Placer County Water Agency Whitney Boulevard Water Main Replacement Project Open House August 10, 2016 City of Rocklin Event Center
Placer County Water Agency
Whitney Boulevard Water Main Replacement Project
Open House
August 10, 2016 City of Rocklin Event Center
Team Introductions
Project Background
Pipeline Relocation Plan
Project Area
Project Impacts
Schedule
Future Actions
Questions & Answers
Presentation Overview
PCWA Staff Kelly Shively – PCWA Construction Manager, (530) 823-4883
Lloyd Wagstaff – PCWA Property Specialist, (530) 823-4881
Sandie Hewston – PCWA Right of Way Technician
Engineering Consultants Sara Rogers - Domenichelli and Associates –Engineer Manager
Tom Dugan– Domenichelli and Associates –Design Engineer
City of Rocklin Justin Nartker– Deputy Director
South Placer Municipal Utility District
Eric Nielsen – District Engineer
Project Team Introductions
Original Pipeline built in 1960s
Project Background
Purpose to replace infrastructure nearing the end of expected service life
Replacement of degrading service materials
Water and sewer lines were installed in landscaped median, making access and maintenance difficult. Relocate existing pipeline out of landscaped median into street ROW
Pipeline Relocation Plan
EXPECT DELAYS
Watch for signs
Construction equipment ingress/egress
May be multiple crews working throughout the project
Night work at Sunset/Whitney Intersection and Paragon/Whitney Intersection
Project Impacts: Traffic and Noise
Impact of Project: Roadway Restoration
During installation (Temporary Pavement) Final Restoration
Example
Impacts of Project: Private Property
Residents will be contacted to review individual property impacts if needed
Impacts to Landscaped Median
Landscape will be removed as necessary for installation and abandonments of water services and main lines
Replace vegetation with similar variety, size, and shape.
Currently in Final Design Construction to be started in Spring 2017 Estimated completion in late Fall 2017
Project Schedule
Residents will be notified in advance of planned water outages
Residents will be notified prior to work on individual properties
Visit the Agency’s website for updates on progress: https://www.pcwa.net/general-information/construction-
projects/whitney-blvd-main-replacement.html
Future Actions