- HWC & training quench campaign at

the end of LS2

Page 27: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 27

Courtesy Jean-Philippe

Marzia Bernardini EN-ACE

Inputs from the diodes consolidation working group

Page 28: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 28

Courtesy Jean-Philippe

Assumptions

No interventions on quadrupole

Only in the arc (not LSS)

6 efficient working hours per day

4 non working weeks

1 sector opened in 2 weeks, reclosed in 3 weeks

5.5 hours to consolidate one diode (depending on solution)

(10% margin – small NCs)

10 diodes consolidated per working day [All operations]

SIT : same as SMACC

“Scaling” from SMACC for ElQA, Leak tests, welding,…

BE-OP support, especially for ElQC

3 weeks for learning

3 months for NC solving (SMACC experience)

TOTAL : 18 months

Same type of human resources as SMACC

(Staff, collaboration, FSU,…) Means oriented

Inputs from the diodes

consolidation WG

Marzia Bernardini EN-ACE

Page 29: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 29

RE

18

RE

22

RE

28

UJ3

2

RE

38

RE

42

RE

48

RE

52

RE

58

RE

62

RE

68

RE

72

RE

78

RE

82

RE

88

RE

12

Arc 23 Arc 34Arc 12

MAY MAY

Arc 81Arc 78Arc 56 Arc 67Arc 45

APR

8 8

1 1

FEB FEB

2013

2013

2 2

3 3

MAR MAR

4 4

5 5

6 6

7 7

12

APR9 9

10 10

11 11

16 16

13 13

14 14

15 15

12

JUNE

17 17

JUNE18 18

19 19

AUG AUG

26 26

27 27

20 20

JULY

21 21

JULY22 22

23 23

28 28

29 29

30 30

24 24

25 25

SEPT SEPT31 31

32 32

33 33

34 34

42 42

OCT OCT

35 35

36 36

37 37

38 38

47 47

JAN JAN

48 48

43 43

DEC DEC44 44

45 45

46 46

NOV

39 39

NOV40 40

41 41

2014

2014

49 49

50 50

51 51

52 52

FEB FEB53 53

54 54

55 55

56 56

MAR MAR57 57

58 58

59 59

60 60

APR APR

61 61

62 62

63 63

64 64

69 69

JUNE JUNE70 70

71 71

72 72

MAY MAY

65 65

66 66

67 67

68 68

73 73

JULY JULY

74 74

75 75

76 76

77 77

AUG

78 78

AUG79 79

80 80

81 81

82 82

SEPT SEPT83 83

84 84

85 85

86 86

OCT OCT

87 87

88 88

NOV NOV92 92

93 93

94 94

89 89

90 90

91 91

DEC

95 95

DEC

96 96

97 97

98 98

99 99

Cool-Down

Cool-Down

Cool-Down

Cool-DownELQA

Powering tests

ELQA

UPS

ELQA

Leak tests

Powering tests

ELQA

Warm Up

Cool-Down

UPS

Preparation

Flushing

Powering tests

Powering tests

Powering tests

ELQA

Preparation

Flushing

Powering tests

ELQA

WARM UP

ELQA

POWERING TESTSUP

S

POWERING TESTS

ELECTRICAL Maint.

