PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port Engineer / Vice President 1
55

PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

May 04, 2018

Download

Documents

duonghuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

PLANNING, DESIGN, and

REALIZATION OF AUTOMATED

TERMINALSAshebir Jacob P.E.

Senior Port Engineer / Vice President

1

Page 2: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Moffatt & Nichol

• Founded in 1945 in Southern California to serve the U.S. Navy & the evolving port & maritime industries

• 600+ employees w/29 offices (North America, Europe, Latin America, Middle East, Pacific Rim)

• A recognized leader in marine terminal planning, analysis, design & goods movement economics

Page 3: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Services for Development of Automated

Terminal Matrix

3

ServicesMoffatt & Nichol

TypicalSimulation Consultant

Typical Infrastructure

Consultant

Typical Equipment

VendorMaster Planning

Investment Advisory

Basis of Design

Simulation

Interface Plan

Equipment Specifications

IT, Application Specifications

Design (infrastructure)

Procurement Process:Equipment

IT, Application

Program Management (infrastructure)

Contract Management (equipment)

Emulation

Training

Go-Live Support

Optimization

Page 4: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

The Business Case

4

Environmentally sustainable (lowest energy consumption)

Efficient(delivering capacity, speed and reliability at lowest cost)

E3

Economical(meeting the business case)

Page 5: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Planning and Layout – Tailoring to Fit the BC

• So, the planner is like a tailor

• He must try to fashion the terminal to fit the business case perfectly

• One size does not fit all!

5

CAPACITY

• Annual throughput

PRODUCTIVITY

• Vessel

• Gate

• Rail

COST

• Facilities

• Equipment

• Labor

• Energy

Page 6: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Operations

Logistics

Infrastructure

Equipment

Traditional

Conventional “Bottom-Up” Planning

Page 7: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Operations

Logistics

Infrastructure

Equipment

New

New “Top-Down” Planning

Page 8: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Program Integration

Team

Coordinate:

Operations–Infrastructure

Infrastructure

Wharf Buildings

Backlands Elect/Comm

Rail Gate

Project ManagerReporting

Cost Control Schedule Control

Operations

Terminal

Ops TOS IT Equip Maint

Systems & Process Integrator

Executive / Steering

Committee

Core team

Project Organization?

Page 9: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Development Philosophy

• The infrastructure for an automated terminal is

fixed for its economic life

• An automated container terminal will be designed

to perform under high utilization

• It is critical to predict performance and operating

cost for the life of the infrastructure

• An early preparation of well-integrated, long-term

masterplan and development plan is required

Page 10: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Path to Completion is Complex

Page 11: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Wharf

Robotic Operation

Manned Main Trolley

Automated Secondary

Trolley

Automated Horizontal TransportAGV’s

Container Yard

Automated Container Stacking, Retrieval, ShufflingASC’s

Semi-Automated Delivery to

Outside Truck

Vessel Outside Truck

Quay Crane

Page 12: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

12

Wharf Design Issues

Page 13: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Wharf Design Issue

• Quay design load will depend on crane:

• Gage

• Back reach

• Out reach

• Setback from face of the quay

• Type of operation (tandem, single, double trolley etc.)

• Wind and seismic load

• Crane wharf interaction

13

Page 14: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Seismic Design Approach

• Performance-based design approach:

– Operating Level Earthquake (OLE)

– Contingency Level Earthquake (CLE)

– Code-Level Design Earthquake (DE)

• Performance goals:

– OLE performance = No damage

– CLE performance = Repairable damage

– DE performance = No collapse

Page 15: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Berthing and Mooring Loads

• Berthing Load– Design Vessel 20,000 TEU +

– Ship Approach Velocity and Angle 0.26 ft/s , 5o

– Length Overall (LOA) 1,300 feet +

– Maximum Displacement 254,000 metric tons +

– Beam 194 feet

– Maximum Draft 50.8 feet

– Allowable Hull Pressure 4.13 ksf

• Mooring Load– 200 metric ton bollards

Page 16: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Horizontal Transport Area

Robotic Operation

Manned Main Trolley

Automated Secondary

Trolley

Automated Horizontal TransportAGV’s

Container Yard

Automated Container Stacking, Retrieval, ShufflingASC’s

Semi-Automated Delivery to

Outside Truck

Vessel Outside Truck

Quay Crane

Page 17: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Horizontal Transport

