PLAN NOTES · d27 d27 d27 d27 d27 d26 d26 d26 d26 d26 boiler room 220 d30 d29 d28 d27 d29 d29 d7 d30 d30 8 plan north drawing no. dates and revisions notice a r c h i t e c t s e
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
(VFD
-15
)E
(VFD
-14
)E
(VFD
-13
)E
(VFD
-12
)E
(VFD
-11
)E
(VFD
-10
)E
(VFD
-18
)E
(VFD
-19
)E
SUP
PLY
DR
OP
(T
YP
.
FOR
ALL
HR
U'S
)
(VFD
-20
)E
(VFD
-9)E
(VFD
-8)E
(VFD
-7)E
(VFD
-6)E
EXISTING SUPPLY DROP
(TYP. FOR ALL HRU'S)
D
E
F
13
121110987654321
C.7
G
40"x36"
48
"x1
8"
48
"x1
8"
44
"x4
4"
26
"Ø
26
"Ø
26
"Ø
26
"Ø
26
"Ø
34"Ø 44"Ø
22"Ø
22"Ø
24"Ø
36
"Ø
24"Ø
24"Ø
24
"Ø
24
"Ø
24"Ø26"Ø
34"Ø 30"Ø
26
"Ø
26
"Ø26
"Ø
44
"x4
4"
42
"x4
2"
40"Ø 24"Ø
24
"Ø
24
"Ø
24
"Ø
24
"Ø
44
"x2
6"
8"Ø
12"Ø
8"Ø8"Ø
8"Ø
8"Ø8"Ø 8"Ø
8"Ø8"Ø
14"x14"
44"x44"
32
"Ø
20"Ø
20"Ø
26
"Ø
20
"Ø
20
"Ø
26
"Ø
26
"Ø
40
"x3
6"
44
"x2
6"
44
"x2
6"
D1
D1
D1
D1
60
"x3
6" 40"x40"
44
"x2
6"
44
"x2
6"
18"x12"
12"x18"12"x18"
16"x12"
D8
D8
D8
D8
(TYP.)
D8
D8
D8
D8
D8D8
D7 D7
D6 (TYP. FOR
ALL VFDs)
(VFD
-17
)E
(VFD
-16
)E
D11
D11
D11
D11
D11
D14
D21D21
D21
D7
D22
D22
D22
D22
D22
D22
D22
D23
D23D23
D23
D23
D23
D23 D23
D23
D23
D23
D23
D23
D23
AREA A
AREA B
AR
EA
A
AR
EA
C
D24
D25
D22 D22
D22
D22 D22 D22
D22
D22
D22 D22 D22
D26D27
D27D27
D27
D27
D26
D26D26D26
D26
BOILER ROOM
220
D30
D29
D28
D27
D29
D29
D7
D30
D30
8
PLAN
NORTH
DRAWING NO.
DATES AND REVISIONS
NOTICE
ARCHIT
EC
TS
SREE
NIG
NE
C
®
ONS
T
RU
CT
IO
NM
AN
AG
ERS
THIS ARCHITECTURAL AND
ENGINEERING DRAWING IS GIVENIN CONFIDENCE. NO USE OR
PLAN NOTES18 DROP CONDENSATE DRAINAGE PIPING & DISCHARGE TO FLOOR DRAIN IN THIS LOCATION.32 EXTEND HWS/HWR PIPING TO UNIT HEATERS.39 HYDRONIC PIPING UP TO MAKEUP AIR UNIT.40 HYDRONIC PIPING UP TO DOAS UNIT.73 PRE-INSULATED SNOW MELT SUPPLY AND RETURN PIPING BELOW GRADE. SEE M5.3 SNOW
MELT DETAILS. COORDINATE WITH SITE UTILITIES.74 SNOW MELT MANIFOLD BOX. SEE M5.3 SNOW MELT DETAILS.
GI
R
S
S
RP
FE
O
E E
T
L
IG
S
N AO N
RE
E
D
I
R
S
EN
E
HTAT
S
E O F
MACE E-50556
O
OI
MONTGOMERY E-66852
GRIFFIN E-57049
GENERAL NOTESA. PROVIDE REFRIGERANT PIPING FOR ALL VRF, HEAT PUMPS AND DUCTLESS SPLIT SYSTEMS. SIZE PER MFR'S RECOMMENDATIONS. B. PROVIDE EXPANSION DEVICES AND ANCHORS AS REQUIRED. REFER TO SPECIFICATIONS FOR DELEGATED DESIGN REQUIREMENTS.
