Page 1: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Placer County Water Agency

Whitney Boulevard Water Main Replacement Project

Open House

August 10, 2016 City of Rocklin Event Center

Page 2: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Team Introductions

Project Background

Pipeline Relocation Plan

Project Area

Project Impacts

Schedule

Future Actions

Questions & Answers

Presentation Overview

Page 3: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

PCWA Staff Kelly Shively – PCWA Construction Manager, (530) 823-4883

Lloyd Wagstaff – PCWA Property Specialist, (530) 823-4881

Sandie Hewston – PCWA Right of Way Technician

Engineering Consultants Sara Rogers - Domenichelli and Associates –Engineer Manager

Tom Dugan– Domenichelli and Associates –Design Engineer

City of Rocklin Justin Nartker– Deputy Director

South Placer Municipal Utility District

Eric Nielsen – District Engineer

Project Team Introductions

Page 4: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Original Pipeline built in 1960s

Project Background

Purpose to replace infrastructure nearing the end of expected service life

Replacement of degrading service materials

Page 5: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Water and sewer lines were installed in landscaped median, making access and maintenance difficult. Relocate existing pipeline out of landscaped median into street ROW

Pipeline Relocation Plan

Page 6: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Project Location

Page 7: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Project Impacts: Metered Service Locations

Page 8: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

EXPECT DELAYS

Watch for signs

Construction equipment ingress/egress

May be multiple crews working throughout the project

Night work at Sunset/Whitney Intersection and Paragon/Whitney Intersection

Project Impacts: Traffic and Noise

Page 9: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Project Impacts

Page 10: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Impact of Project: Roadway Restoration

During installation (Temporary Pavement) Final Restoration

Example

Page 11: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Impacts of Project: Private Property

Residents will be contacted to review individual property impacts if needed

Page 12: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Impacts to Landscaped Median

Landscape will be removed as necessary for installation and abandonments of water services and main lines

Replace vegetation with similar variety, size, and shape.

Page 13: Placer County Water Agency · Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center

Currently in Final Design Construction to be started in Spring 2017 Estimated completion in late Fall 2017

Project Schedule