• Gathering and distributing

tasks to/from storage

– Move any box, from any

location to any location at any

time

• Must be rubber-tired

– AGV/L-AGV (diesel/ battery

operated)

– AShC/AStraddle (hybrid diesel)

17

Page 18: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Typical AGV Traffic Layout

• It is important to understand the traffic pattern

• Operationally acceptable grades

• Requirements for systems such as transponders and magnets

• Appropriate position for all above ground structures

18

6 long travel lanes

Cross-traveland holding lanes

6 transfer lanes

LS QC rail

1 long travel lane

Page 19: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

WS Transfer Area

• Understand the operational requirements

• Interface with AGV system

• Interface with ASC control/ safety systems

• Load repetition

• Durability of pavement

• Different solutions for different modes of

operation

19

Page 20: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Pavement Areas

Page 21: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Berth 1 Berth 2 Berth 3

Berth 1 Favored

Area

Berth 2 Favored

Area

Berth 3 Favored

Area

Vehicle / Wheel Load Repetition

Favored Storage Location

21

Page 22: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Vehicle / Wheel Load RepetitionContainer Location Distribution

0.0%

2.0%

4.0%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

Equal Storage

0.0%

1.0%

2.0%

3.0%

4.0%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

Proportional Storage

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

60% to Favored Storage

Berth Location 8 - 20 Berth Location 21 - 31 Berth Location 32 - >37

Page 23: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Vehicle / Wheel RepetitionResults – Equal Storage Case

• Max Reps at middle of blocks

• 1M reps ~ 55% of terminal throughput

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

Loaded Vehicle Repetition at Various Locations(Equal Storage Case)

Page 24: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Vehicle / Wheel RepetitionProportional Storage Case

• Max Reps at middle of blocks

• 1M reps ~ 55% of terminal throughput

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

Loaded Vehicle Repetition at Various Locations(Proportional Storage Case)

Page 25: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Vehicle / Wheel RepetitionFavored Storage Case

• Max Reps flattened and reduced

• 0.65M reps ~ 35% of terminal throughput

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Block Index

Loaded Vehicle Repetition at Various Locations(80% Favored Storage Case)

Page 26: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Vehicle / Wheel Repetition

Summary of Result

Allocation Assumptions

Equal Storage

Proportional Storage

Favored Storage

Worst Case40% 50% 60% 70% 80%

Max Vehicle Repetition (Loaded) 998,746 1,005,520 973,410 891,698 809,986 728,275 646,563 1,005,520

Block Location When Max Repetition Takes Place 23 19 19 19 19 19 19 19Percentage of Throughput 54% 55% 53% 49% 44% 40% 35% 55%

Page 27: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Other Pavement Performance Factors

• Performance after Earthquake

– PCC

• Significant damage expected during DE

• Catastrophic failure

• Will take months to repair

• Significant impact to operation to replace pavement

– AC or Paver Block on CTB

• Some damage during OLE

• Can be repaired rapidly

– Overlay AC on top

– Adjust paver blocks

Page 28: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Other Pavement Performance Factors

• Transponder Installation for AGV

– App. 20 mm in diameter, 50 mm long (2 inches) glass body sealed

with foam cushioning

– Insert in holes 25 mm in diameter, 80 mm (3 inches) deep, sealed

with glue

– Leaving 0.5 inch gap between transponder and RCC pave for 3-

inch AC

• 3-inch AC if rutted, damage on Transponder?

3” AC

CTB or RCC

0.5”

2”

0.5”

Page 29: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Other Pavement Performance Factors

• Rescue of Automated Equipment

– Typical rescue method

for AGV

• Reach stackers

• Permanent damage to pavement

– Alternative rescue method

• By terminal trucks with “gooseneck”

• Lighter wheel load

29

Page 30: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Comparative Cost

• Life Cycle Cost Summary

78% 70% 76% 76% 100% 100% 97% 97%

$0.00

$20.00

$40.00

$60.00

$80.00

$100.00

$120.00

$140.00

SHC AGV SHC AGV SHC AGV SHC AGV SHC & AGV

Asphalt on CTB Asphalt on RCC Reinforced PCC Paver Block Reinforced PCC

Waterside Traffic Area Waterside Transfer

AreaLowest

Page 31: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Automated Stacking Area

Robotic Operation

Manned Main Trolley

Automated Secondary

Trolley

Automated Horizontal TransportAGV’s

Container Yard

Automated Container Stacking, Retrieval, ShufflingASC’s

Semi-Automated Delivery to

Outside Truck

Vessel Outside Truck

Quay Crane

Page 32: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Container yard

• End-loaded stacking/retrieval

cranes

• Side-loaded stacking/retrieval

with landside transfer cranes

32

Page 33: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Why Low Tolerance?

