Top Banner
Planning Development Sices PLANNING SERVICES NEIGHBORHOOD & COMMUNITY SERVICES 911 NORTH 7 TH AVENUE I P.041E POCATELLO, 83205-4169 208.234.6184 WEB https://.potello.us HISTORIC PRESERVATION COMMISSION (HPC) AGENDA Wednesday, July 7, 2021, 6:00 p.m. 911 N. Seventh Avenue, City Council Chambers Limited in-person attendance is allowed, but due to COVID-19 guidelines, strict social distancing measures are in place. INDIVIDUALS ARE ENCOURAGED, BUT NOT REQUIRED, TO WEAR MASKS/FACE COVERINGS. City Hall is accessible to persons with disabilities. Program access accommodations may be provided with three (3) days' advance notice by contacting Skyler Beebe at sbeebe@pocatello.us; 208.234.6248 or 5815 South 5th Avenue, Pocatello, ID. The Historic Preservation Commission is a citizen advisory group to the City Council. They are authorized to conduct a survey of local historic properties, recommend methods and procedures to preserve, restore, maintain, and operate historic propeies under the ownership or control of the City; recommend the lease, sale other transfer or disposition of historic properties; paicipate in the conduct of land use, urban renewal and other planning processes undertaken by governmental agencies; recommend ordinances and provide information for the purposes of historic preservation; promote and conduct an educational program on historic preservation; and review and act upon applications for permits for building alteration, new construction, or demolition within designated historic districts. The Commission also plays a vital role in the City's downtown revitalization efforts. All meetings of the HPC are recorded for record retention and transcription. The following is the official agenda of the Historic Preseation Commission. Discussion and Commission action will be limited to those items on the agenda. AGENDA ITEM 1: ROLL CALL AND DISCLOSURE OF CONFLICT OF INTEREST AND EX-PARTE CONTACT. Disclose who was talked to, the basic substance of the conversation, and whether the conversation had any influence. Disclose if there is anything personally or professionally that would not allow an impartial or unbiased decision. Disclose if a site visit was done, location(s) of the visit, and what was seen. AGENDA ITEM 2: APPROVAL OF MINUTES The Commission may wish to approve the meeting minutes from June 16, 2021. (ACTION ITEM) AGENDA ITEM 3: CERTIFICATE OF APPROPRIATENESS BB&T Rental Properties, LLC, represented by Chris Petersen, has submitted a revised proposal for a ceificate of appropriateness for new windows at 102 S. Main Street, the Pioneer Block. (ACTION ITEM) AGENDA ITEM 4: HISTORIC PRESERVATION GRANTS The Commission may consider applying for the following grants. (ACTION ITEM) Ifft Foundation (August 15), Idaho Heritage Trust (September 30), Idaho Humanities Council (August 15) AGENDA ITEM 5: THE BRADY CHAPEL CENTENNIAL CAMPAIGN PLAN The Commission may wish to discuss and coordinate plans for funding & events. (ACTION ITEM) Discussion on grants, funding and 501(c)(3) information Event Planning: o Art Walk: August 6, 2021 Myers-Anderson Lobby: HPC Open House Whitman Lobby: Brady Chapel Campaign o Summer Gala: August 26, 2021, 5-?pm Assign who will contact participants o Scavenger Hunt: October 9, 2021 Assign who will coordinate this event Time for the event & consider food vendors, etc. catello Historic Preservation Commission AN EQUAL OPPORTUNITY EMPLOYER I VETERAN'S PREFERENCE
36

Planning ai Development Services

Mar 22, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Planning ai Development Services

Planning ai Development Services PLANNING SERVICES NEIGHBORHOOD & COMMUNITY SERVICES

911 NORTH 7TH AVENUE I P.0Bax4169 POCATELLO, lW-Kl 83205-4169 208.234.6184 WEB https://www.pocatello.us

HISTORIC PRESERVATION COMMISSION (HPC) AGENDA

Wednesday, July 7, 2021, 6:00 p.m. 911 N. Seventh Avenue, City Council Chambers

Limited in-person attendance is allowed, but due to COVID-19 guidelines, strict social distancing measures are in place. INDIVIDUALS ARE ENCOURAGED, BUT NOT REQUIRED, TO WEAR MASKS/FACE COVERINGS.

City Hall is accessible to persons with disabilities. Program access accommodations may be provided with three (3) days' advance notice by contacting Skyler Beebe at [email protected]; 208.234.6248 or 5815 South 5th Avenue, Pocatello, ID.

The Historic Preservation Commission is a citizen advisory group to the City Council. They are authorized to conduct a survey of local historic properties, recommend methods and procedures to preserve, restore, maintain, and operate historic properties under the ownership or control of the City; recommend the lease, sale other transfer or disposition of historic properties; participate in the conduct of land use, urban renewal and other planning processes undertaken by governmental agencies; recommend ordinances and provide information for the purposes of historic preservation; promote and conduct an educational program on historic preservation; and review and act upon applications for permits for building alteration, new construction, or demolition within designated historic districts. The Commission also plays a vital role in the City's downtown revitalization efforts. All meetings of the HPC are recorded for record retention and transcription. The following is the official agenda of the Historic Preservation Commission. Discussion and Commission action will be limited to those items on the agenda.

AGENDA ITEM 1: ROLL CALL AND DISCLOSURE OF CONFLICT OF INTEREST AND EX-PARTE CONTACT. Disclose who was talked to, the basic substance of the conversation, and whether the conversation had any influence. Disclose if there is anything personally or professionally that would not allow an impartial or unbiased decision. Disclose if a site visit was done, location(s) of the visit, and what was seen.

AGENDA ITEM 2: APPROVAL OF MINUTES The Commission may wish to approve the meeting minutes from June 16, 2021. (ACTION ITEM)

AGENDA ITEM 3: CERTIFICATE OF APPROPRIATENESS BB&T Rental Properties, LLC, represented by Chris Petersen, has submitted a revised proposal for a certificate of appropriateness for new windows at 102 S. Main Street, the Pioneer Block. (ACTION ITEM)

AGENDA ITEM 4: HISTORIC PRESERVATION GRANTS The Commission may consider applying for the following grants. (ACTION ITEM)

• Ifft Foundation (August 15), Idaho Heritage Trust (September 30), Idaho Humanities Council (August 15)

AGENDA ITEM 5: THE BRADY CHAPEL CENTENNIAL CAMPAIGN PLAN The Commission may wish to discuss and coordinate plans for funding & events. (ACTION ITEM)

• Discussion on grants, funding and 501 (c)(3) information• Event Planning:

o Art Walk: August 6, 2021• Myers-Anderson Lobby: HPC Open House• Whitman Lobby: Brady Chapel Campaign

o Summer Gala: August 26, 2021, 5-?pm• Assign who will contact participants

o Scavenger Hunt: October 9, 2021• Assign who will coordinate this event• Time for the event & consider food vendors, etc.

Pocatello

Historic

Preservation

Commission

AN EQUAL OPPORTUNITY EMPLOYER I VETERAN'S PREFERENCE

Page 2: Planning ai Development Services

The meeting began at 6:00 PM

HISTORIC PRESERVATION COMMISSION Minutes for June 16, 2021 at 6:00 p.m.

