Planned Maintenance Programme 2010-11 What to expect Kitchen and bathroom replacements Heating replacements Electrical upgrades Lift maintenance and replacements Fire prevention District Heating / Communal Heating 10 11 12 14 Planned Maintenance Programme 2010/2011 2
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Planned Maintenance Programme 2010 - 2011

Planned Maintenance Programme

2010-11

Page 2: Planned Maintenance Programme 2010 - 2011

2 Planned Maintenance Programme 2010/2011

Contents

What to expect

Kitchen and bathroom replacements

Heating replacements

Electrical upgrades

Lift maintenance and replacements

Fire prevention

District Heating / Communal Heating

3

4

5

6

7

8

9replacements

Overcladding

The programme and you

At a glance (West Area)

At a glance (East Area)

10

11

12

14

Page 3: Planned Maintenance Programme 2010 - 2011

3Planned Maintenance Programme 2010/2011

What to expect

Stockport Homes is committed to maintaining and investing in customers’ homes and communal areas. We aim to deliver improvements to properties and the environment of estates to meet the aspirations of current and future residents.

This leaflet contains information on the proposed Capital Works to be carried out in the financial year from April 2010 to March 2011. This year’s programme will concentrate mainly on the final year of the Decent Homes Standard.

Stockport Homes has a lot of work planned to maintain and improve your home over the next twelve months. We want you to know what to expect, where and when.

By looking at the tables at the back of this leaflet, you will be able to find out what work will be carried out in your area over the next twelve months.

If you would like a full breakdown of the properties that are included within the programme of works, please contact:

Investment Team, Technical Services Operations Centre, Unit 9, Southside, Bredbury Park Industrial Estate, Bredbury, Stockport SK6 2SP

Tel: 0161 474 4407Email: [email protected]

10

11

12

14

Page 4: Planned Maintenance Programme 2010 - 2011

4 Planned Maintenance Programme 2010/2011

Kitchen and bathroom replacements

The kitchen and bathroom replacement programme is now into its fifth year.

A survey of all the properties in this years programme will be undertaken to find out the condition of the existing kitchen and bathroom. Kitchens and bathrooms that already meet the Decent Homes standard will not be included in the replacement programme.

Customers will be invited to attend a choice event at a location close to their homes, to see and choose from the kitchen and bathroom samples on display. It will also provide an opportunity to meet staff from Stockport Homes and also the contractor who will be involved with the installations.

These works will be carried out in the following areas:

Area Locations covered

East Bredbury, High Lane, Marple, Marple Bridge, Offerton, Romiley, Stockport and various other locations in the Borough

West Bramhall, Cheadle, Cheadle Heath, Cheadle Hulme, Crescent Park, Deneway, Heaton Chapel, Heaton Moor, Heaton Norris, North Reddish, Woodford and various other locations in the Borough

Page 5: Planned Maintenance Programme 2010 - 2011

5Planned Maintenance Programme 2010/2011

Heating replacements

This year the programme for heating replacements contains those that have not been done in previous years and those where the heating system is near to the end of its lifecycle.

These works will be carried out in the following areas:

Area Locations coveredEast Bredbury, Brinnington, Hazel Grove, Offerton, Romiley and

WoodleyWest Adswood, Cheadle, Cheadle Hulme, Edgeley, Heaton

Chapel, Reddish, North Reddish and South Reddish

Page 6: Planned Maintenance Programme 2010 - 2011

6 Planned Maintenance Programme 2010/2011

Electrical upgrades

Electrical upgrades will be carried out across the Borough. A large proportion of this work will be undertaken in conjunction with the kitchen and bathroom replacements.

These works will be carried out in the following areas:

Area Locations coveredEast Bredbury, Brinnington, Compstall, Hazel Grove, Higher

Hillgate, Marple, Offerton and StockportWest Adswood, Cale Green, Cheadle, Davenport, Edgeley, Great

Moor, Heaton Chapel, Heaton Norris, Heaviley and Shaw Heath

Page 7: Planned Maintenance Programme 2010 - 2011

7Planned Maintenance Programme 2010/2011

Lift maintenance and replacements

Stockport Homes has an ongoing lift replacement programme. This programme has been produced following surveys by our consultant and is based on priority need. Due to the nature of such works, we do operate flexibility and should a lift on a scheme deteriorate or fall into failure, we take appropriate action and bring the works forward as required.

The lifts that have been identified for replacement and considered those most at risk, within the 2010/2011 programme include:

Area Locations coveredEast Offerton

Beaver House and Voewood HouseWest Heaton Norris, Lancashire Hill

Hanover Towers, Heaton Towers, Norris Towers and Pendlebury Towers

Page 8: Planned Maintenance Programme 2010 - 2011

8 Planned Maintenance Programme 2010/2011

Fire prevention

The aim of fire prevention is to eliminate or reduce the risk from the spread of fire in multiple occupied properties. The fire risk assessment reports make recommendations on physical improvements needed in communal areas to bring properties up to the standards required under the Regulatory Reform (Fire Safety) Order 2005.