Page 34: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Why Low Tolerance?

Page 35: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

1.5‘

~ 4“

Why Low Tolerance?

Page 36: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Well Consolidated Landfill

• Critical to minimize total and differential

settlements due to:

–Dynamic loads created by crane operation

– Stacked container storage

– Impact loads from container stacks

36

Page 37: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Drainage

• Stacking area flat and drainable

• Drainage and storm water treatment

– Design slope that meets operational requirements

– Comply with local regulation in treating storm water

37

Page 38: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Other Utilities

• Fresh water supply

• Sanitary sewer

• Light poles (do we need

any?)

• Antenna poles

• Camera poles

• Fencing

• X-ray inspection

(VACIS)

• Fire protection

• Security systems

38

Page 39: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Power System

• Redundancy

• 100% fault tolerance

• Reliable

• Location and size of

substations, transformer

• Each crane in same stack

energized from two

independent sources

39

Page 40: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Design Issues ASC Blocks

• RMG rails and beams

• Reefers

• Hazardous

• Grading and drainage

40

Page 41: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Reefer Racks

• Clear understanding of

operational requirements

• Consider all safety

requirements

• Understand the access

control and interfaces with

crane system

• Comply with building

requirements

41

Page 42: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

ASC Runway

Page 43: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Planning, Design & Implementation of Automated Terminals

Pre-fabricated Runway Beams

Page 44: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

ASC Runway

Page 45: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Land Side Transfer Area

Robotic Operation

Manned Main Trolley

Automated Secondary

Trolley

Automated Horizontal TransportAGV’s

Container Yard

Automated Container Stacking, Retrieval, ShufflingASC’s

Semi-Automated Delivery to

Outside Truck

Vessel Outside Truck

Quay Crane

Page 46: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Landside Transfer Area

• Understand the

operational requirements

• Interface with gate

systems

• Interface with ASC

control/ safety systems

• Load repetition

• Durability of pavement

46

Page 47: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Landside Transfer Area

• Truck maneuvering to

the transfer area

• Use island to locate

electrical substations

and communication

hub building

47

Page 48: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Intermodal Rail Area

Robotic Operation

Manned Main Trolley

Automated Secondary

Trolley

Automated Horizontal TransportAGV’s

Container Yard

Automated Container Stacking, Retrieval, ShufflingASC’s

Semi-Automated Delivery to

Outside Truck

Vessel Outside Truck

Quay Crane

Page 49: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

IY Area

• On dock rail

• Designed for efficient rail loading operations

– Semi-automated remotely operated rail loading cranes

– Safety fence and gate locations and access control

– The right crane rail

49

Page 50: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Planning, Design & Implementation of Automated Terminals

50

Rail operation

Rail Operation

Page 51: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Buildings

• Gates

– Highly automated

– RFID for truck identification

– OCR

– TWIC reader for security

– Truck holding areas

• Administration/Operation/

IT

– House IT systems

– Remote operator’s room(s)

– Other operation

• Maintenance

— Provide sufficient storage for

spare parts

— Almost all electrical equipment

— Almost all maintenance is

performed at the equipment

site, not in the workshop

— Connected to IT systems

— Location depends on

— Mode of waterside transport

— Mode of fueling (battery/diesel)

• Battery Exchange Building

51

Page 52: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Planning, Design & Implementation of Automated Terminals

52

Robotic battery changing station

Robotic Battery Changing Station

Page 53: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Example of Operations Control Room

• Orientation

• Windows

• Light

• Noise

• Table space

53

Page 54: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Integration Management

• An automated terminal is a highly integrated system

of components that must fit together perfectly

• The only standard is the container

54

THIS IS WHERE PROJECTS TYPICALLY

SUCCEED OR FAIL

Page 55: PLANNING, DESIGN, and REALIZATION OF …aapa.files.cms-plus.com/SeminarPresentations/2015...PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port

Thank You

55