City Council Chambers, Municipal Building 911 N. 7th Avenue, Pocatello, ID

AGENDA 2

AGENDA ITEM #1: ROLL CALL AND DISCLOSURE OF CONFLICT OF INTEREST AND EX-

PARTE CONTACT Disclose who was talked to, the basic substance of the conversation, and whether the conversation had any influence. Disclose if there is anything personally or professionally that would not allow an impartial or unbiased decision. Disclose if a site visit was done, location( s) of the visit, and what was seen.

PRESENT: Jacquee Alvord, Ruta Casabianca, Donald Elston, Elizabeth Fore, Latecia Herzog (arrived at 6: 13 PM), Nick Nielson, and Marty Vizcarra.

STAFF: Jim Anglesey, Councilwoman Leeuwrik, and Aceline McCulla.

AGENDA ITEM #2: APPROVAL OF MINUTES

The Commission may wish to approve the meeting minutes from the Memorial Day Open House on May 31, 2021, and the regular meeting on June 2, 2021.

It was moved by N. Nielson and seconded by J. Alvord to approve the both meeting minutes, as written, from May 31 and June 2 of 2021. Those in favor: Alvord, Casabianca, Elston, Fore, Nielson, and Vizcarra. Unanimous. Motion carried.

AGENDA ITEM#3: CERTIFICATE OF APPROPRIATENESS

Jennifer Putnam of Putnam Enterprises, LLC has submitted an application for a certificate of appropriateness to remove neon signage, re-stucco the front fa<;ade and repaint the building with different colors at 237 E. Center Street, the Auditorium Opera House.

Jennifer Putnam of Putnam Enterprises, LLC of Pocatello wants to sell the building, and as the building is in disrepair, it needs fm;ade repairs completed to sell the building. The sign must come down and Putnam would donate the sign to Relight the Night, and Putnam would pay the fee to Blaze Sign to take the signage down. Randy Dixon of Relight the Night, Pocatello stated that he made arrangement for the sign to be taken down and stored until it can be rehabbed. Putnam will use the same awnings. The colors selected are Panda White, Grey Kitten and Silver Blue.

Jim Anglesey, Long Range Senior Planner with the City of Pocatello stated that staff finds that the application for a certificate of appropriateness is compliant with Pocatello Municipal Code Section 17. 04 .210. Should the Historic Preservation Commission approve the request, staff recommends the following condition: 1) The proposed work shall adhere to the standards from the Secretary of the Interior's Standards for theTreatment of Historic Properties.

It was moved by D. Elston and seconded by R. Casabianca to approve the request from Jennifer Putnam of Putnam Enterprises, LLC to remove the neon signage and donate it to Relight the Night, restucco the front fa<;ade and repaint the building as presented, finding the application meets the criteria for review under Chapter 17.04.210.I of Pocatello City Code as well as the Design Guidelines for Pocatello's Downtown Historic District as well as the National Standards, and authorize Chair Vizcarra to sign the Certificate of Appropriateness. Those in favor: Alvord, Casabianca, Elston, Fore, Herzog, Nielson, and Vizcarra. Unanimous. Motion carried.

AGENDA ITEM 4: DOWNTOWN HISTORIC DISTRICT SUMMER WALK

Page 1 of 2

Page 3: Planning ai Development Services

The Commission may wish to set a date for a walk through the Downtown Historic District.

Herzog noted that in the past, the Commission selected a district between the Westside, Eastside, and Warehouse District. The Commission split into two groups to cover more territory and each group documents what they see along the walk, such as: work performed that may not have been approved, work that need to be done on a building, things that are not correct and need fixing, look for wires dangling, windows broken or illegal signage ... The Commission agreed on September 1, 2021 for off-site meeting summer walk. The agenda will invite the public to walk with the Commission.

AGENDA ITEM 5: DOWNTOWN OPEN HOUSE EVENT The Commission may wish to discuss planning for an open house to interact with business and property owners in the Downtown Historic District.

The last Downtown Open House event was held at the Myers Anderson Architect office. Elston mentioned the First Friday Art Walk would be a great night. The Commission agreed to hold on August 6, 2021, to begin with the Art Walk schedule at Myers Anderson with two separate spaces, one focusing on the Brady Chapel Campaign and selling items and the other to do outreach for the HPC working with Old Town businesses and tenants to learn more about how the HPC can help them.

It was moved by R. Casabianca and seconded by L. Herzog to hold the Open House Event at Myers Anderson in the two different areas of the building on August 6, 2021. Those in favor: Alvord, Casabianca, Elston, Fore, Herzog, Nielson, and Vizcarra. Unanimous. Motion carried.

AGENDA ITEM 6: THE BRADY CHAPEL CENTENNIAL CAMPAIGN PLAN The Commission may wish to discuss and coordinate plans for funding & events.

• Discussion on grants, funding and 501 c3 information.Casabianca will begin drafting the grant by the next meeting.Nielson is still collecting information at this time on a 501 c3.

Alvord asked if tabling at the Farmer's Market was still going to happen. Elston asked what about selling things mentioned at the last meeting. Alvord has jewelry she made to sell. Herzog mentioned selling the items at the First Friday Art Walk Open House also. Herzog will try to get permission from the AIA to help process the order for canvas prints.

• Event Planning:o Summer Gala: August 26, 2021, 5-7 PM

Vizcarra stated he will try to locate a pavilion tent. Fore has not heard back on Chamber music. Casabianca is paying for the wholesale flowers and will make the arrangements. Herzog will buy the wine. Nielson will buy the Charcuterie boards with cheese and food. Who is doing outreach to the Gala businesses? Add to next agenda to select people to reach out to businesses/people for the gala list.

o Scavenger Hunt: October 9, 2021No update at this time.

With no other business, it was moved by N. Nielson and seconded by J. Alvord to adjourn the meeting at 7:08 P.M. Those in favor: Alvord, Casabianca, Elston, Fore, Herzog, Nielson, and Vizcarra. Unanimous. Motion carried.

Submitted by: _______ _______ _ Approved on: ___________ _Aceline McCulla, Secretary

Page 2 of 2

Page 4: Planning ai Development Services

� Planning&: Development Services �arello PLANNING SERVICES NEIGHBORHOOD & COMMUNITY SERVICES

911 NORTH 7TH AVENUE I P.O Box4169 POCATELLO,DAHl 83205-4169 208.234.6184 WEB https://Www.pocatello us

APPLICANT /REPRESENTATIVE:

LOCATION:

CITY STAFF ASSIGNED:

MEETING DATE:

POCATELLO HISTORIC PRESERVATION COMMISSION

STAFF REPORT

CERTIFICATE OF APPROPRIATENESS

BB&T Rental Properties, LLC / Chris Petersen

102 S. Main Street- The Pioneer Block Building

Jim Anglesey, Long-Range Senior Planner

July 7, 2021

RECOMMENDATION & CONDITIONS:

AGENDA ITEM NO. __ 3 __ _

Staff finds that the application for a certificate of appropriateness is not compliant with Pocatello Municipal Code

Section 17.04.210. Should the Historic Preservation Commission approve the request, staff recommends the following

conditions: • New window frames shall be wood or wood with metal cladding and shall match the proportions of the original

windows. This shall include all replacement windows on Main Street, Center Street and Union Pacific Avenue;• New window frames shall match the detailing of the original window frames;

• New window frame paint color shall match the green awnings above the first floor windows on Main and Center

Street or an alternative color from the approved color palette for historic preservation, as approved by staff;• The arched transom windows shall include the same glass as that of the other replacement windows.

