Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew Mills 1,* , Galen Barbose 1 , Joachim Seel 1 , Changgui Dong 2 , Trieu Mai 2 , Ben Sigrin 2 , Jare? Zuboy 3 1 Lawrence Berkeley NaFonal Laboratory 2 NaFonal Renewable Energy Laboratory 3 Independent Consultant August 2016 This project was funded by the Office of Energy Efficiency and Renewable Energy (Solar Energy Technologies Program) of the U.S. Department of Energy *[email protected] 510-486-4059
33

Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Jun 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

AndrewMills1,*,GalenBarbose1,JoachimSeel1,ChangguiDong2,TrieuMai2,BenSigrin2,Jare?Zuboy3

1LawrenceBerkeleyNaFonalLaboratory2NaFonalRenewableEnergyLaboratory

3IndependentConsultant

August2016

ThisprojectwasfundedbytheOfficeofEnergyEfficiencyandRenewableEnergy(SolarEnergyTechnologiesProgram)oftheU.S.DepartmentofEnergy

*[email protected]

Page 2: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Project Overview

•  Analystsprojectthatdistributedsolarphotovoltaics(DPV)willconFnuegrowingrapidlyacrosstheUnitedStates.

•  GrowthinDPVhascriFcalimplicaFonsforuFlityplanningprocesses,potenFallyaffecFngfutureinfrastructureneeds.

•  AppropriatetechniquestoincorporateDPVintouFlityplanningareessenFaltoensuringreliableoperaFonoftheelectricsystemandrealizingthefullvalueofDPV.

Context

•  ComparaFveanalysisandevaluaFonofroughly30recentplanningstudies,idenFfyinginnovaFvepracFces,lessonslearned,andstate-of-the-arttools.

Approach

•  Electricinfrastructureplanning(IRPs,transmission,distribuFon).•  FocusonthetreatmentofDPV,withemphasisonhowDPVgrowthisaccountedforwithinplanningstudies.

Scope

2

Page 3: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

3

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 4: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

4

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 5: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

High End of 3rd Party Forecasts Suggests More DPV Than Is Considered By Utilities

5

0%

10%

20%

30%

HECO PG&E LADWP APS NVP TEP PNM ELA TVA FP&L GPC DOM ISO-NE NYISO DEI NSP PAC NWPCC PSE IPC WECC

Hawaii,California,DesertSouthwest South Northeast Midwest Northwest West

DPVpenetraKon(%ofretailsales)

Near-term(~2020)planneresKmate

Long-term(~2030)planneresKmate

Near-term(~2020)3rdpartyforecasts

2020Long-term(~2030)3rdpartyforecasts

Page 6: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Customer-adoption Modeling Brings Customer Decisions Into DPV Forecasting

6

Method DescripFon

Predic)veFactorsUsed

RecentinstallaFonrates

IncenFveprogramtargets

TechnicalpotenFal

PVeconomics

End-userbehaviors

S)pulatedForecast

Assumesend-pointDPVdeployment

HistoricalTrend

Extrapolatesfuturedeploymentfromhistoricaldata

X

Program-BasedApproach

Assumesprogramdeploymenttargetsreached

X

Customer-Adop)onModeling

UsesadopFonmodelsthatrepresentend-userdecisionmaking

X X X X

Page 7: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Shading

TiltAzimuth

Some Planners Use Customer-adoption Models for DPV Forecasting

TechnicalPotenFal

Willingness-to-adopt

Diffusion7

0Payback Period(Years)

2010Ult

imate

Share

(%

)

100%

50%

0%

0Years Since Introduction

3015

Realiz

ed M

ark

et

Pen.

100%

50%

0%

Adaptedfrom:Gagnonetal.2016

*illustra:ve

*illustra:ve

Page 8: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

8

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 9: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Multiple Per-scenario Plans Help Identify Resources that Depend on DPV Forecast

9

Method DescripFon

FactorsAddressed

Netloadchanges

GeneraFonporgoliochanges

Resource-acquisiFonstrategychanges

SingleForecast OneDPV-adopFonforecastused

SubjecttoSensi)vity

CostandperformanceofporgoliosevaluatedunderdifferentsensiFviFes

X

Per-ScenarioPlan

Capacityexpansionmodelsusedtodevelopleast-costplansforvariousscenarios

X X

Acquisi)onPathAnalysis

MulFpleper-scenarioplanscombinedwithtriggereventstoshaperesource-acquisiFonstrategy

X X X

Page 10: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Robustness of Decisions to Uncertainty in DPV Quantity

10

10,000

8,000

6,000

4,000

2,000

0

MW

2015

2020

2025 ...

