Accessible ¿shing pier Canaoe/kayak launch Circuit trail with excercise stations Pavilion with restrooms BBQ and picnic grove Amphitheater Skate park Pickleball court PRIMARY PARK ENTRANCE - Signage, plantings, and formalized entry sequence welcomes visitors to the park PLAYGROUND - Consolidated playground, reusing existing equipment as possible, and adding a new focal piece of equipment. LITTLE LEAGUE FIELD - 200’ ¿eld size. Unfenced out¿eld creates an open play lawn. Lights added to ¿eld SOFTBALL FIELD - 220’ existing ¿eld accommodates softball or Little League. Existing fence to remain in place. KAYAK/CANOE LAUNCH - Access road to boat launch with turnaround. Temporary parking to unload boats and handicapped parking for pier access. ACCESSIBLE FISHING PIER CIRCUIT TRAIL WITH EXERCISE STATIONS - An 8’ asphalt multi- use trail around the lower portion of the park, with cleared views and access points to the river. Exercise stations spaced along trail. WALKING TRAIL TO OVERLOOK - Rustic foot path DOG PARK - Fenced dog play area with sanitation station. RESTROOM BUILDING PICNIC PAVILION - Pavilion with restrooms and event lawn BBQ AND PICNIC GROVE - Includes steps to connect to lower park area. HORSESHOE PITS (2) EXISTING PICNIC SHELTER EXISTING PICNIC SHELTER - Remove old restrooms and kitchen, renovate as open pavilion. AMPHITHEATER - Regrade hill with stepped amphitheater and ramped path to connect upper and lower portions of park SKATE PARK - Utilize existing grade to create dual-level skate park. BASKETBALL COURT - Remove pool facilities and regrade PICKLEBALL COURTS (2) TRAIL ACCESS TO FUTURE RAIL TRAIL SIDEWALK CONNECTIONS FORMALIZE AND EXPAND PARKING (41 SPACES, PREVIOUSLY 34 SPACES) DISPERSED PARKING (22 SPACES, PREVIOUSLY 25 SPACES) NEW PARKING (12 SPACES) EXPANDED PARKING (46 SPACES, PREVIOUSLY 22) - Install culvert and pipe to bridge the drainage channel. FUTURE PARKING EXPANSION (18 SPACES) POTENTIAL FUTURE PARKING EXPANSION (20 SPACES) OR ALTERNATE PROGRAMMING TOTAL PARKING: 121 SPACES. EXPANDABLE TO 159 (PLAN ADDS 40 PARKING SPACES) PORCH SWING PAVILION - Clear adjacent understory vegetation for views to the river. EXISTING POOLHOUSE AND RESTROOMS - Reuse as storage, update restrooms, consider adding a concession station. BIOFILTER - Develop drainage swale as stormwater treatment bio¿lter PULL-BY AREA KEY 1 4 4 5 5 6 6 7 7 7 30 7 8 8 9 9 10 11 11 14 10 12 12 12 13 14 27 13 15 16 16 17 18 29 28 18 19 19 20 20 21 20 21 22 22 23 17 6 5 7 11 12 15 16 18 14 15 2 2 3 3 23 24 23 24 25 25 26 27 28 29 30 26 1 14b 14b MASTER PLAN June, 2020 TIMBERVILLE, VA PLAINS DISTRICT MEMORIAL PARK NORTH FORK SHENANDOAH RIVER MEMORIAL PARK DRIVE 5th AVE 4th AVE 3rd AVE 2nd AVE W RIVERSIDE DRIVE RR Tracks 23