• The proposed work shall adhere to the standards from the Secretary of the Interior's Standards for the

Treatment of Historic Properties; and• Any additional exterior alterations including windows, doors, fai;:ade improvements or signage shall be reviewed

by the Historic Preservation Commission and all necessary permits shall be acquired prior to the start of any

work.

REQUEST:

BB&T Rental Properties, LLC, represented by Chris Petersen, has submitted an application for a certificate of

appropriateness to replace the upper story windows at 102 S. Main Street, the Pioneer Block Building.

BACKGROUND:

The Pioneer Block, was built in 1892. The Inventory-Nomination Form for the Downtown Pocatello Historic District listing

on the National Register of Historic Places in 1972 states, "The store fronts of the two-story brick Pioneer Building have

been remodeled and the second floor has been covered with aluminum panels. The original brick, including the

corbelled cornice and pilasters, is still intact behind the panels. The building is currently non-contributory, but if it were

properly rehabilitated it would become contributory to the district. Constructed in 1892, the Pioneer Building was one of

the first brick business buildings in Pocatello. It originally housed the First National Bank, organized in Pocatello in 1889.

The bank was initially located in a small frame building on this site and was given five years free rent there for locating

on the west side of the railroad tracks. In April of 1915 the bank was merged with the Farmers and Traders Bank, of

which Carl Valentine was president. Valentine became president of the consolidated bank, which was moved in 1916 to

a new building on the east corner of Center and Arthur streets."

DESIGN GUIDELINES FOR POCATELLO'S DOWNTOWN HISTORIC DISTRICT:

Staff finds the following standards identified in the design guidelines for the downtown historic district to be applicable

to this application:

AN EQUAL OPPORTUNITY EMPLOYER I VETERAN'S PREFERENCE

Page 5: Planning ai Development Services

1. Exterior alterations and changes should be kept to a minimum.

- Windows should be repaired whenever possible rather than replaced. New frames must match the proportions

of the original. In most cases, wood is the historically appropriate and preferred window frame material.

2. The building should conform to surrounding buildings and other street features.

3. Every effort should be made to maintain and preserve the building's original materials and colors.

4. Original and distinctive architectural details should be retained or restored.

5. Signs should be architecturally compatible with the design of the original or proposed building.

THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES:

Staff finds the following standards identified in the Secretary of the Interior's Standards for the Treatment of Historic

Properties to be applicable to this application (See Attachment B):

"Rehabilitation is defined as the act or process of making possible a compatible use for a property through repair,

alterations, and additions while preserving those portions or features which convey its historical, cultural, or architectural

values."

Standards for Rehabilitation:

1. A property will be used as it was historically or be given a new use that requires minimal change to its distinctive

materials, features, spaces and spatial relationships.

2. The historic character of a property will be retained and preserved. The removal of distinctive materials or alteration

of features, spaces and spatial relationships that characterize a property will be avoided.

3. Each property will be recognized as a physical record of its time, place and use. Changes that create a false sense of

historical development, such as adding conjectural features or elements from other historic properties, will not be

undertaken.

4. Changes to a property that have acquired historic significance in their own right will be retained and preserved.

5. Distinctive materials, features, finishes and construction techniques or examples of craftsmanship that characterize

the restoration period will be preserved.

6. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires

replacement of a distinctive feature, the new feature will match the old in design, color, texture and, where possible,

materials. Replacement of missing features will be substantiated by documentary and physical evidence.

7. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments

that cause damage to historic materials will not be used.

8. Archeological resources will be protected and preserved in place. If such resources must be distributed, mitigation

measures will be undertaken.

9. New additions, exterior alterations, or related new construction will not destroy historic materials, features, and

spatial relationships that characterize the property. The new work will be differentiated from the old and will be

compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the

property and its environment.

10. New additions and adjacent or related new construction will be undertaken in such a manner that, if removed in the

future, the essential form and integrity of the historic property and its environment would be unimpaired.

OPTIONAL MOTIONS:

1. Approval of the Application: "Move to approve the request from BB&T Rental Properties for new windows, finding

the application meets the criteria for review under Chapter 17.04.210.1 of Pocatello City Code as well as the Design

Guidelines for Pocatello's Downtown Historic District as well as the National Standards, with the condition that: [insert

any additional conditions of approval] and authorize the Chair to sign the Certificate of Appropriateness"

2. Denial of the Application: "Move to deny the request from BB&T Rental Properties for new windows, finding the

application does not meet the criteria for review under Chapter 17.04.210.1 of Pocatello City Code nor the Design

Certificate of Appropriateness - 102 S. Main Street - Pioneer Block

City of Pocatello Planning & Development Services Page 2 of 4

Page 6: Planning ai Development Services

Guidelines for Pocatello's Downtown Historic District, finding that: [cite findings for denial]."

ATTACHMENTS:

A. Application & Supporting Materials

B. Window rehabilitation standards from the Secretary of the Interior's Standards for the Treatment of Historic

Properties

REVIEW CRITERIA (17.04.210.1)

Compliant City Code and Staff Review

Yes No N/A Code Section Analysis

17.04.210.1.1 Adverse impacts to the historical integrity of the property or structure shall be minimized.

Staff Review The proposed exterior alterations include new upper-story windows on all frontages

including Main Street, Center Street, and Union Pacific Avenue. The existing wood

windows were removed without authorization or review from the Historic

Preservation Commission. The building permit for the current renovation project

was approved for interior work only with the condition that a certificate of

□ � □ appropriateness be secured for any windows or exterior alterations prior to the

beginning of any work. The windows that are currently in place do not match the

proportions of the original windows and feature a white vinyl finish. The use of vinyl

windows and the incorrect proportions significantly alter the defining characteristics

of the building and is not appropriate for a historic building. Revised plans feature

wood windows with metal cladding where the Downtown Design Guidelines

recommend wood window frames. Metal cladding would be appropriate so long as

the original framing details are matched on the new windows.

17.04.210.1.1.a Changes to the defining characteristics of the building or site shall be minimized.

Staff Review The original windows provided a defining characteristic to the building. All

replacement windows shall feature the matching characteristics and framing of the

□ � □ original windows. As proposed, the color and shape of the windows are more

appropriate than that of the current vinyl windows, however, it is the opinion of

staff that the proposed windows do not match the proportions of the original. All

proportions and frame design of the original windows shall be incorporated into the

new windows.

17.04.210.1.1.b Removal of historic materials and features of the building or site shall be avoided.

Staff Review The existing wood windows were removed without authorization or review from the

□ � □ Historic Preservation Commission. The building permit for the current renovation

project was approved for interior work only with the condition that a certificate of

appropriateness be secured for any windows or exterior alterations prior to the

beginning of any work.