...

Existing Resources

A

C

B

D

E

10,000

8,000

6,000

4,000

2,000

0

MW

2015

2020

2025 ...

...

Existing Resources

A

C

B

D

E

F

Candidateportfolio

10,000

8,000

6,000

4,000

2,000

0

MW

20

15

20

20

20

25 ...

...

Existing Resources

Load Net Load w/ low DPV

Net Load w/ high DPV

PlanwithLowDPV

PlanwithHighDPV

ForecastsofDPVAdopFonareUncertainàDevelopScenario-SpecificPlans

*illustra:ve

Page 11: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Use Difference In Plans to Identify Trigger Events and Resulting Changes to Plan

11

Source:PacifiCorp(2015)

TriggerEvent PlanningScenario ResourceAcquisi)onStrategy

NearTerm(2015-24) Long-Term(2025-34)

HighersustainedDGpenetraFonlevels

MoreaggressivetechnologycostreducFons,improvedtechnologyperformance,andhigherelectricityretailrates

•  ReduceforwardcontractacquisiFon

•  ConFnuetopursueEE

•  Reduceacquisi:onofgas-firedresources

•  BalanceFmingofthermalacquisiFonwithforwardcontractsandEE

LowersustainedDGpenetraFonlevels

LessaggressivetechnologycostreducFons,reducedtechnologyperformance,andlowerelectricityretailrates

•  IncreaseforwardcontractacquisiFon(primarilybeginning2024)

•  ConFnuetopursueEE

•  Increaseacquisi:onofgas-firedresources

•  BalanceFmingofthermalacquisiFonwithforwardcontractsandEE

Page 12: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

12

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 13: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Characterize DPV as a Resource Option

13

OnlyabouthalfoftheuFlityIRPsincludedDPVasaresource.TheprimarychallengeisdetermininghowtorepresentthecostsandbenefitsofDPVanddisFnguishitfromotherresourceslikeuFlity-scalePV(UPV).

*illustra:ve

Plan Characteris)cCapitalCostDiffersfromUPV?

CapacityFactorDiffersfromUPV?

CapacityCreditDiffersfromUPV?

AvoidedLosses

AvoidedTransmission

AvoidedDistribuFon

DEI(2015) X

GPC(2016) X X

HECO(2013) X X

IPC(2015) X

LADWP(2014)

X X

NSP(2015) X X X X

PG&E(2014) X X X X X X

PSE(2015) X X

TVA(2015) X

Page 14: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

14

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 15: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Evolving Approaches to Capture Non-dispatchability of DPV in Planning

•  Hourly DPV generation profiles capture some potential integration issues, including multi-hour ramping impacts and overgeneration.

•  Sub-hourly variability and uncertainty can be addressed through detailed integration studies.

•  DPV’s resource adequacy contribution is estimated by the capacity credit. 15

0

2

4

6

8

10

12

DEC IPC TEP APS NWPCC

SolarP

VIntegra;

onCost

($/M

Wh)

Page 16: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

16

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 17: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Propensity to Adopt Accounts for Factors Like Customer Demographics

17

Method DescripFon

Predic)veFactorsUsed

LocaFonofexisFngloadorpopulaFon

LocaFonofexisFngDPV

DetailedcustomercharacterisFcs

Propor)onaltoLoad

AssumesDPVisdistributedinproporFontoloadorpopulaFon

X

Propor)onaltoExis)ngDPV

AssumesDPVgrowsinproporFontoexisFngDPV X

PropensitytoAdopt

PredictscustomeradopFonbasedonfactorslikecustomerdemographicsorcustomerload

X X X

Page 18: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Predicting the Location of DPV Adoption Using Propensity to Adopt