The areas that have been identified where fire prevention works are required to be completed within the 2010/2011 programme include:

Area Locations coveredEast Beaver House, Brecon Towers, Conway Towers, Ludlow

Towers, Dunton Towers and Hollow End TowersWest Hanover Towers and Pendlebury Towers

Page 9: Planned Maintenance Programme 2010 - 2011

9Planned Maintenance Programme 2010/2011

District Heating / Communal Heating replacements

Many properties are heated by a communal heating system. This programme covers the replacement and upgrade of those that are considered to be in priority need of replacement.

These works will be carried out in the following locations:

Area Locations coveredWest Lancashire Hill

Page 10: Planned Maintenance Programme 2010 - 2011

10 Planned Maintenance Programme 2010/2011

Overcladding

The overcladding to properties improves the aesthetics of the area as well as delivering a considerable saving on fuel bills. This highly efficient external wall insulation is fixed to the outside of the property and then finished with a tough, long lasting finish.

These works will be carried out in the following locations:

Area Locations coveredVarious Palatine House, Gardener Grange and non- traditionally

built properties

Page 11: Planned Maintenance Programme 2010 - 2011

11Planned Maintenance Programme 2010/2011

The programme and you

If your home is included within the Planned Maintenance Programme, Stockport Homes will contact you to confirm that your home has been included and discuss with you in more detail the exact works to be undertaken.

In addition to the main programme of works, additional miscellaneous projects will be carried out including:

• pre-paint painting and repairs;• communal area painting;• maintenance work to garages, fences and gates; and • sustainability works.

Page 12: Planned Maintenance Programme 2010 - 2011

12 Planned Maintenance Programme 2010/2011

At a glanceWest Area 2010/2011

Fire prevention

Lift maintenance and replacement

Kitchen and bathroom replacements

District Heating / Communal Heating replacement

Central Heating replacements

Overcladding

Sustainability works

Electrical upgrades

Are

a

••

Ads

woo

d

••

Bra

mha

ll

Brid

geha

ll

•C

ale

Gre

en

••

•C

head

le

••

Che

adle

Hea

th

••

•C

head

le H

ulm

e

••

Cre

scen

t Par

k

Page 13: Planned Maintenance Programme 2010 - 2011

13Planned Maintenance Programme 2010/2011

West Area 2010/2011

At a glance•

Dav

enpo

rt

••

Den

eway

••

••

•E

dgel

ey

•G

reat

Moo

r

••

•H

eato

n C

hape

l

••

Hea

ton

Moo

r

••

••

Hea

ton

Nor

ris

•H

eavi

ley

•R

eddi

sh

••

•N

orth

Red

dish

•S

outh

Red

dish

••

••

Lanc

ashi

re H

ill

•S

haw

Hea

th

••

Woo

dfor

d

••

•Va

rious

Page 14: Planned Maintenance Programme 2010 - 2011

14 Planned Maintenance Programme 2010/2011

At a glance

Area Fire

pre

vent

ion

Lift

m

aint

enan

ce

and

re

pla

cem

ent

Kit

chen

and

b

athr

oo

m

rep

lace

men

ts

Cen

tral

Hea

ting

re

pla

cem

ents

Ele

ctri

cal

upg

rad

es

Bredbury • • •Brinnington • • •Compstall •Great Moor

Hazel Grove • •High Lane •Higher Hillgate •Marple • •Marple Bridge •Offerton • • • • •Romiley • •Stockport • • •Woodley • •Various •

East Area 2010/2011

Page 15: Planned Maintenance Programme 2010 - 2011

15Planned Maintenance Programme 2010/2011

Area Fire

pre

vent

ion

Lift

m

aint

enan

ce

and

re

pla

cem

ent

Kit

chen

and

b

athr

oo

m

rep

lace

men

ts

Cen

tral

Hea

ting

re

pla

cem

ents

Ele

ctri

cal

upg

rad

es

Bredbury • • •Brinnington • • •Compstall •Great Moor

Hazel Grove • •High Lane •Higher Hillgate •Marple • •Marple Bridge •Offerton • • • • •Romiley • •Stockport • • •Woodley • •Various •

Notes

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

........................................................................................................

........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

.........................................................................................................

Page 16: Planned Maintenance Programme 2010 - 2011

Accessing our services

This leaflet gives you information on the Planned Maintenance Programme April 2010 to March 2011. If you would like a copy in large print, Braille, on audio tape or CD, please contact the Social Inclusion Team on 0161 474 2854 or email: [email protected]