17.04.210.1.1.c Historic materials shall be retained where possible. Where not feasible, compatible materials shall be encouraged.

Staff Review The existing wood windows were removed without authorization or review from the

Historic Preservation Commission. The building permit for the current renovation

project was approved for interior work only with the condition that a certificate of

□ � □ appropriateness be secured for any windows or exterior alterations prior to the

beginning of any work. The proposed replacement windows do not match the

proportions of the original windows and feature a white vinyl finish. The use of vinyl

windows and the incorrect proportions significantly alter the defining characteristics

of the building and is not appropriate for a historic building. Revised plans feature

wood windows with metal cladding where the Downtown Design Guidelines

recommend wood window frames. Metal cladding would be appropriate so long as

Certificate of Appropriateness -102 S. Main Street - Pioneer Block

City of Pocatello Planning & Development Services Page 3 of 4

Page 7: Planning ai Development Services

the original framing details are matched on the new windows.

17 .04.210.1.2 The proposed work shall be compatible with the property or structure itself, as

well as the surrounding neighborhood or district. Consideration shall be given to

exterior design, site layout, proportion, detail, scale, color, texture, and materials.

Staff Review The proposed replacement windows do not match the proportions of the original

[XI □ □ windows and feature a metal cladded window. Replacement windows need to

match the original window frame design as observed in attached images. Window

frame colors shall match the green awnings above the first floor windows on Main

and Center Street or an alternative color from the approved color palette for historic

preservation, as approved by staff.

17 .04.210.1.3 Landscaping shall be compatible with the historic character of the property itself,

□ □ [XI as well as with the surrounding neighborhood or district.

Staff Review No landscaping is included in this project.

17.04.210.1.4 The style, materials, size and location of signs shall be compatible with the historic

character and scale of the property or structure as well as the surrounding

□ □ [XI neighborhood or district.

Staff Review No signage is included in this project. Any future signage, including window signage

shall be reviewed by the Historic Preservation Commission prior to the installation of

any signage.

17 .04.210.1.5 The Historic Preservation Commission must consider the property's suitability for

preservation or restoration; educational value; cost for preservation or restoration;

cost of acquisition, restoration, maintenance, operation, or repairs; possibilities for

adaptive or alternative use of the property; appraised value and administrative and

[XI □ □ financial responsibility of any person or organization willing to underwrite all or a

portion of such costs.

Staff Review The property is listed on the National Register of Historic Places as a non-contributing

structure to the Historic District. Due to previous exterior renovations and

improvements, the building should be considered as contributing to the district.

Certificate of Appropriateness -102 S. Main Street - Pioneer Block

City of Pocatello Planning & Development Services Page 4 of 4

Page 8: Planning ai Development Services

ATTACHMENT A

Page 9: Planning ai Development Services

PLANNING & DEVELOPMENT SERVICES

PO Box 4169, 911 North Seventh Avenue Pocatello, Idaho 83205

(208)234-6184 FAX (208)234-6586A MUNICIPAL CORPORATION OF IDAHO Please email to: [email protected]

Date received by staff: ____ _ HPC Meeting: _______ _

Dates for review will not be scheduled until plan review approval has been received.

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS FOR NEW CONSTRUCTION, DEMOLITION OR BUILDING ALTERATION

WITHIN THE DOWNTOWN HISTORIC DISTRICT (A Prerequisite to obtaining a Building or Sign Permit)

NOTE TO APPLICANTS: The Historic Preservation Commission generally meets the 1st and 3rd Wednesdays of each month at 6:00 p.m. In order to appear on the agenda, complete application materials must be submitted to the Planning & Development Services Department at least ten (10) days prior to the meeting date. Complete applications will be considered by the HPC within forty-five (45) days of receipt.

Applicant:

Name: t � o-l �

Representative:

Firm & Contact: _____________ _

Mailing address: \0 l tJ 41qkl� 7 8 l.. f. y 101..JS:Jl_ e,'::) Mailing address: _____________ _

City, State, Zip: Vi a t)!2. AP8?-1 \.f:r.A�>' 'C '-IC""L > City, State, Zip: ______________ _

Phone: __ Q_o_\_·_<.:>_· -�-\ _-_--t_-a_<o

_

L ______ _ Phone: ________________ _

Email: .Ju1 J�r.!,..)u1__J 7-""!. e. (.:.l."-\A,1..., C..o� Email:

TYPE OF WORK: □ New Construction tDemolition* -�-/-

E-xt

_e_r-io

_r_

B

_

u-ild

-i-ng

_

A_lt

-er

-a-ti

_o_n

-(S

-i-gn

_)

____ _

*All demolitions require a public hearing in accordance with Section 17.04.210. All such hearings shall be set withinforty-five days after receipt of an application. See #5 below.

Brief description of work, add additional sheet if you need more space: '.'JNCI...P w,v-J.,;.vi/.l O'� tvl{f: � /Jedt,

SiM- Su,� .\kj \lv·l-� IV\t>,.i°Ylv\ Jwct:c wo,:)lQ I� �J &...J. wi�.

( W,Q� �\��Y\6 C\,� Wtre>t.\

THIS APPLICATION SHALL BE ACCOMPANIED BY THE FOLLOWING MATERIALS {pursuant to the Zoning Ordinance Section 17 .04.210):

1. A clear statement of the proposed work, including colors, materials, landscaping, canopies, and signs;2. Plans illustrating the size, height and completed appearance of the proposed work;3. A site plan showing all existing buildings and structures and the proposed work;4. Any other project information deemed necessary by the historic preservation commission.

Page 1 of 2

Page 10: Planning ai Development Services

5. Certificate Of Appropriateness; Standards For Review: In reviewing applications for certificates of appropriatenessfor new construction or alterations of buildings, sites, structures, and objects within a historic district, the criteriafor review are as follows:

A. Adverse impacts to the historical integrity of the property or structure shall be minimized.

1. Changes to the defining characteristics of the building or site shall be minimized.2. Removal of historic materials and features of the building or site shall be avoided.3. Historic materials shall be retained where possible. Where not feasible, compatible materials shall be

encouraged.B. The proposed work shall be compatible with the property or structure itself, as well as the surrounding

neighborhood or district. Consideration shall be given to exterior design, site layout, proportion, detail, scale,color, texture, and materials.

C. Landscaping shall be compatible with the historic character of the property itself, as well as with thesurrounding neighborhood or district.

D. The style, materials, size and location of signs shall be compatible with the historic character and scale of theproperty or structure as well as to the surrounding neighborhood or district.

E. The historic preservation commission must consider the property's suitability for preservation or restoration;educational value; cost for preservation or restoration; cost of acquisition, restoration, maintenance, operation,or repairs; possibilities for adaptive or alternative use of the property; appraised value and administrative andfinancial responsibility of any person or organization willing to underwrite all or a portion of such costs.

6. A title report, property deed, or other legal documentation of ownership of the site in question, whether freehold,option, or lease for anything other than sign installation.

7. In cases where the application is for demolition, the necessity for the demolition shall be justified in writing. Thisshall include at a minimum:

A. A detailed structural analysis conducted by a licensed architect or structural engineer.B. The reasons for the building's demolition and the urgency for so doing.