18

C - 39

FIGURE 3-8 PG&E SERVICE AREA – SCENARIO 1 - ESTIMATED PV INSTALLED IN 2020 AND 2025

Source:PG&E2015DRP

Page 19: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

19

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 20: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Impact of DPV on T&D Investments: Potential Deferral Value

20 Source:AdaptedfromCohenetal.2016

Page 21: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

1.02

1.03

1.04

1.05

1.06

1.07

1.08

0 500 1000 1500 2000

Maxim

umFeede

r

Volta

ge(p

u)

FeederPVPenetra@on(kW)

Allpenetra@onsacceptable,regardlessofloca@on

Somepenetra@onsacceptable,dependingontheloca@on

Nopenetra@onsacceptable,regardlessoftheloca@on

ImpactThreshold

MinimumHos@ngCapacity

MaximumHos@ngCapacity

Impact of DPV on T&D Investments: Hosting Capacity Analysis

21 Source:AdaptedfromEPRI2015

Page 22: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Impact of DPV on T&D Investments: Proactive Planning for DPV

22

$-

$0.1

$0.2

$0.3

$0.4

$0.5

$0.6

0 20 40 60 80 100

Upgrade

Cost($/W

pv)

PVPenetra@on(%ofFeederThermalRa@ng)

Cluster11AllOtherClusters

$-

$0.1

$0.2

$0.3

$0.4

0 20 40 60 80 100

Upgrade

Cost($/W

pv)

PVPenetra?on(%ofFeederThermalRa?ng)

Tradi?onalAdv.InverterAdv.Inverter+Storage

CoststoIncreasetheHosFngCapacityof

FourteenRepresentaFveFeederswith

TradiFonalGridUpgrades

CoststoIncreasetheHosFngCapacityofCluster11Comparing

TradiFonalGridUpgradesto

EmergingOpFons

Source:AdaptedfromNavigant2016a

Page 23: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

23

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 24: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Non-linear Relationship of Losses with Load Is Not Fully Captured in Average Loss Rate

24

Method DescripFon

LossCharacteris)csAddressed

VariedlossesoverFme

Marginallossratediffersfromaverage

Circuit-levellosses

AverageLossRate Appliessingleaveragelossrateacrossallhoursoftheyear

Time-Differen)atedAverageLossRate

DifferenFatesaveragelossratebasedonFmingofavoidedlosses X

MarginalAverageLossRate

Appliesandaveragemarginallossratebasedonlineloading X

Time-Differen)atedMarginalLossRate

DifferenFatesmarginallossratebyhour,month,or“peak”vs.“energy” X X

DetailedAnalysisofLosses

Useacircuit-levelmodeltoanalyzelosses X X X

MostuFliFesappeartouseanaveragelossrate,someuseaFme-differenFatedaveragelossrate,noneappeartousemarginallosses.

Page 25: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

25

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 26: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Studies Contain Few Detailed Discussions of Changes in Value at High Penetration

•  Georgia Power estimates value for different tranches of solar penetration, though details are often redacted.

•  LADWP identifies challenges with overgeneration on some low-load days with high solar.

•  LADWP also notes that electric car charging during the day may mitigate some of the overgeneration challenges.

•  Planners may also want to consider bundling DPV with other enabling technologies to prevent changes in value with high penetration.

26

Source:AdaptedfromGPC2016

Page 27: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Organization of Report

27

Forecas)ngquanFtyofDPV•  SecFon3

RobustnessofdecisionstouncertaintyinDPVquanFty•  SecFon4

CharacterizeDPVasaresourceop)on•  SecFon5

Non-dispatchabilityofDPV•  SecFon6

Loca)on-specificfactorsofDPV•  SecFon7

ImpactofDPVonT&Dinvestments•  SecFon8

AvoidedlossesassociatedwithDPV•  SecFon9

ChangeswithDPVpenetra)on•  SecFon10

IntegraFonofDPVacrossplanningforums•  SecFon11

Page 28: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Integrating DPV Into Planning Requires Coordination Across Generation,

Transmission, and Distribution Planning

•  One approach is to ensure that consistent scenarios, assumptions, and data are passed between different planning entities.

•  Some utilities are developing iterative planning practices that directly link the different planning forums.

•  Emerging tools can help to more fully evaluate the impacts and benefits of DPV and other DER from the distribution system up.