ELECTRICAL Maint. (No

PREPARATION

FLUSHING

COOL DOWN

FLUSHING

PREPARATION

C

1

5

R

1A

2

2

R

1

C

3

0

R

1

C

3

3

R

1

C

3

3

L

2

A

2

9

L

2

B

2

5

R

2

A

2

3

R

2 C

1

5

L

3

Q

7

R

3Q

2

3

R

3

Q

2

6

R

3

Q

2

7

R

3

B

3

2

R

3

C

1

7

R

4

B

3

1

R

4

C15R

1Powering tests

ELQA

Warm Up

ELQA

Leak tests

A22R

1

C30R

1

C33R

1

C33L

2

A29L

2

UPS

Preparation

Flushing

Warm Up

ELQA

ELQA

Leak tests

A23R

2

B25R

2

Warm up

ELQA

CSCM

ELQA

Leak tests

Q7R3

Q23R

3

A26R

3

Q27R

3

B32R

3

Preparation

Flushing

Powering tests

ELQA

C17R

4

B31R

4

UPS

UPS

Preparation

Cool-Down

Flushing

Powering tests

ELQA

ELQA

Warm Up

ELQA

Leak tests

Powering tests

ELQA

Warm Up

ELQA

Leak tests

UPS

UPS

ELQA

Powering tests

ELQA

Preparation

ELQA

Leak tests

UPS

Powering tests

ELQA

Powering tests

ELQA

Warm Up

PreparationFlushing

Flushing

UPS

Cool-Down

Powering tests

Preparation

Flushing

ELQA

Leak tests

Powering tests

ELQA

Warm Up

Electrical maintenance - No access

Christmas

Pipe

s & U

TA

Electrical maintenance - No access

Cool-Down

UPS

UPS

UPS

UPS

UPS

UPS

Q5L8

C15L

3

B30R

7

B21L

8

0 0

ELQA

Powering tests

Electrical maintenance - No access

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

AUG Tests AUG Tests

AUG Tests

AUG Tests

DSO Tests

AUG Tests

D

F

B

A

DFBA

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

Electrical maintenance - No access

Electrical maintenance - No access

SF-W

UW-

DYPB

Christmas

Test AUG (R2E)- No access

Test Fire Detection (R2E) - No access

Test Fire Detection (R2E) - No access

Test AUG (R2E) - No accessAUG TestsAUG Tests

Modification ODH (R2E) - No AccessDetection

ODH_ANNUA

AUG Tests

Electrical maintenance - No access

D

F

B

X

IC train

IC train

IC train

IC train

IC train

IC train

IC train

IC train

Train Roadmap: SMACC review Nov. 2012

Marzia Bernardini EN-ACE

Analogies wrt LS1

Page 30: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 30

Detailed Train: SMACC review Nov. 2012

RE

58

RE

62

NOV

2013

AUG

SEPT

OCT

Arc 56

FEB

MAR

APR

MAY

JUNE

JULY

IC trainD

F

B

A

D

F

B

X

Powering tests

ELQA

ELQA

Leak tests

Warm up

Preparation

Flushing NOV

20

13

AUG

SEPT

OCT

FEB

MAR

APR

MAY

JUNE

JULY

Marzia Bernardini EN-ACE

Analogies wrt LS1

Page 31: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 31

Daily activities: SMACC review Nov. 2012

TRAIN TRAIN

6h00 8h00 11h00 15h00

Electrical non conformities

17h0010h00

HV ELQAPreparation

ELQA

6h00

Transport et RX

23h00

Train A

Marzia Bernardini EN-ACE

Analogies wrt LS1

Page 32: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

LHC-LS2 schedule in progress

Marzia Bernardini EN-ACE 32

Presented in Chamonix 2017

Page 33: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 33Marzia Bernardini EN-ACE

LS2 frame schedule

Page 34: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 34Marzia Bernardini EN-ACE

LS2 train for diodes consolidation

Page 35: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 35Marzia Bernardini EN-ACE

LS2: magnets exchange, 11T & LEP

Page 36: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 36Marzia Bernardini EN-ACE

LS2: global overview

Page 37: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Concerns and Open Points for LS2

• HL-LHC

• Presently the dates and the scope of the civil engineering works in the LHC machine are not defined. This could

impact the activities to be performed during the YETS 2017-2018 for cables and services rerouting

• All the activities generating dusts must be performed when the IC are closed

• The activities in preparation of LS3 should no be slowed down by the dipole diodes consolidation (impact on the

critical path of LS3)

• The strategy for the lift replacement should be re-validated following the lesson learnt during the EYETS

2016-2017

• The date of the PZ33 lift replacement should be reviewed, to cope with the dipole diodes consolidation

• The magnets to be replaced during LS2 must be defined: this could impact the workload of the special

intervention team in charge of the NC

• The replacement of the Inner Triplets in LSS1R during the LS2 should be studied

(reduced performances of the orbit correctors in R1, following the EYETS 2016-2017)