PLEASE NOTE: Issues relating to access to or encroachments upon public rights-of-way are not within the purview of the Historic Preservation Commission. Such matters must be reviewed and decided by separate application to the City Engineering Department.

The approval of this application does not permit the violation of any federal or state codes, any section of the Building Code, or other Pocatello Municipal Codes as adopted. Approval of this land use permit does not exempt applicant from the provisions of the federal Fair Housing Act or ADA requirements. Further, other conditions, requirements, etc. may be imposed as part of the building permit process.

This application shall not be considered complete (nor will a hearing be scheduled) until all required information has been submitted and verified.

I hereby acknowledge that I have read this application and state that the above information is correct and I agree to the above terms and conditions. I am also aware the applicant or a representative must be present at the Historic Preservation Commission meeting.

Print Building/Property Owner(s) Name: jC>J.!>'ll)A...J �":..OuJ_;

Signature of Building/Property Owner(S): ��

, �

Dated: ½ /, y { "2 -" "L)

Dated: '--\ \ \ '-l I 1. -- ,L \

IMPORTANT: Should the Commission decline to issue this certificate, applicants may appeal to the City Council by written request submitted to the Planning & Development Services Department within thirty (30)days of the date of the written decision.

Page 2 of 2 Updated 7/11/2019

Page 11: Planning ai Development Services

102 S. Main Window Alterations

Proposed Alterations

West Center Side of Building

(/) C 0

:E "Cl C 0 (.)

"-

Ctl

.E (/)

0

(I)

a.

Ctl X

w

Wood Window with metal cladding (already installed)

���a;;

WOW Building 233 N. Main

- Similar arch detail.

- Horizontal cross member at top of window

for arch

Spandrel Arched Transom to match existing window integrity. __ __,

New Wood or Stucco decorative moulding to match existing wood trim. __ ____,

Painted Black or Green to match main level storefront and awnings.

With windows needing to be raised due to the interior floor being raised. _____ _,

Proposing a larger base that can be tied into molding around windows.

Existing Attic vent area to be replaced with decorative vent to match window arch and decorative moulding. Painted to match.

Page 12: Planning ai Development Services

233 N Main St, Pocatello

Page 13: Planning ai Development Services

DOUBLE HUNG

• Equipped with a standard full screen; optional

half screen is available.

• Tilt latches are ergonomically designed and easy to

operate making tilting and cleaning effortless.

• Sash lock provides a positive detent, reassuring user

that the window is either locked or unlocked.

• Up to PGSO performance rating.

DOUBLE HUNG

� Available with IZ3 � (Excludes lnse,l option)

MARVIN'

Double. Hung windows with Window Opening Contwl Devii;es

• Equal, Cottage, and Reverse Cottage sash provide

a variety of looks and checkrail heights.

• Available in standard and special sizes up to 4 feet

6 inches wide by 7 feet high.

• Coordinating Picture and Transom windows also available.

• Double Hung Insert option features¾ inch insert

replacement frame with through jamb installation and

up to PG40 performance rating.

I JJ

DOUBLE HUNG INSERT

21

Page 14: Planning ai Development Services
Page 15: Planning ai Development Services
Page 16: Planning ai Development Services

----

= 1 r 1r -�---- ����1

,..

Page 17: Planning ai Development Services

Current Windows

Page 18: Planning ai Development Services

Current Windows

Page 19: Planning ai Development Services

ATTACHMENT B

Page 20: Planning ai Development Services

REHABILITATION

102 WINDOWS

I WINDOWS

RECOMMENDED NOT RECOMMENDED

Identifying, retaining, and preserving windows and their tune- Removing or substantially changing windows or window features

tional and decorative features that are important to the overall which are important in defining the overall historic character of the

character of the building. The window material and how the building so that, as a result, the character is diminished.

window operates (e.g., double hung, casement, awning, or

hopper) are significant, as are its components (including sash, Changing the appearance of windows that contribute to the historic

muntins, ogee lugs, glazing, pane configuration, sills, mullions, character of the building by replacing materials, finishes, or colors

casings, or brick molds) and related features, such as shutters. which noticeably change the sash, depth of the reveal, and muntin

configurations; the reflectivity and color of the glazing; or the

appearance of the frame.

Obscuring historic wood window trim with metal or other material.

Replacing windows solely because of peeling paint, broken glass,

stuck sash, or high air infiltration. These conditions, in themselves,

do not indicate that windows are beyond repair.

Protecting and maintaining the wood or metal which comprises Failing to protect and maintain window materials on a cyclical basis

the window jamb, sash, and trim through appropriate treatments, so that deterioration of the window results.

such as cleaning, paint removal, and reapplication of protective

coating systems.

Protecting windows against vandalism before work begins by Leaving windows unprotected and subject to vandalism before work

covering them and by installing alarm systems that are keyed into begins, thereby also allowing the interior to be damaged if it can be

local protection agencies. accessed through unprotected windows.

Making windows weathertight by recaulking gaps in fixed joints

and replacing or installing weatherstripping.

Protecting windows from chemical cleaners, paint, or abrasion Failing to protect historic windows from chemical cleaners, paint, or

during work on the exterior of the building. abrasion when work is being done on the exterior of the building.

Protecting and retaining historic glass when replacing putty or Failing to protect the historic glass when making window repairs.

repairing other components of the window.

Page 21: Planning ai Development Services

I I WINDOWS

RECOMMENDED NOT RECOMMENDED

Sustaining the historic operability of windows by lubricating

friction points and replacing broken components of the operat-

ing sy stem (such as hinges, latches, sash chains or cords) and

replacing deteriorated gaskets or insulating units.

Adding storm windows with a matching or a one-over-one pane

configuration that will not obscure the characteristics of the his-

toric windows. Storm windows improve energy efficiency and are

especially beneficial when installed over wood windows because

they also protect them from accelerated deterioration.

Adding interior storm windows as an alternative to exterior storm

windows when appropriate.

Failing to maintain windows and window components so that win-

dows are inoperable, or sealing operable sash permanently.

Failing to repair and reuse window hardware such as sash lifts,

latches, and locks.

(18) The historic metalstorm windows in this1920s office building were retained and repaired during therehabilitation project.

(191 Installing a mockup of a proposed replacement window can be helpful to evaluate how well the new windows will match the historic windows that are missing or too deteriorated to repair.

fa[

REHABILITATION

WINDOWS 103

Page 22: Planning ai Development Services

REHABILITATION

104 WINDOWS

120 a·d] The original steel windows in this Industrial building were successfully repaired as part of the rehabilitation project (left).

Page 23: Planning ai Development Services

I I WINDOWS

RECOMMENDED NOT RECOMMENDED

Installing sash locks, window guards, removable storm windows,

and other reversible treatments to meet safety, security, or energy

conservation requirements.

Evaluating the overall condition of the windows to determine Failing to undertake adequate measures to ensure the protection of

whether more than protection and maintenance, such as repairs window features.

to windows and window features, will be necessary.

