PROPOSED 20" PIPELINE 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+38 HDD ENTRY/EXIT N39.893592 W75.431051 SE PENNSYLVANIA RR N39.897363 W75.434522 GLEN RIDDLE ROAD N39.895916 W75.433190 SUNOCO EASEMENT LIMITS - NOT LOD PROPOSED 16" PIPELINE GEOTECH SB-03 GEOTECH SB-04 -100 0 100 200 300 -100 0 100 200 300 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 1247' STA. 29+47 EL. 31' HDD ENTRY/EXIT 33+38 EL.69' 10°' 60' 43' R=2000' L=347' S=349' EXISTING TELEPHONE 19+86 GLEN RIDDLE ROAD 23+00 EXISTING SEWERLINE 26+42 UNDERGROUND ELECTRICAL 26+90 EXISTING WATERLINE 26+34 UNDERGROUND ELECTRICAL 23+56 EXISTING WATERLINE 23+24 EXISTING SEWERLINE 23+08 EXISTING GAS LINE 22+76 EXISTING WATERLINE 21+90 OVERHEAD ELECTRIC 22+81 EDGE OF WETLAND I1 CL STREAM S-I2 32+36 EDGE OF WETLAND I1 14' STA. 32+95 EL. 62' APPROXIMATE BEDROCK GEOTECH SB-03 18+62, 57' RT GEOTECH SB-04 29+68, 112' RT APPROXIMATE BEDROCK -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 20 03/27/15 09/30/16 02/26/16 05/10/16 GLEN RIDDLE RD, SOUTHEASTERN PENNSYLVANIA RR 1"=200' PA-DE-0100.0000-RRb DELAWARE COUNTY, PENNSYLVANIA - UPPER CHICHESTER TOWNSHIP S3-0620 A ISSUED FOR REVIEW JAM RMB AAW 03/27/15 08/31/15 03/27/15 EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 DLM RMB AAW 09/30/16 07/31/15 09/30/16 EP1 REVISED PER PADEP COMMENTS MRS RMB AAW 05/10/16 ES-6.18 05/10/16 EP MRS RMB AAW 02/26/16 SHEET 13 02/26/16 C ISSUED FOR BID / DESIGN CHANGE MRS RMB AAW 08/31/15 ES-6.20 08/31/15 B ISSUED FOR BID DLM RMB AAW 07/31/15 SHEET 12 07/31/15 3338' 3373' 0 FEET 100 100 200 STA 17+00 GRADE PULLBACK ALONG ROW EXISTING SUNOCO PIPELINES PA-DE-0103.0001 GLEN RIDDLE RD SEE PA-DE-0100.0000-RRa NOTE: REFER TO TEST BORING LOG S3-0620 FOR COMPLETE SOIL MATERIAL DESCRIPTION -NG EL. 127' GEOTECH SB-03 -TOPSOIL (0' - 0.5') -COMPLETION DEPTH EL. 86' -GROUNDWATER (28.0') -SM (0.5' - 31.0') -WEATHERED GNEISS (28.0' - 41.0') -SC (0.1' - 4.0') -NG EL. 72' GEOTECH SB-04 -TOPSOIL (0' - 0.1') -CL (4.0' - 6.5') -COMPLETION DEPTH EL. 60' -WEATHERED GNEISS (12.0' - 12.3') -GROUNDWATER (4.0') -SM (6.5' - 12.0')