Top Banner
Plan Cost Effective Construction 6831.22
39

Plan Cost Effective Construction 6831.22 Planning Construction.

Dec 27, 2015

Download

Documents

Donna Byrd
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Plan Cost Effective Construction 6831.22 Planning Construction.

Plan Cost Effective

Construction6831.22

Page 2: Plan Cost Effective Construction 6831.22 Planning Construction.

Planning Construction

Page 3: Plan Cost Effective Construction 6831.22 Planning Construction.

Plan, Sketch, Drawing• Before starting new construction or

repair jobs of any size, a plan, sketch, or drawing should be made to reduce costs, save time, improve quality of workmanship, and determine the need for the construction or repair projects

Page 4: Plan Cost Effective Construction 6831.22 Planning Construction.

Specifications• The best way to guarantee

high quality materials and workmanship in construction projects is to include specifications in plans and contracts

Page 5: Plan Cost Effective Construction 6831.22 Planning Construction.

Time to Be Completed

• Time to be completed is a major consideration in planning agricultural construction or repairs because of the seasonal nature of farming

Page 6: Plan Cost Effective Construction 6831.22 Planning Construction.

Cost•The cost of a project is an important factor in planning construction

Page 7: Plan Cost Effective Construction 6831.22 Planning Construction.

Bill of Materials•A bill of materials is an itemized list of materials and their costs

Page 8: Plan Cost Effective Construction 6831.22 Planning Construction.

Calculating Carpentry Materials

Page 9: Plan Cost Effective Construction 6831.22 Planning Construction.

Square Foot• Many building materials

are sold by the square foot or in units that combine square footage such as a square or a sheet

Page 10: Plan Cost Effective Construction 6831.22 Planning Construction.

Square Foot•A square foot is 1 foot (12”) by 1 foot (12”) or 144 square inches

Page 11: Plan Cost Effective Construction 6831.22 Planning Construction.

Length x Width• Calculate number of

square feet by multiplying length times width in feet

• Example: 8 feet x 10 feet = 80 sq. ft.

Page 12: Plan Cost Effective Construction 6831.22 Planning Construction.

Length x Width•A 4’ x 8’ sheet of plywood has how many square feet?

•32 sq. ft.

Page 13: Plan Cost Effective Construction 6831.22 Planning Construction.

Square of Shingles• A square of shingles has

enough shingles to cover how many square feet

• 100 sq. ft.

Page 14: Plan Cost Effective Construction 6831.22 Planning Construction.

Estimating Cost• One story building costs

can be estimated by using sq. ft.

• Example: 1000 sq. ft. x $10/sq.ft. = $10,000

Page 15: Plan Cost Effective Construction 6831.22 Planning Construction.

Drawing Construction Plans

Page 16: Plan Cost Effective Construction 6831.22 Planning Construction.

Plans• Plans drawn on paper save

time and money because changes are faster and less expensive to make on a plan than on the real structure

Page 17: Plan Cost Effective Construction 6831.22 Planning Construction.

Types of Drawings• Types of drawings used in

construction include sketches, hand drafted drawings, and computer assisted drawing

Page 18: Plan Cost Effective Construction 6831.22 Planning Construction.

Views and Dimensions

•Many construction drawing are based on view or dimensions

Page 19: Plan Cost Effective Construction 6831.22 Planning Construction.

Orthographic•Two dimensional view

Page 20: Plan Cost Effective Construction 6831.22 Planning Construction.

Isometric• Three dimensional view

that shows object as a whole instead of parts and shows the object in a form similar to a picture, is drawn to scale

Page 21: Plan Cost Effective Construction 6831.22 Planning Construction.

Perspective• Is similar to isometric

because it is three dimensional and appears on the drawing as it does to the eye, but it is NOT drawn to scale

Page 22: Plan Cost Effective Construction 6831.22 Planning Construction.

Sectional View•Shows a vertical cross-section of the object

Page 23: Plan Cost Effective Construction 6831.22 Planning Construction.

Mechanical Drawings

•Are used when a detailed description is needed

Page 24: Plan Cost Effective Construction 6831.22 Planning Construction.

Three-view Drawing

•Is used to show the front, top and end of the object

Page 25: Plan Cost Effective Construction 6831.22 Planning Construction.

Constructing a Carpentry Project

Page 26: Plan Cost Effective Construction 6831.22 Planning Construction.

Purpose• Purpose of constructing a

project in agricultural mechanics shop is to provide hands on learning or application of what has been leaned in class

Page 27: Plan Cost Effective Construction 6831.22 Planning Construction.
Page 28: Plan Cost Effective Construction 6831.22 Planning Construction.

ScopeThe size and complexity of a project is its scope

Page 29: Plan Cost Effective Construction 6831.22 Planning Construction.

Bird Houses• Beginning students should

start with relatively small and simple projects such as nail boxes, tool boxes and bird houses

Page 30: Plan Cost Effective Construction 6831.22 Planning Construction.
Page 31: Plan Cost Effective Construction 6831.22 Planning Construction.

Trailers• Advanced students should

choose more challenging projects that use more skills such as storage buildings, trailers, and farm structures

Page 32: Plan Cost Effective Construction 6831.22 Planning Construction.
Page 33: Plan Cost Effective Construction 6831.22 Planning Construction.

PaintedProjects that will be exposed

to weather should be made from treated wood or should be painted with exterior paint to provide protection for the wood

Page 34: Plan Cost Effective Construction 6831.22 Planning Construction.
Page 35: Plan Cost Effective Construction 6831.22 Planning Construction.

Depends on Use• The width and thickness of

wood needed for a project or for certain parts of a project depend on the use that will be made of the project

Page 36: Plan Cost Effective Construction 6831.22 Planning Construction.

Depends on Use• A work bench or a

livestock or horse barn requires larger sized wood than a bird house or nail box

Page 37: Plan Cost Effective Construction 6831.22 Planning Construction.

Use Bolts• Projects made from both

metal and wood should use bolts to fasten the wood to the metal

Page 38: Plan Cost Effective Construction 6831.22 Planning Construction.

Starts at the Bottom• Because of the nature of

construction and the law of gravity, construction of a building starts at the bottom and continues to the top

Page 39: Plan Cost Effective Construction 6831.22 Planning Construction.

Plan Cost Effective

Construction6831.22