Repairing window frames and sash by patching, splicing, consoli- Removing window features that could be stabilized, repaired, or

dating, or otherwise reinforcing them using recognized preserva- conserved using untested consolidants, improper repair techniques,

tion methods. Repair may include the limited replacement in or unskilled personnel, potentially causing further damage to the

kind or with a compatible substitute material of those extensively historic materials.

deteriorated, broken, or missing components of features when

there are surviving prototypes, such as sash, sills, hardware, or Replacing an entire window when repair of the window and limited

shutters. replacement of deteriorated or missing components are feasible.

Removing glazing putty that has failed and applying new putty;

or, if glass is broken, carefully removing all putty, replacing the

glass, and reputtying.

Installing new glass to replace broken glass which has the same

visual characteristics as the historic glass.

Replacing in kind an entire window that is too deteriorated to Removing a character-defining window that is unrepairable or is not

repair (if the overall form and detailing are still evident) using needed for the new use and blocking up the opening, or replacing it

the physical evidence as a model to reproduce the feature or with a new window that does not match.

when the replacement can be based on historic documentation.

If using the same kind of material is not feasible, then a compat- Using substitute material for the replacement that does not convey

ible substitute material may be considered. the same appearance of the surviving components of the window or

that is physically incompatible.

REHABILITATION

WINDOWS 105

Page 24: Planning ai Development Services

REHABILITATION

[21) The windows on the lower floor, which were too deteriorated to repair, were replaced with new steel windows matching the upper-floor historic windows that were

retained.

106 WINDOWS

: J WINDOWS

RECOMMENDED NOT RECOMMENDED

Modifying a historic single-glazed sash to accommodate insulated Modifying a historic single-glazed sash to accommodate insulated

glass when it will not jeopardize the soundness of the sash or glass when it will jeopardize the soundness of the sash or signifi-

significantly alter its appearance. cantly alter its appearance.

Using low-e glass with the least visible tint in new or replacement Using low-e glass with a dark tint in new or replacement windows,

windows. thereby negatively impacting the historic character of the building.

Using window grids rather than true divided lights on windows on Using window grids rather than true divided lights on windows in

the upper floors of high-rise buildings if they will not be notice- low-rise buildings or on lower floors of high-rise buildings where

able. they will be noticeable, resulting in a change to the historic charac-

ter of the building.

Ensuring that spacer bars in between double panes of glass are Using spacer bars in between double panes of glass that are not the

the same color as the window sash. same color as the window sash.

Replacing all of the components in a glazing system if they have Replacing all of the components in a glazing system with new mate-

failed because of faulty design or materials that have deteriorated rial that will noticeably change the historic appearance.

with new material that will improve the window performance

without noticeably changing the historic appearance.

Replacing incompatible, non-historic windows with new windows

that are compatible with the historic character of the building; or

reinstating windows in openings that have been filled in.

The following work is highlighted to indicate that it is specific to Rehabilitation projects and should only be considered after the preservation concerns have

been addressed.

Designing the Replacement for Missing Historic Features

Designing and installing a new window or its components, such

as frames, sash, and glazing, when the historic feature is com­

pletely missing. It may be an accurate restoration based on

documentary and physical evidence, but only when the historic

feature to be replaced coexisted with the features currently on

the building. Or, it may be a new design that is compatible with

the size, scale, material, and color of the historic building.

Creating an inaccurate appearance because the replacement for the

missing window is based upon insufficient physical or historic docu­

mentation, is not a compatible design, or because the feature to be

replaced did not coexist with the features currently on the building.

Installing replacement windows made from other materials that are

not the same as the material of the original windows if they would

have a noticeably different appearance from the remaining historic

windows.

Page 25: Planning ai Development Services

REHABILITATION

[221 Not Recommended: ( a·b) The original wood windows in this late·19"·century building, which were highly decorative, could likely have been repaired and retained. (c) Instead, they were replaced with new windows that do not match the detailing of the historic windows and, therefore, do not meet the Standards (above).

WINDOWS 107

Page 26: Planning ai Development Services

REHABILITATION

108 WINDOWS

(23] (a)This deteriorated historic wood window was repaired and retained (b) in this rehabilitation project.

Page 27: Planning ai Development Services

. I I WINDOWS

RECOMMENDED

Alterations and Additions for a New Use

Adding new window openings on rear or other secondary, less­

visible elevations, if required by a new use. The new openings

and the windows in them should be compatible with the overall

design of the building but. in most cases, not duplicate the

historic fenestration.

Replacing windows that are too deteriorated to repair using the

same sash and pane configuration, but with new windows that

operate differently, if necessary, to accommodate a new use.

Any change must have minimal visual impact. Examples could

include replacing hopper or awning windows with casement

windows, or adding a realigned and enlarged operable portion of

industrial steel windows to meet life-safety codes.

Installing impact-resistant glazing, when necessary for security,

so that it is compatible with the historic windows and does not

damage them or negatively impact their character.

Using compatible window treatments (such as frosted glass,

appropriate shades or blinds, or shutters) to retain the historic

character of the bui I ding when it is necessary to conceal mechan­

ical equipment, for example, that the new use requires be placed

in a location behind a window or windows on a primary or highly­

visible elevation.

NOT RECOMMENDED

Changing the number, location, size, or glazing pattern of windows

on primary or highly-visible elevations which will alter the historic

character of the building.

Cutting new openings on character-defining elevations or cutting

new openings that damage or destroy significant features.

Adding balconies at existing window openings or new window open­

ings on primary or other highly -visible elevations where balconies

never existed and, therefore, would be incompatible with the his­

toric character of the building.

Replacing a window that contributes to the historic character of

the building with a new window that is different in design (such as

glass divisions or muntin profiles), dimensions, materials (wood,

metal, or glass), finish or color, or location that will have a notice­

ably different appearance from the historic windows, which may

negatively impact the character of the building.

Installing impact-resistant glazing, when necessary for security, that

is incompatible with the historic windows and that damages them

or negatively impacts their character.

Removing a character-defining window to conceal mechanical

equipment or to provide privacy for a new use of the building by

blocking up the opening.

REHABILITATION

WINDOWS 109

Page 28: Planning ai Development Services

Deadline: March 15 (Spring) & August 15 (Fall)

IDAHO COMMUNITY FOUNDATION

Ifft Foundation Fund

Guidelines

Anticipated Award Notification Date: Late April (Spring) and Late September (Fall)

AGENDA# __ _

Applications Reviewed By: Fund advisors Richard W. Garvin, Mark Buckalew, and Howard Burnett

Grant Range: Grants typically range from $3,000 - $10,000.

About the Ifft Foundation Fund Sara Ifft and her late husband, Nicholas Ifft 111, established the Ifft Foundation Trust in October 1984. Nick, his father and his grandfather were engaged in the newspaper publishing business for more than a century. The Ifft family newspaper enterprises benefited from the loyalty of its readers, so it was Nick and Sara's desire to return some of those benefits to the communities of southeastern Idaho. In June 2001, the Ifft Foundation's assets became an advised fund in the Idaho Community Foundation (ICF).

Eligibility for Funding Consideration Grants are limited to 501c3 public charities, governmental agencies, or public educational institutions whose activities will benefit the following Southeastern Idaho counties: Oneida, Bear Lake, Caribou, Franklin, Power, Bingham and Bannock.