• The impact of the diodes consolidation on the HWC should be defined

• The coordination of the overall surface logistic, for all the machines and experimental areas should be

centralised (transport, storage areas, surface facilities, …)

Reminders

• The readiness of the equipment for the installation, is under the responsibility of each Group

• The worksite activity management will be performed directly by the Groups for their activities

(as during YETS and EYETS)

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 37

Page 38: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

201920182017

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

EYETS YETS

Coordination meetings for the YETS

Integration studies & ECR approval process for YETS

ECRs approved(to be submitted at least 2 months before the approval )

IMP

AC

T

app

rova

l

Activities approved in PLAN tool (Version 2)

The Frame is consolidated and first draft

issued

Consolidated schedule

LS2

Integration studies & ECR approval process for LS2

ECRs approved (to be submitted at least 2 months before the approval deadline)

LS2 Schedule iterationsCoordination meetings with

Groups for LS2

Roadmap towards YETS and LS2

Marzia Bernardini EN-ACE 38

Page 39: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Roadmap towards YETS and LS2

Marzia Bernardini EN-ACE 39

Week 24 - 13th June – Activities and tests during YETS and LS2 – The frame (closed session)

TE - CRG - K. Brodzinski / G. Ferlin / A. Perin

EN - CV- S. Deleval

BE - ICS – N. Broca

EN – EL – B. Saint Sulpice / H. de Maynard

Week 25 - 20th June:

LHC-TS1 preparation: EN-ACE-OSS

Week 26 - 27th June:

LHC-TS1 preparation: EN-ACE-OSS

Week 27- LHC technical stop 1

Week 28- 11th July – Activities and tests during EYETS

Collimation - Stefano Redaelli

EN – STI – Inigo Lamas / Marco Calviani / Jerome Lendaro

EN-EL Reminder – Jean Claude Guillaume

Week 29- 18th July

EN-HE – Damien Lafarge

TE-MSC- Philippe Schwarz/Philippe Denis

EN-ACE-SU – Jean Frederic Fuchs/Dominique Missiaen

Summer Holidays !

Page 40: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Roadmap towards YETS and LS2

Marzia Bernardini EN-ACE 40

Week 34 – 22nd August

EN-ACE-OSS: YETS & LS2 Overview and Updates

Week 35 – 29th August

BE-RF – N. Schwerg

BE-BI – G. Schneider/R. Veness

TE-VSC –G. Bregliozzi / Eric Page / Jaime Perez

Week 36 - 5th September:

LHC-TS2 preparation: EN-ACE-OSS

Week 37 - 12th September:

LHC-TS2 preparation: EN-ACE-OSS

Week 38- LHC technical stop 2

Week 39 – 26th September

SMB-SE – Frederic Magnin / Christophe Biot

TE-MPE - Giorgio D’Angelo/ Reiner Denz / Richard Mompo

Week 40- 3rd OctoberEN-EL-FC: Cabling – Jean Claude Guillaume / Antonio Gonzales

TE - EPC: Power converters activities – Valerie Montabonnet / Hugues Thiesen

Week 41- 10th October

EN-HE-HH – Serge Pelletier

TE-ABT – Francesco Castronuovo/Laurent Ducimetiere

ECR Overview for YETS & LS2 – Anne Laure Perrot

Week 42- 17th October

TE-CRG Updates - K. Brodzinski / G. Ferlin / A. Perin

BE-OP – Mirko Pojer

RP Recommendations – Cristina Adorisio / Christophe Tromel

Page 41: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Roadmap towards YETS and LS2

Marzia Bernardini EN-ACE 41

Scope of the presentations

- Activities to be performed during YETS 2017-2018 AND LS2

- Contraintes generated

- Safety aspects

- Support needed

Duration 15 minutes (+10 minutes questions)

Page 42: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Reminder: General Safety instruction

Marzia Bernardini EN-ACE 42

COORDINATION & SCHEDULING of the activities in the respect and application of CERN

safety rules

Guidelines and rules implemented during technical stops and shutdowns

Follow up during coordination meetings and via IMPACT

Training for work supervisors from summer 2017

Page 43: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Contact persons inside EN-ACE

