UTILITY REVIEW PROCESS • Go to www.denvergov.org/pwpermits and download/save the documents under Utility Plan Review section titled: – UPR Application (PDF) – UPR Submittal Checklist (PDF) – Required Plan Notes (PDF) – UPR Submittal Guide (PDF) • Check if the following special requirements apply to your project: – Construction in a FEMA Floodplain – See slide No. 2 – Project has multiple, non-continuous conduit installations (bundled projects) – See Slide No. 3 • Use UPR Submittal Guide and Submittal Checklist to assist in preparing construction plans – Example plans are provided on Slide No. 4 • Refer to UPR Submittal Guide for the following: – Initial submittal requirements and fees – Comment resolution process – Final submittal requirements 1
5
Embed
Plan Review section titled · Utility Plan Review fees are lump sum flat fees, due at the time of each submittal. The fee schedule is as follows: Initial Resubmittal Project Type
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UTILITY REVIEW PROCESS
• Go to www.denvergov.org/pwpermits and download/save the documents under Utility Plan Review section titled:– UPR Application (PDF)
– UPR Submittal Checklist (PDF)
– Required Plan Notes (PDF)
– UPR Submittal Guide (PDF)
• Check if the following special requirements apply to your project:– Construction in a FEMA Floodplain – See slide No. 2
– Project has multiple, non-continuous conduit installations (bundled projects) – See Slide No. 3
• Use UPR Submittal Guide and Submittal Checklist to assist in preparing construction plans – Example plans are provided on Slide No. 4
• Refer to UPR Submittal Guide for the following: – Initial submittal requirements and fees