The advisors to the Fund will consider grant requests for activities and projects that: • Benefit community beautification and public recreation in Southeastern Idaho with primary emphasis onlandscaping and beautification projects.• Benefit education, history and the arts in Southeastern Idaho• Improve the quality of public life in Southeastern Idaho

Proposals Ineligible for Funding: • Projects that benefit a private individual• Projects located on private property• Requests for salaries, benefits, operating expenses, or general organizational budget items• Requests for funds to be used to purchase real property• Fee based services such as administrative, professional, architectural, or consulting fees• Printing or development of written informational materials such as brochures, booklets, leaflets, etc.• Funding requests from private schools and churches.• Public school program or equipment funding except for landscaping and public use auditorium improvements.

Application Process: To apply, log in to your ICF account and click on Available Grants.

Grant Reporting: If awarded a grant, the grant period is just under one year, with End of Grant Reports due one year from the application deadline in which you submitted (i.e., if you received an award from the March cycle, your report is due on March 15th of the following year). The report can be accessed by logging into your ICF account, and clicking on My Awards.

Questions? Please email G [email protected] or call (208)342-3535.

Page 29: Planning ai Development Services

I D A H O AGENDA#____.1.y_

GRANT GUIDELINES

ABOUT IHC

In 1973 the Idaho Humanities Council was founded as an independent, non-profit organization to promote

greater public awareness, appreciation, and understanding of the humanities in Idaho. Through history,

literature, languages, philosophy, law, cultural anthropology, comparative religions, and other humanities

disciplines, the humanities inspire reflective, contemplative, intellectual discovery and the quiet, often solitary

questioning that reveals to us what we value most in life. At the same time the humanities thrive on civic

dialogue and lifelong learning for all citizens.

Therefore, in its most distilled language, the mission of the Idaho Humanities Council is to provide Idaho

citizens with opportunities to deepen understanding of human experience by connecting people with ideas.

The overriding vision of the Idaho Humanities Council is that the humanities inspire a more literate, tolerant

and intellectually inquisitive Idaho citizenry, better able to embrace life's possibilities.

The Council plans and conducts projects on its own and in cooperation with other organizations such as

universities, colleges, libraries, civic clubs, professional associations, historical societies and museums, and

other cultural, educational, and community entities. IHC also provides grant support for humanities projects

throughout Idaho.

THESE GRANT GUIDELINES DESCRIBE THE KINDS OF PROJECTS IHC

SUPPORTS THROUGH GRANTS AND OUTLINES ITS APPLICATION

PROCEDURES. APPLICANTS ARE STRONGLY ADVISED TO SEEK MORE

DETAILED INFORMATION THROUGH STAFF CONSULTATION BEFORE

COMPLETING AND SUBMITTING THEIR PROPOSALS.

Page 30: Planning ai Development Services

GRANT TYPES AND DEADLINES

► Major Grants (over $1,000}- No upper level of funding has been fixed; however, few awards exceed

$10,000. The level of an award depends on the merits of the proposal, the amount of the grant funds

available, and the number and quality of proposals in competition.

► Opportunity Grants {$1,000 or less} -An opportunity grant application must be submitted at least 40

days before the planned program. This is to allow ample time for publicity, which includes credit to IHC

for providing grant funds for the project. Applications may be submitted on line at any time. Allow two

weeks for a decision.

► Teacher Incentive Grants ($1,000 or less}-The IHC offers Teacher Incentive Grants for curriculum

improvement in the humanities. Applications must be submitted at least 40 days before the planned

program. These grants are intended to help K-12 teachers improve the humanities courses they

already teach or to help teachers or organizations develop a new or interdisciplinary course or student

program in the humanities. Applications may be submitted online at any time. Allow two weeks for a

decision.

► Research Fellowship Grants (August/September grant deadline ONLY}

Initial Application (Required)

December 15

August 15

Final Application Submission Deadline

January 15

September 15

Applications are reviewed by the full board in February and October. Activities should be scheduled to begin

no sooner than March 1 or November 1 respectively. If the dates of your program events are planned for

early in March, we advise that you apply in September; or if the program events are planned for early

November, we advise that you apply in January.

ASSISTANCE TO APPLICANTS WITH DISABILITIES

If necessary, IHC staff will make special arrangements to provide the guidelines in other formats or to meet

with applicants with disabilities at locations other than IHC offices.

2

Page 31: Planning ai Development Services

THE HUMANITIES DISCIPLINES

Congress defined the humanities as a set of academic disciplines when it established the National Endowment

for the Humanities in 1965. These disciplines include, but are not necessarily limited to, the following fields:

► History

► Philosophy

► Language - both modern and classical

► Linguistics

► Literature

► Archaeology

► Jurisprudence

► Comparative religion

► Ethics

► History, criticism, and theory of the arts

► Those social sciences employing historical or philosophical approaches to their content. This

may include cultural anthropology, sociology, political theory, international relations, and other

subjects concerned with questions of human nature.

► The study and application of the humanities to the human environment with particular

attention to reflecting our diverse heritage, traditions, and history and to the relevance of the

humanities to the conditions of national life.

The humanities encompass both particular methods of inquiry (dialogue, historical and logical analysis) as well

as particular bodies of knowledge such as history, philosophy, and literature.

THE ARTS AND THE SCIENCES

VS. THE HUMANITIES

Since the arts and sciences and the humanities are so closely linked, it sometimes seems unclear what

constitutes a humanities project. For purposes of project support, IHC makes these distinctions. IHC does not

fund activities that chiefly involve the creation, exhibition, or performance of the arts. IHC might fund

activities that focus on art history or criticism. The simple distinction is interpretation vs. performance or

expression. Similarly, IHC does not fund science projects dealing with research or dissemination of scientific

data, but might fund projects exploring the history of science, critically assessing scientific premises or

findings, or examining the ethical considerations inherent in scientific discoveries or technological

developments.

3

Page 32: Planning ai Development Services

WHO CAN APPLY?

Any non-profit organization, institution, individual, or ad hoc group may receive a grant. Examples of eligible

applicants include, but are not limited to:

► Social service organizations and clubs

► Churches

► State and local governmental agencies

► Business and professional groups

► Schools

► Corporations

► Public radio and television stations

► Museums

► Historical societies

► Public libraries

► Arts organizations

► Colleges and Universities

Informal groups organized solely to submit a grant may also apply for funding. Applicants need not be

incorporated as a non-profit organization or have official tax-exempt status, but they must be able to

demonstrate that they are "not for profit" and that they can manage all aspects of the project adequately.

DUNS NUMBER REQUIREMENT

The federal government requires that all grantee organizations have a DUNS (Data Universal Numbering

System) number. Please contact your administrative or grants office to get your DUNS number. This

requirement does not apply to individuals.