Marzia Bernardini EN-ACE 43

LHC coordination

- Marzia Bernardini

planning frame: powering

tests, Cryogenics activities,

CV surface maintenance,

ELQA tests, UPS

Activities in the ARCs

- Maria Barberan

Activities in LSS

- Sebastien Bustamante

Activities in Service Areas,

TI2 and TI8

LHC EROS (Engineering Referent for Operational Safety)

- John Etheridge

- Gerard Bailly

- Cyrille Bedel

- Michel Bonnet

- Emmanuel Paulat

EROS-Safety (Health and Safety)

[email protected]

Lock out

- Gerard Pastor

- Romual Bihery

Page 44: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

Contact persons inside EN-ACE

Marzia Bernardini EN-ACE 44

Page 45: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

• The duration of the YETS 2017-2018 is now validated to 15 wks

• The preparation of the LS2 already started

• The Plan version 2 shall be completed by June 2017, to reflect the LS2 activities

• The activities of HL-LHC are well identified, but the detailed schedule and sequencing of their implementation should be defined in 2017

• Dipole diodes consolidation

• The activities related to the dipole diodes consolidations fit in the LS2 schedule

• The duration of the complete diode consolidation is 51 wks, including the Xmas closure.3 wks are available at the beginning of the project for learning.Additional time (about 2.5 months) will be available for non conformities resolution, if needed

• The project organization should be similar to that implemented during LS1 for splices consolidation (SMACC)

• The first draft of the LHC-LS2 schedule, identifying the critical path, could be issued in Q1-’18

• The approval process of the main changes will start in 2017 and must be completed by Q1-’18

• 2017 will be a challenging year, due to the parallel preparation of technical stops, YETS 2017-2018 and LS2!

• The main concern is related to the resources availability during the LS2, to prepare and to not compromise the LHC activities for LS3

Conclusions

Marzia Bernardini EN-ACE 45

Page 46: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018
Page 47: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

Backup slides

LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 47

Page 48: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

P1

P2

P3

P4

P5

P6

P7

P8

WP11

DS collimation with

11 T dipoles

WP5

TCSPM

collimation

WP12

In-situ

coating

WP8

Mini TAN

WP14

D1 Mask

TDIS & MKI

WP17.1

Civil

Engineering

works

WP9

Cryo upgrade

WP13

BPW & BGV

WP11

DS collimation

with LEP

WP12

In-situ

coating

WP17.1

Civil

Engineering

works

WP14

D1 Mask

TDIS & MKI

LEN

LEP

LEP

LEN11 T11 T

HL-LHC-LS2 underground activities

48

Page 49: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

HL-LHC LS2 junction UPRs with LHC tunnels

facilities in LSS1 and LSS5

LHC coordination meeting, 30th May 2017

UPR17

UPR13 UPR57

UPR53

Marzia Bernardini EN-ACE 49

Page 50: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

LHC-LS2 schedule in progress

Marzia Bernardini EN-ACE 50

Page 51: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017

HL-LHC-LS2, updates on WP17

UPR17

Tunnel LHC RI171

UPR13

UPR57

UPR53

Marzia Bernardini EN-ACE 51

UPR53

The HL-LHC civil engineering schedule needs to be optimised to fit in the LS2

Page 52: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LS2 vs LS3 preparation: HL-LHC WP3 (1/2)

LHC coordination meeting, 30th May 2017 52Marzia Bernardini EN-ACE

Page 53: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LS2 vs LS3 preparation: HL-LHC WP3 (2/2)

LHC coordination meeting, 30th May 2017 53Marzia Bernardini EN-ACE

Page 54: Planning of the LHC in YETS 2017-2018€¦ · Technical Stop YETS 2015 EYETS 2016 YETS 2017 LS2 Time frame • Extended YETS 2016-2017 has been completed (21 wks) • YETS 2017-2018

LHC coordination meeting, 30th May 2017 54Marzia Bernardini EN-ACE

LS2 vs LS3 preparation: HL-LHC WP11