8
jbrevick
Snapshot
B
C
121110987654321
A
2M3.01
6"
6"
5" 5"
3"3"
2 1/
2"
2 1/
2" 2 1/
2"
2 1/
2"
2 1/
2"
2 1/
2"
5"5"
4"4"
2 1/
2"
2 1/
2"
2 1/
2"2 1/
2"
2 1/
2"
2 1/
2"
HWS
HWR
2 1/2"
2 1/2" 39
3939
39
3939
3939
39393939
3939
3939
HWSHWR
UH-9
UH-10
TEMP FACILITIESSHOPT103
TEMP FARERECEIVING
T102
TEMP LINEMANAGER
T101
CONTROLROOM
301
GARAGESTORAGE
260
3"3"
4"4"
??
2 1/2"2 1/2"
PLAN NORTH
DRAWING NO.
DATES AND REVISIONS
NOTICE
ARCHITEC
TS
SREE
NIG
NE
C
®
O N S T RU
CT
I ON
MA
N
AGERS
THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN
PLAN NOTES39 HYDRONIC PIPING UP TO MAKEUP AIR UNIT.
GI
R
S
S
RP
FE
O
E E
T
L
IG
S
N AO N
RE
E
D
I
R
S
EN
E
HTAT
S
E O F
MACE E-50556
O
OI
MONTGOMERY E-66852
GRIFFIN E-57049
GENERAL NOTESA. PROVIDE REFRIGERANT PIPING FOR ALL VRF, HEAT PUMPS AND DUCTLESS SPLIT SYSTEMS. SIZE PER MFR'S RECOMMENDATIONS. B. PROVIDE EXPANSION DEVICES AND ANCHORS AS REQUIRED. REFER TO SPECIFICATIONS FOR DELEGATED DESIGN REQUIREMENTS.
REQ'D ACCESS:1. - SINGLE POINT POWER CONNECTION.2. - INSTALL UNIT ON VIBRATION ISOLATION PADS (MIN. 1/4" DEFLECTION) FURNISHED BY UNIT MANUFACTURER.2. - INCLUDE CONDENSER WALL MOUNTING BRACKET MANUFACTURED BY CONDENSER MANUFACTURER.4. - PROVIDE WIND BAFFLE FOR LOW AMBIENT (0°F) OPERATING CONDITIONS.5. - PROVIDE WITH INVERTER DUTY COMPRESSOR.
TAG REFRIG. LINE SIZESSERVICE LIQUID/SUCTION MAX MINCAPACITY (MBH) REQ'D
ACCESS.ELECTRICAL DATA
VOLTS PHASE MOCPMCA
- R-410A REFRIGERANT - COOLING CAPACITY BASED ON INDOOR CONDITIONS OF 80.0°F DB / 67.0°F WB AND OUTDOOR CONDITIONS OF 95.0°F DB
DSO-1 208 1SEE DSI-1 UNIT 12.0 5.8 1,2,3,4,52811
2. DIRECT EXPANSION COIL PACKAGE WITH FACTORY MOUNTED LINEAR EXPANSION VALVE.
- COOLING CAPACITY BASED ON INDOOR CONDITIONS OF 80.0°F DB / 67.0°F WB AND OUTDOOR CONDITIONS OF 95.0°F DB
1. ALL TEMPERATURE SENSORS AND CONTROLS SHALL BE PROVIDED BY THE UNIT MANUFACTURER. PROVIDE REMOTE MOUNTED THERMOSTAT.
5. WASHABLE FILTER
3. R-I-S VIBRATION ISOLATORS.
REQ'D ACCESS:
TAG CFMTYPE MINMAXCAPACITY (MBH)
GASLIQUIDREFRIG. LINE SIZES
MOCPAMPPHASEVOLTELECTRICAL DATA REQ'D
ACCESSSERVES
4. UL LISTED
MODELMFR
MITSUBISHI
MFR MODEL
PUY-A12NKA7
6. INDOOR UNIT ELECTRICALLY FEED FROM OUTDOOR UNIT VIA ASSEMBLY CABLE.7. DAYLIGHT DRAINAGE TO EXTERIOR WALL OF CNG CONTROL ROOM.
