Top Banner
PLANNING AND MANAGEMENT OF HAZARDOUS WASTES
20

Planning and management of hazardous wastes

Jul 08, 2015

Download

Documents

Rohit Chandnani
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Planning and management of hazardous wastes

PLANNING AND MANAGEMENT OF HAZARDOUS WASTES

Page 2: Planning and management of hazardous wastes

INTRODUCTION• Definition-waste that poses substantial or potential threats to public

health or the environment is known as hazardous wastes.

• Classification of hazardous wastes:

1. Characteristic hazardous wastes:

Ignitable (flammable)

Reactive

Corrosive

Toxic.

2. Listed hazardous wastes:

non-specific sources

specific sources.

discarded chemical products.

Page 3: Planning and management of hazardous wastes
Page 4: Planning and management of hazardous wastes

• Causes of generation of hazardous wastes:

– Production ranges from large industries to individuals.

– Lack of realization of the hazard of the wastes

– Chemicals used for industrial processes and the significant rise in useof these chemicals in the recent past due to heavy industrialization.

– Unwillingness of the industries to properly manage the hazardouswastes due to the heavy expenses involved.

• General solutions for hazardous waste management:

– Increase in strict regulations on the disposal of hazardous waste.

– Industries can break down dangerous chemical compounds into less dangerous forms by physical, chemical, or biological treatment

– Participation at individual level.

– Provisions of concessions by the government to the industries for treatment and disposal of hazardous wastes.

Page 5: Planning and management of hazardous wastes

• Effects of hazardous wastes:– Soluble nitrates from manure

may dissolve into groundwaterand contaminate drinking-waterwells.

– Insulation material on furnacepipes contain asbestos particles,which can break off and hangsuspended in air; when inhaled,they can cause lung disease andcancer.

– Toxic substances that do notbreak down or bind tightly tothe soil may be taken up bygrowing plants

– If rivers and lakes are pollutedand become toxic enough, theymay kill animal and plant lifeimmediately

– Evaporation of toxic solventsfrom paints and cleaning agentsis a common problem causingserious air pollution issues fornearby residents.

Effects on animals

Paints and other hazardous chemicals

Page 6: Planning and management of hazardous wastes
Page 7: Planning and management of hazardous wastes

AIM AND OBJECTIVES

• AIM:

– To study the planning, design of current systems of management of hazardous wastes viz.

– Generation of hazardous waste at source.

– reduction of hazardous waste at source.

– Transport of hazardous wastes.

– Treatment and recovery of hazardous wastes.

– Final Disposal of the hazardous wastes.

• OBJECTIVE:

– To give recommendations for the improvement and modification of these systems.

Page 8: Planning and management of hazardous wastes

METHODOLOGY

• The treatment and disposal of hazardous wastes cannot be done inthe regular ways used for non-hazardous wastes. Some specialmethods are devised for the hazardous waste management

• Methods for treatment and disposal of the hazardous wastes:

– Recycling of hazardous wastes

– Stabilization by Portland cement

– Incineration, destruction and waste-to-energy

– Hazardous waste landfill (sequestering, isolation, etc.)

– Pyrolysis

Page 9: Planning and management of hazardous wastes
Page 10: Planning and management of hazardous wastes
Page 11: Planning and management of hazardous wastes

LITERATURE SURVEY• Hazardous waste scenario in the past in India:

– Indian cities alone generate more than 100 million tons of solid waste a year,

– India's garbage crisis is from rising consumption. India's waste problem also points to a stunning failure of governance

– In 2000, India's Supreme Court directed all Indian cities to implement a comprehensive waste-management program that would include household collection of segregated waste, recycling and composting.

– In 2011, several Indian cities embarked on waste-to-energy projects of the type in use in Germany, Switzerland and Japan.

– Lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes In India

– Government of India notified the Hazardous Waste Management & Handling Rules (HWM Rules) on July 28, 1989 under the provisions of the Environment Protection Act, 1986 and was further amended in the year 2000 & 2003.

– The top four waste generating states are Maharashtra, Gujarat, Andhra Pradesh and Tamil Nadu.

– States such as Himachal Pradesh, Jammu & Kashmir, all the North Eastern States excepting Assam generate less than 20,000 MT per annum.

Page 12: Planning and management of hazardous wastes

CASE STUDY NO.1-COMMON EFFLUENT TREATMENT PLANT,

KOPARKHAIRNE, NAVI MUMBAI

• Liquid hazardous wastes containing toxic impurities are called effluents

• Liquid hazardous waste from various participating industries is treated

• Treated water is discharged in the Waghivali Creek by pumping throughHDPE closed pipeline

• CETP helps the industries in easier control of pollution, as it is a semi-government body

• Treatment of The liquid wastes from various industries individually up tothe desired concentration, become techno-economically difficult:– Land scarcity

– Requirement of separate staff

– Very expensive

• Dilution factors due to the mixing of different liquid wastes comes intoplay.

Page 13: Planning and management of hazardous wastes

Improper effluent disposal

Page 14: Planning and management of hazardous wastes

CASE STUDY NO.2-BIO MEDICAL WASTE TREATMENT PLANT,

CHATRAPATI SHIVAJIHOSPITAL, KALWA• Takes care of the bio-medical waste disposal problem in the entire city of

Thane.

• Approved by Maharashtra Pollution control board

• Set up by the Thane based NGO 'Enviro-vigil' that has been assigned thetask of starting and maintaining the disposal facility.

• Thane Municipal Corporation provided land and electricity free of cost.

• Daily, 525-625kg of BMW is generated from private hospitals and nursinghomes and 200 kg from municipal hospitals.

• Prior to this plant, most of the city's bio-medical wastes got mixed withthe rest of the garbage and eventually found its way to the dumpingground.

• Segregation, Incineration and autoclaving are the main processes used.

• Two special vans are used for transporting the bio-medical waste.

• Charges are Rs.7.25 per bed for private hospitals and half for municipalhospitals in exchange of free electricity and land.

Page 15: Planning and management of hazardous wastes
Page 16: Planning and management of hazardous wastes

CASE STUDY NO.3-LANDFILL SITE, TRANS THANE CREEK WASTE

MANAGEMENT ASSOCIATION, THANE

• A facility for disposing off toxic wastes set up in the Trans Thane Creek (TTC) industrial area on about 70,000 sq. meter land at Mahape

• The project approved by the Union Ministry of Environment and Forest with 25% funding from their side and has been taken up by the Thane Belapur Industrial Association.

• Scientifically collects and disposes off solid and hazardous wastes generated by industrial units functioning in the TTC area, in a centralisedmanner.

• Prior to this project,About 250 industries in the TTC area generated 31,427 tonnes per annum of hazardous waste and there was no proper facility for its disposal

• The waste produced by these units include, heavy metal concentration, organic content, halogens etc

Page 17: Planning and management of hazardous wastes

• The generation of hazardous waste cannot be reduced to zero with the help of available hazardous waste management technologies and treatment,hence landfills are required.

• The principles of sound landfill management are based on four main criteria.

– Environmental nuisances such as odours,fires,vermin insects, birds, windblown litter and visual instrusion should be eliminated or at least kept to minimum.

– The available void space in the site should be utilised to the full by ensuring good compaction of the waste.

– Problems of water pollution and gas generation should be minimised.

– The management of the site should reflect the after use for which the reclaimed land is intended.

Page 18: Planning and management of hazardous wastes

Typical cross-section of a landfilling site

Page 19: Planning and management of hazardous wastes

LIKELY OUTCOME AND CONCLUSIONS

• Reduction in generation by using modification at source.

• Better methods of transport.

• Increased efficiency of management and disposal.

• Recycling of raw materials at the initial stage so that ultimatelylesser hazardous waste is generated

• Transportation system more environmentally safe.

• Reduction in the cost of the overall transport of hazardous waste.

• The management systems of hazardous waste are more and moreeconomical

Page 20: Planning and management of hazardous wastes

THANK YOU