Top Banner
Folsom Dam Auxiliary Spillway Control Structure Project budget Project type $250,000,000 Heavy Civil Rework cost avoided Saved per week per person SAVINGS WITH PLANGRID PlanGrid is an essential tool for our superintendents and engineers. — Larry Camilleri, Project Engineer $3.25M 6 hrs Fo�som, Calif� �nia www.plangrid.com 03
1

PlanGrid Project Success Story: Granite, Folsom Dam

Jan 20, 2017

Download

Technology

PlanGrid
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PlanGrid Project Success Story: Granite, Folsom Dam

Folsom Dam Auxiliary Spillway Control Structure

Project budget

Project type

$250,000,000

Heavy Civil

Rework cost avoided

Saved per week per person

SAVINGS WITH PLANGRID

PlanGrid is an essential tool for our superintendents and engineers.

— Larry Camilleri, Project Engineer

$3.25M 6 hrs

Granite

Fo�som,Calif� �nia

www.plangrid.com 03