IT
DS0-2 208 1SEE DSI-2 UNIT 18.0 8.0 ALL2811 MITSUBISHI PUY-A18NKA7
CNG EQUIP.RM.
6. - OUTDOOR UNIT MOUNTED ON ROOF ABOVE CONTROL ROOM.
* - INDOOR UNIT POWERED BY OUTDOOR UNIT** - REFRIGERANT LINE SIZED BY MANUFACTURER'S RECOMMENDATION
1.- STANDARD DISCONNECT, FACTORY MOUNTED & WIRED2.- GRAVITY BACKDRAFT DAMPER & WEATHER HOOD3.- WALL BOX, REMOVEABLE SCREEN & BIRD SCREEN4.- PROVIDE WALL BRACKET SUPPORT & MOUNTING FLANGE5.- STANDARD FINISH, COLOR BY ARCHITECT6.- SPUN ALUMINUM W/ALUMINUM BIRDSCREEN.7.- AIR DRIED EXPOXY FINISH - ENTIRE FAN INCL ACC8.- R-I-S VIBRATION ISOLATION HANGERS9.- ALUM. CANTED ROOF CURB W/INSULATION 18" H &W/WOOD NAILER10.- ALUMINUM STEEL CAP & BOLTED INSPECTION DOOR.11.- UL 762 LISTING12.- ALUMINUM BIRDSCREEN
14.- TOTALLY ENCLOSED MOTOR SHALL BE CLASS 1, DIV I,& EXPLOSION RESISTANT, AMCA SPARK PROOF B FAN.15.- THREADED PIPE DRAIN CONNECTION.16.- WEATHERHOOD.17.- SPARK RESISTANT CONSTRUCTION.18.- FACTORY MOUNTED & WIRED DISCONNECT
PROVIDED BY BAS CONTRACTOR:21.- TIME SCHEDULED DDC ON/OFF22.- WALL MOUNTED DDC SPACE SENSOR23.- WALL MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC24.- UNIT MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC25.- HARDWIRE INTERLOCK ASSOCIATEDMOTORIZED DAMPER WITH FAN26.- HARDWIRE INTERLOCK FAN TO CNG GASDETECTION SYSTEM.
PROVIDED BY HC WITH UNIT:31.- WALL MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC32.- UNIT MOUNTED THERMOSTAT -MOUNTED & WIRED BY EC33.- INTEGRAL THERMOSTAT - FACTORYMOUNTED & WIRED.34.- PROVIDED WITH REMOTE VFD, NEMA 12ENCLOSURE.
PROVIDED BY BAS CONTRACOR:
51.- CNG GAS DETECTION SYSTEM SHALLBE HARDWIRED INTERLOCKED TO BAS.BAS TO ACTIVATE EVAUCATION MODEAND OPEN ALL GARAGE DOORS FIRSTAND THEN ENGERIZE EXHUAST FAN.
1.- FACTORY MOUNTED & WIRED SINGLE POINT CONNECTION. FACTORY MOUNTED DISCONNECT.2.- MIN. 5:1 TURNDOWN RATIO.3.- BASIS OF DESIGN RBI & HYDROTHERM KN, EQUAL MANUFACTURER'S: PATT. KELLY, AERCO, LOCHINVAR CREST, & THERMALSOLUTIONS.
NOTES:A.- MAX OUTPUT BASED ON 50°F EWTB.- MIN. OUTPUT BASED ON 140° EWTC.- BOILERS MAY BE ALL CONDENSING TYPEOR HYBRID OF CONDENSING & FIRE TUREWITH MIN. OF (2) CONDENSING BOILERS.
1.- PROVIDE VFD MOUNTED ON ADJACENT WALL. ALL VFDs TO BE BY THE SAME MFR.2.- DISCONNECT BY EC. MOTOR SHALL BE NON-OVERLOADING.3.- FACTORY MOUNTED & WIRED DISCONNECT SWITCH.