If your organization does not have a DUNS number, the following web page explains how to obtain one:

http://www.whitehouse.gov/sites/default/files/omb/grants/duns num guide.pdf

You can also acquire a DUNS number by visiting this website: http://fedgov.dnb.com/webform

4

Page 33: Planning ai Development Services

PROJECT FORMATS

Virtually every practical format has been used in IHC-funded projects. Often several formats may contribute

to the presentation of topics in one project. You will be asked to specify on the application the event type for

your project from the following categories:

► Media - (Film, Television, Radio)

► Digital - (Web and Social Media)

► Publications - (Newspaper (not press releases), Magazines, Catalogues, Guides, Books)

► Exhibits

► Discussion Programs (Book, Film, Lecture)

► Conferences and Symposia

► Festivals (Book, Film, Theater, Fairs, Other Celebrations)

► Performances and Presentations (Including Living History)

► Projects for K-12 Teachers (Institutes, Workshops, Curricular Projects)

► Projects for Students (Authors or Scholars in Schools, Field Trips, History Day, Oral History)

► Preservation and Access Projects

► Local history Projects (Cultural Heritage, Walking Tours, Local Oral History Projects)

RESEARCH, BOOK PUBLICATION, FILM PRODUCTION, AND CURRICULUM

DEVELOPMENT

IHC rarely funds pure research, except through its Research Fellowship program, though most successful

public projects require some research in preparation for the central discussion features.

IHC funds relatively few book publications. IHC can, however, fund honoraria for scholars to write essays for

tabloids and books, provided the publications are likely to reach large public audiences and promote

understanding and appreciation of the humanities.

The Council funds relatively few film projects. Because of special considerations relating to film projects (high

costs, length of time from scripting to production to distribution, the difficulties of obtaining broadcast

commitments, etc.), the Council encourages film project applicants to show adequate financial support from

parties other than IHC. The Council also encourages applicants to provide pilots, rough-cuts, or previous work

samples to accompany media proposals.

Except for Teacher Incentive Grants, IHC rarely funds curriculum development.

5

Page 34: Planning ai Development Services

EXAMPLES OF SUCCESSFUL IHC-FUNDED PROJECTS

► The Idaho Human Rights Education Center received IHC support to develop a self-guided tour of the

Idaho Anne Frank Human Rights Memorial in Boise.

► The Hispanic Cultural Center of Idaho received an IHC grant to assist with Fiesta Idaho, an event

showcasing and examining Mexican culture and the history of Hispanics in Idaho, including lectures

held before and after the festival.

► Bonneville County Historical Society received IHC support to develop its first major exhibit on the

regional history of eastern Idaho.

► University of Idaho Philosophy Department received IHC support for a public component in its

philosophy conference on time and identity.

► The Sierra Club received an IHC grant to bring a national John Muir Chautauquan to Boise to deliver a

historical presentation portraying Muir and using his words to address issues of conservatism.

► Lewis-Clark State College received IHC funding for a video documentary exploring the life of historian

Alvin Josephy and his evolving perceptions of Native Americans through the course of his journalistic

career.

► Oakwood Elementary teacher Melinda Harris received an IHC Teacher Incentive Grant to purchase

videos to enhance her 5th grade American History curriculum.

► Sandy Rayborn, Riverglen Junior High School, received a Teacher Incentive Grant for her student's oral

history project focusing on American wartime veterans.

► Dr. David Adler received an IHC Research Fellowship grant to conduct research for his book about the

Supreme Court's role in the expansion of presidential power and the historic relationship of the

presidency and the constitution.

TYPES OF PROJECTS NOT ELIGIBLE FOR FUNDING

IHC will not provide grant support for:

► Projects that involve direct action or the planning of direct action to resolve social issues of public

policy or public concern

► Projects that influence an audience toward a single position or present a one-sided, uncritical

treatment of an issue

► Scholarships or fellowships for academic credit or the completion of a formal degree

► Performances in the arts, unless their primary role is to foster discussion of literature, history,

philosophy, or other humanities disciplines

► Museum acquisitions, unless they are directly related to the implementation of a public humanities

project and will be used extensively after completion of the project

► Building construction, acquisition, or restoration costs (including historical preservation costs)

► Equipment purchases unless approved by the Council as essential to the funded project

► Projects which raise funds for profit or for commercial purposes

► Alcoholic beverages or entertainment for projects or project-related activities

► Candidates running for political office

6

Page 35: Planning ai Development Services

THE APPLICATION PROCESS

ONLINE SUBMISSION FOR GRANTS

Save a tree and some postage. Submit your application online - www.idahohumanities.org. Applications, as

well as required drafts, will be submitted via the council's on line application form. You will log on to a private,

secure system using your email address as your user name. All communication from IHC, including responses

to initial applications, award decisions, and follow-up reporting forms, will be sent via this email address.

Consult with IHC Staff or Board Member

After reviewing the IHC grant guidelines, prospective applicants are advised to discuss their proposed project

with a staff member, board member, or both. These discussions are helpful because they enable prospective

applicants to determine the feasibility of their proposed projects and to gain a clear idea of the objectives,

guidelines, and priority areas of the Council.

Submit an Initial Grant Application

You may review the Application Questions online - the questions for each type of Grant Application are

available as a separate link on IHC's website, under "Grants."

You also may view the application questions when you click on the "Apply" link on the IHC website. You will

be directed to the online site. You will create a secure account (more information is on the website) and will

then click the "apply" button. When you select the appropriate application process to which you are applying,

you may click on the "Preview" button and then the "Question List" button at the top of the page to print or

download the list of questions for that grant type.

Each applicant for a Major Grant is required to submit an initial application one month prior to the final

deadline date.

The staff will review the initial application, giving special attention to the degree to which the proposed

project promises to meet program guidelines and also to the proposed budget. An applicant may revise their

initial application and then submit the final application by the deadline date.

Submit a Final Application on or Before the Appropriate Deadline

Applicants should submit complete applications online by the deadline date. The final application must be

signed by the authorizing official, project director and the fiscal agent. Project director and fiscal agent cannot

be the same person, but the authorizing official may be the same as either. Electronic signatures are

acceptable. Answering the signature question on the application with "I Agree" signifies that all parties have

agreed to the submission of the application to the Idaho Humanities Council.

7

Page 36: Planning ai Development Services

CRITERIA FOR REVIEW

Applicants need to be aware that their enthusiasm for and understanding of given program ideas are

conveyed to IHC chiefly through carefully written applications in which the thinking behind the project

concept becomes evident. In reviewing applications, IHC board members examine the following guidelines:

► The project is centered in one or more of the humanities disciplines.

► The project is focused on a topic, text, or idea that is analyzed and discussed using the methodology of

the humanities.

► Humanities scholars are involved in the project, and critical thinking and interpretation are evident

throughout the program.

► Scholars and the audience are involved in disciplined dialogue benefiting both.

► Members of the intended audience participated in the planning and implementation of the project.

The topics and formats proposed are suitable to the audience and promote active participation.

► The roles of all scholars and resource persons are appropriate to the content and format of the project.

► The budget is clear and reasonable in view of its scope and has sufficient cost-share match.

COST-SHARE MATCHING REQUIREMENTS

Cost-share includes project costs not being paid by IHC. It must be at least equal to the amount requested

from IHC. Cost-share may not include other federal funds. In-kind cost-share includes donated time, facilities,

supplies, duplicating, travel costs, etc. In-kind does not involve cash outlays, but is calculated at a cash value.

Cash cost-share includes any items that require a cash outlay.

8