Top Banner
4

PLANNING - JMJ Group

Nov 13, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLANNING - JMJ Group
Page 2: PLANNING - JMJ Group

PLANNING

SITE ENGINEERING RESIDENTIAL DEVELOPMENT

i. Land Use/Master Planningii. Re-Zoningiii. Planned Unit Developments (PUD)iv. Development of Regional Impact (DRI) Studiesv. Design Charettesvi. Facility Master Planningvii. Estate/Plantation Master Plans 1. Home Sites 2. Water Features 3. Habitat Enhancement 4. Roads 5. Silviculture

i. Facility Planningii. Site Gradingiii. Drainage and Stormwater System Designiv. Water System Designv. Wastewater/Septic System Designvi. Sewer Design and Expansionvii. Tree Mitigationviii. Landscape Designix. Low Impact Development/LEEDx. Site Development Planning and Reviewsxi. Environmental Resource Permittingxii. Other Construction Related Permitting

i. Land Use/Master Planningii. Roadway Designiii. Drainage and Stormwater System Designiv. Utility Designv. NPDES/Erosion, Sedimentation, and Pollution Control (ES&PC) Plansvi. Flood Compensation Studiesvii. Sustainable Development Designviii. Construction Engineering Inspectionix. NPDES Sampling, Inspections, and Reporting

Page 3: PLANNING - JMJ Group

ROADWAY DESIGN AGRICULTURAL

ENVIRONMENTAL

i. Transportation Planning & Studiesii. Roadway Design/Widening/Realignmentiii. Stormwater/Drainage Designiv. Sidewalk/Pedestrian Facilities Designv. Utility Designvi. Roadway Permittingvii. Streetscape Designviii. NPDES/Erosion, Sedimentation, and Pollution Control (ES&PC) Plansix. Right-of-Way Acquisitionx. Construction Engineering Inspectionxi. NPDES Sampling, Inspections, and Reporting

i. Phase 1 Environmental Site Assessmentsii. Wetland Delineation and Permittingiii. Spill Prevention, Control and Countermeasure Plan Preparationiv. Wastewater Permittingv. Air Permittingvi. Land Application System Design

i. Phase I Environmental Site Assessments (ESA)ii. Ecology Studiesiii. Wetland Ecology Report Preparationiv. Wetland Delineation and Permittingv. Environmental Resource Permittingvi. Environmental Audits, Assessments and Compliance Plansvii. Erosion, Sedimentation and Pollution Control Plans (ESPCP)viii. NPDES Stormwater Permitting, Inspections and Monitoringix. Stormwater Pollution Prevention Plan Preparationx. Spill Prevention, Control and Countermeasure Plan Preparationxi. Construction Stormwater NPDES Inspectionsxii. Industrial Stormwater NPDES Inspectionsxiii. Turbidity Sampling/Testing

Page 4: PLANNING - JMJ Group

CONSTRUCTION

i. Contract Managementii. Civil Construction Cost Estimationiii. Biddingiv. Civil Construction Managementv. Construction Engineering Inspectionvi. NPDES Permitting, Inspections, and Monitoring

WATER

WASTEWATER

STORMWATER

i. Master Planningii. Water Transmission / Distribution Design

i. Municipal and Industrial Sewer System Design and Permittingii. Septic System Design and Permittingiii. Pump Station Designiv. Municipal/Industrial Wastewater Treatment Plant/Land Application System Designv. Hydraulic Studiesvi. Master Planningvii. Collection/Transmission Rehabilitation Design

i. Municipal/Industrial Master Planningii. Water Quality & Hydrologic Investigationsiii. Stormwater Modelingiv. Municipal/Industrial Stormwater Management System Design and Permittingv. Stormwater Pollution Prevention Plan (SWPPP/SW3P) Preparationvi. Construction Stormwater NPDES Permitting, Inspections and Monitoringvii. Industrial Stormwater NPDES Permitting, Inspections and Monitoringviii. Municipal NPDES Permittingix. Low Impact Development/LEEDx. Environmental Resource Permitting