1. FACTORY WIRED SINGLE POINT CONNECTION W/ WALL MOUNTED MOTOR CONTROL PANEL NEMA 1 ENCLOSURE.2. PROVIDE WITH (2) MICROSWITCH3. ALUMINIZED STEEL, WITH EXPOXY COATING4. PROVIDE W/ EXPLOSION PROOF MOTOR, AND JUNCTION BOX.
MAU-8thru 15
4.- PROVIDE DEDICATED MAKE-UP AIR UNIT CIRCULATOR FOR EACH MAU & DOAS-1.
REQ'D ACCESS
TAG DESCRIPTION HEATINGKW (MIN)MBH KW (MAX) MFR MODELELEC SERVICE
AMP VOLT PHASESERVICE CFM
UH-9 ELECT. UNIT HEATER CNG CONTROL RM 850 HEX5 ALL25.6 7.5 7.5 9.0 480 3
- THREE (3) PHASE COIL LOADS SHALL BE DIVIDED EVENLY ACROSS EACH PHASE- ELEC SERVICE TO THREE (3) PHASE UNITS TO BE THREE (3) WIRE UNLESS NOTED
REQ'D ACCESS
- VERIFY/COORDINATE CABINET DIMENSIONS MOUNTING AND RECESSREQUIREMENTS WITH ARCHITECTURAL DWGS PRIOR TO ORDERING
MODINE
TAG
UH-03
UH-04
UH-05
UH-06
UH-07
UH-08
-
UH-01
UH-02
- HEATING CAPACITY BASED ON 60°F EAT & 180°F LWT, 200°F EWT
1.- UNIT-MOUNTED THERMOSTAT.2.- PROVIDE MOUNTING BRACKET.
4.- EXPLOSION PROOF.3.- PROVIDE FACTORY MOUNTED DISCONNECT.
VEF-1 THRU MAINT BAY 800 3.2 3173 GREENHECK *460 3
REQ'D ACCY:
TAG SERVICE /VOLTAGE
MOTOR DATACFM HP PHASE FAN MODELRPM REQ'DACCY
** - REFER TO SPECIFICATIONS FOR LIST OF APPROVED MANUFACTURERS
FAN MFR **TSP (IN)
ALL
2.- TOTALLY ENCLOSED MOTOR.3.- ALUMINUM BACKDRAFT DAMPER.4.- WEATHERHOOD FOR FAN MOTOR.5.- FAN TO HAVE AMCA SPARK B CONSTRUCTION.
6.- FAN TO HAVE STANDARD FINISH, COLOR BY ARCHITECT.7.- FAN TO BE CONTROLLED BY SWITCH IN MAINTENANCE BAY, PROVIDED BY EC.8.- PROVIDE HIGH TEMPERATURE( 800 C / 1500 F MIN. ) 8"Ø HOSE ID, 25 FOOTLONG HOSE, WITH RETRACTING HOSE REEL, AUTOMATIC RECOIL, LOCK & LATCH.9.- PROVIDE 3 TAIL PIECES/NOZZLES(STANDARD ROUND, OVAL & WHALETAIL)FOR EA HOSE REEL.
VEF-19 MONOXIVENT 7150
HOSE REEL MODELHOSE REEL MFR **LOCATION
* - MODEL NUMBER FJI-09-BI-X
REQUIRED FOR ALL FANS:PROVIDE VFD MOUNTED TO FANINSIDE NEMA 3R ENCLOSURE. ALLVFDs TO BE BY SAME MFR.
1. PROVIDE SINGLE POINT 480-3-60 SINGLE POINT POWER CONNECTION AND A SEPARATE FEED OF 120VOLT, 1Ø CONNECTION TO UNIT FOR ALL LIGHTS AND GFI RECEPTACLES.JUNCTION BOX AND ALL ELECTRICAL CONNECTIONS INSIDE AIRSTREAMS TO BE CLASS 1, DIVISION 1.2. MAX. FILTER VELOCITY 500 FPM. PROVIDE V BLANK TYPE FILTERS.3. 2" DOUBLE WALL STEEL EXTERIOR UNIT CASING, HEAVY 18 GAUGE W/POWDER COATING.4. ALL SECTIONS WITH SHALL HAVE WASH DOWN CAPABILITIES.5. PROVIDE ALUMINUM AIR TO AIR PLATE TYPE HEAT EXCHANGER, ONLY. ALUMINUM TREAD FLOOR W/WASH DOWN CAPABILITIES.6. PROVIDE FACTORY TESTING AND AHU UNITS SHALL BE FACTORY SHRINKED WRAPPED AND SHIPPED TO SITE. COORDINATE WITH CM.7. PROVIDE TWO ROW COIL. UNIT MANUFACTURER HAS OPTION TO PROVIDE ONE ROW COIL IF HEATING LOAD IS MEET.