28

Page 29: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Highlights for Innovative Practices •  Forecasting: Customer-adoption modeling for DPV forecasts.

•  Robustness: Develop scenario-specific plans. Use differences in plans to identify “trigger events” that will result in changes to plan.

•  DPV as a Resource: Fully characterize DPV as a resource option. Consider in resource, transmission, and distribution planning.

•  Location of DPV: Forecast location of DPV to improve estimates of the T&D impact and location-specific value of DPV. Use propensity to adopt based on household/customer characteristics.

•  Impacts to T&D: Include DPV in forecast of peak load for transmission and distribution planning. Use hosting capacity analysis to identify needs for proactive distribution investments.

•  Non-dispatchability: Use hourly DPV profiles from SAM, CPR, or PVSyst. Calculate contribution to adequacy with ELCC. Use detailed integration studies to investigate sub-hourly challenges and costs.

•  Avoided Losses: Account for time-varying loss rates.

•  Changes with penetration: Identify costs and benefits for different tranches of DPV. Consider charging EVs when solar output is high. 29

Page 30: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Contact Information

For more information: Andrew D. Mills | [email protected] | 510.486.4059 http://emp.lbl.gov/reports/re

30

Page 31: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Sample of Integrated Resource Plans En)ty TitleandYearArizonaPublicService(APS) 2014IntegratedResourcePlanDominion(DOM) 2015IntegratedResourcePlanDukeEnergyCarolinas/Progress(DEC/DEP) 2014IntegratedResourcePlanDukeEnergyIndiana(DEI) 2015IntegratedResourcePlanEntergyLouisiana(ELA) 2015IntegratedResourcePlanFloridaPower&Light(FPL) TenYearPowerPlantSitePlan:2015-2024GeorgiaPower(GPC) 2016IntegratedResourcePlanHawaiianElectricCompanies(HECO) 2013IntegratedResourcePlanningReportIdahoPower(IPC) 2015IntegratedResourcePlanLosAngelesDepartmentofWaterandPower(LADWP) 2014IntegratedResourcePlanNevadaPower(NVP) 2015IntegratedResourcePlanNorthernStatesPower(NSP) 2015ResourcePlanNorthwestPowerandConservaFonCouncil(NWPCC) SeventhConservaFonandElectricPowerPlan(2016)PacificGas&Electric(PG&E) 2014BundledProcurementPlanPacifiCorp(PAC) 2015IntegratedResourcePlanPublicServiceNewMexico(PNM) 2014IntegratedResourcePlanPugetSoundEnergy(PSE) 2015IntegratedResourcePlanTennesseeValleyAuthority(TVA) IntegratedResourcePlan-2015FinalReportTri-StateG&T 2015IntegratedResourcePlan/ElectricResourcePlanTucsonElectricPower(TEP) 2014IntegratedResourcePlan

31

Page 32: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Sample of Transmission Planning Studies

32

En)ty TitleandYearCaliforniaISO(CAISO) 2015-2016TransmissionPlanningProcessUnifiedPlan.AssumpFonsandStudyPlanISONewEngland(ISO-NE) 2015RegionalSystemPlanNewYorkISO(NYISO) 2015LoadandCapacityDataReport:“GoldBook”PJM 2015RegionalTransmissionExpansionPlanWesternElectricityCoordinaFngCouncil(WECC)

IntegratedTransmissionandResourceAssessment:Summaryof2015PlanningAnalyses

Page 33: Planning for a Distributed Disruption · 2020-01-06 · Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning Andrew

Sample of Distribution Planning Studies En)ty TitleandYearCalifornia:PG&E 2015DistribuFonResourcesPlanCA:SouthernCaliforniaEdison(SCE) 2015DistribuFonResourcesPlanCA:SanDiegoGasandElectric(SDG&E) 2015DistribuFonResourcesPlanHawaii:HECO 2014DistributedGeneraFonInterconnecFonPlanHI:HECO 2015Circuit-LevelHosFngCapacityAnalysisMassachuse?s:NaFonalGrid 2015GridModernizaFonPlanNewYork:NYDepartmentofPublicService 2015DistributedSystemImplementaFonPlanGuidance