13.- FACTORY MOUNTED & WIRED DISCONNECT: CLASS I,DIV I CIRCUITRY, MOUNTED EXTERNALLY IN NEMA 3ROUTDOOR ENCLOSURE.
1.- FACTORY MOUNTED & WIRED DISCONNECT: CLASS I, DIV I CIRCUITRY,MOUNTED EXTERNALLY IN NEMA 3R OUTDOOR ENCLOSURE.
8. MANUFACTURER TO BE PRESENT DURING START-UP, AND PROVIDE AN OFFICIAL START-UP REPORT
REQ'DACCESS
CAP'Y(MBH)
CFMELECTRICAL DATA GPM MODELMFR.RUNOUTSIZE (IN.)
115 32401 MODINE8.61/3
45.6
130.9
1/3
1/12
1/12
1/12
730
1120
3240
1120
3240
730
4.7
13.6 1-1/2
1/3
HC 47
HC 63
HC 165
HC 47
7301/12 HC 47
7301/12 HC 47
32401/3 HC 165
11201/12 HC 63
ALL
1/12
7301/12 HC 47
REQ'D ACCESS.1. LINE VOLTAGE THERMOSTAT (HEAVY DUTY), EXPLOSION-PROOF MOTOR & THERMAL OVERLOAD2. OSHA FAN GUARD3. BAKED PHENOLIC COATING4. EXPLOSION PROOF
HC 47
1/12 730 30.9 13.2 HC 47
VOLTS PHASE HP (W)
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
115 1
- -
- -
- -
- -
- -
- -
MAXP.D.
MODINE8.6
MODINE0.6
MODINE8.6
MODINE8.6
MODINE0.6
MODINE0.4
MODINE0.6
MODINE8.6
MODINE0.4
MODINE0.4
MODINE0.4
MODINE0.4
MODINE0.4
MODINE0.4
MODINE0.4
MODINE0.4
MODINE
MODINE
MODINE0.4
MODINE0.4
--
--
--
--
--
--
130.9 13.6
130.9 13.6
45.6 4.7
30.9 3.2
45.6 4.7
130.9 13.6
30.9 3.2
30.9 3.2
30.9 3.2
30.9 3.2
1-1/2
1-1/2
1
1
1
1-1/2
1
1
1
1
ALL
1,2,3,4
1,2,3,4
ALL
1,2,3,4
1,2,3,4
1,2,3,4
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
-
-
-
-
-
-
1
130.91/3 3240 13.6 1-1/2
30.91/12 730 3.2 1
30.91/12 730 3.2 1
30.91/12 730 3.2 1
1
1/12 730 30.9 13.2 HC 47
- - - -- -
- - - -- -
- - - -- -
- - - -- -
- - - -- -
- - - -- -
-- -
-- -
-- -
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
-
-
-
-
-
HORIZONTAL PROJ.
HORIZONTAL PROJ.
HORIZONTAL PROJ.
-
-
-
- ---- - - -
- ---- - - -
- ---- - - -
HORIZONTAL PROJ.
1/12 730 30.9 3.2
HORIZONTAL PROJ. 1/12 730 30.9 3.2
1/12 730 30.9 3.2
1 0.4
1 0.4
HC 47
HC 47
HORIZONTAL PROJ.
HC 47
HC 47
HC 47
HC 165
HC 63
HC 165
HC 165
-- - - ---- - - -
-- - - ---- - - -
-- - - ---- - - -
-
-
-
TYPE
-
8
8
8
8
DRAWING NO.
DATES AND REVISIONS
NOTICE
ARCHITEC
TS
SREE
NIG
NE
C
®
O N S T RU
CT
I ON
MA
N
AGERS
THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN